• Title/Summary/Keyword: Construction Efficiency

Search Result 3,489, Processing Time 0.031 seconds

Analysis on Durability Performance Enhancement and Economical Efficiency through Chloride Protection for Concrete Structures (콘크리트 구조물의 염해도장을 통한 내구성능 향상 및 경제적 효과분석)

  • Chai, Won-Kyu;Kim, Seong-Heon;Son, Young-Hyun;Park, Ju-Won;Lee, Cheung-Bin
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.6
    • /
    • pp.155-160
    • /
    • 2010
  • In this study, detailed assessment for durability performance were performed on the chloride protected concrete structures to investigate the effectiveness of chloride protection. And economical efficiency for the chloride protected concrete structures were studied by LCC(Life Cycle Cost) analysis. In the comparison result of the first section repair time, it was found that the chloride protected concrete structures was economical better than the non-protected concrete structures in the long term. According to the analysis result of the accumulated chloride concentration by used time and chloride ion concentration by depth, it can be seen that the permeation through time from chloride has increased two times in the chloride protected concrete structures.

Improvement of Bill of Quantities of Door and Window Work for BIM-based Cost Estimation (BIM 기반 견적을 위한 창호공사 내역 작성체계 개선 방안)

  • Kim, Mi-Hyeon;Jo, Chan-Won;Yun, Seok-Heon
    • Journal of KIBIM
    • /
    • v.10 no.2
    • /
    • pp.12-20
    • /
    • 2020
  • Recently, interest in BIM technology has been growing in the domestic construction market as the number of construction projects requiring the application of BIM technology has increased. The use of BIM allows the use of various visualization functions through 3D models as well as drawing interference review, quantity calculation and integrated management of information. In particular, estimates of construction costs based on BIM can increase work efficiency by reducing the burden of calculating construction costs and managing them. In order to increase the efficiency of BIM-based cost estimates, it is necessary to improve the correlation between the BoQ(Bill of Quantity) information and the BIM model. For this purpose, the ratio of the amount and item to the detailed construction of the current BoQ was analyzed, especially the problem of the calculation of construction cost in the window work in this study. In addition, we would like to suggest a method for systematically linking the BoQ information with the BIM model by improving the BoQ information structure of the window work. It is expected that this will increase the efficiency of the quantity calculation and analysis work of construction cost of window work. In addition, it is expected that this method will help to analyze and predict changes in construction cost of windows and doors by facility characteristics and type.

A Study on the Efficiency of Safety Manager in Construction Project Stage (건설공사 사업 단계별 안전관리자 수행업무 효율화에 관한 연구)

  • Kang, Sang-Hun;Park, Hyun-Jung;Kim, Dae-Young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.212-213
    • /
    • 2022
  • Recently, the construction industry is increasingly in need of securing safety rights due to repeated serious accident. Accordingly, the government enacted the "Serious accident Punishment Act" to strengthen punishment for serious accident and expand the scope of punishment. However, safety managers in the construction industry are still vulnerable to safety accidents due to the heavy workload. The purpose of this study is to increase the efficiency of performance tasks and reduce serious accidents in the construction industry through analysis of performance tasks by stages of construction projects. The tasks derived through domestic research and domestic and foreign system analysis were classified step by step to analyze the correlation between difficulty and preventive effect, and inefficient tasks were discovered and improved. This can be used as basic data for identifying safety management tasks and preparing effective safety prevention measures, and it is expected to be a preventive measure against industrial accidents in the construction industry by using it for efficient work reorganization by safety managers.

  • PDF

BUSINESS PROCESS ENGINEERING IN THE CONSTRUCTION INDUSTRY

  • Brenda L. P. Yip;Ping Yung
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.622-627
    • /
    • 2009
  • Business process engineering (BPE) is a top-down management approach for increasing efficiency and productivity through radical and fundamental changes to the business processes of the organization. BPE requires firms to initially develop a model of the existing business processes of the firm to distinguish functional tasks from processes used for coordinating inputs, activities and outputs. The model is used for understanding the business processes in the organization and to simulate the effect of changes to the processes. The model can also be used to justify business processes, which involves assessing whether the business process provides value to the customer in its current configuration. Justification requires a careful examination of the key business processes used by the firm to identify systemic shortcomings in the process and to create a new business process to produce greater efficiency. BPE also considers automating as many business processes as possible to increase operational efficiency and the integration of business process tasks. The construction industry has been slow to adopt BPE because of its project approach in which a major firm contracts with various functional service providers and regards each project as unique. The industry focuses on functional task efficiency rather than business process efficiency. There is no formal methodology or criteria for determining whether a business process is effective for a construction firm in its current configuration. The use of performance measures such as costs, task duration times or other metrics can be useful in evaluating the effectiveness of an existing business process and for modeling the possible outcome of a fundamental and radical change to the process.

  • PDF

Estimation of Construction Equipment Production Rates: Focus on Efficiency Rate (건설기계 시공능력 산정에 관한 연구 : 작업효율 중심으로)

  • Park, Hee-Sung;Han, Ye Lyeong;Huh, Youngki;Ahn, Bang Ryul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.1D
    • /
    • pp.67-72
    • /
    • 2008
  • Heavy equipment is a very important factor for successful construction implementation. Also, the cost for heavy equipment is a major part of construction cost. Therefore, the estimation of equipment cost is a critical job in the construction planning phase. A formula for production rates shown in 'Standard Unit Labor' has been used to estimate construction equipment capability per hour and cost. Although the performance of equipment has been improved, the efficiency rates in the formula are not updated lately. Therefore, this research performed several site visits to measure construction equipment working time and then calculates the efficiency rates for hydraulic backhoe, loader, and dump truck. The results show that the measured efficiencies of backhoe and loader are higher than current ones and vice versa for dump truck. This research proposes the needs for a standardized calculation formula and systematic and long-term data collection and measurement for updating efficiency rates for heavy equipment.

A Study of the Work Efficiency in the High Altitude according to Climatic Elements (지역별 기후에 따른 고소작업가능률 산정 - 서울, 인천, 부산 지역을 중심으로 -)

  • Lee, Hyun-Soo;Cho, Sung-Jun;Park, Moon-Seo;Hwang, Sung-Joo;Kim, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.67-77
    • /
    • 2012
  • O Having a highly reliable plan for the process and estimating an accurate construction period during the early stages of a construction project can prevent falsifying the plan and reduce the occurrence of construction delays. Moreover, it allows a succession of swift and accurate decisions to happen. The difficulty in obtaining an accurate estimate of the construction period is especially prominent in high-rise building projects because the works involved are very complicated and costly. As such, it is important that research is done to find out the impacts a reliable plan and good estimate of the construction period can bring with regards to the monthly work efficiency and success of a high-rise building project. However, due to the difference in climatic conditions at high altitude and surface level, the current way of calculating work efficiency in a typical project is inaccurate for a high-rise building project. With that, this paper aims to compute the work efficiency with height, taking into consideration the change in climatic elements at different working heights. A comparison of the results according to the climatic features of each city can also be done in this paper. According to the results calculated in work altitudes, the work efficiency in Busan falls the most. On the other hands, the work efficiency in Seoul falls the least. The reason these results are shown is the influence of wind speed at high altitude. The estimation of work efficiency at high altitude would be used for estimating construction period, feasibility studies, and selecting a city of high-rise building projects.

A Study on the Extracting the Core Input and Output Variables in Construction Company using DEA and PCA (DEA와 PCA를 이용한 건설기업의 핵심 투입-산출변수 추출에 관한 연구)

  • Lee, Kyung-Joo;Park, Jung-Lo;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.94-102
    • /
    • 2012
  • Recently, the global financial crisis and the increasing number of unsold houses in Korea are construction companies to assess their efficiency. The most important factor in analyzing the efficiency of a company is the input-output variable. However, systematic stud the core input-output variables, which have a great influence on the efficiency analysis. Thus, to the core input-output variables for efficiency analysis of construction companies, this study propose a model that includes all combinations of input-output variables and to find the core input-output variables using the Data Envelopment Analysis(DEA) model and Principal Component Analysis(PCA). Existing research and theories were studied variables and 21 models were established to measure efficiency. were obtained that the core input and output variable in 2006 the number of employees and sales. For 2008, the core input variable was capital stock and the core output variable was quarterly net profit. For 2010, the core input variable was fixed asset and the core output variable was sales. Through obtaining the variables that greatly affect the efficiency of construction companies, it is considered that individual construction companies will be able to prepare a priority strategy to enhance efficiency.

Appraising the Performance of Construction Projects during Implementation in Kenya, 1963-2018: A Literature Review Perspective

  • Ong'ondo, Cyrus Babu;Gwaya, Abednego Oswald;Masu, Sylvester
    • Journal of Construction Engineering and Project Management
    • /
    • v.9 no.2
    • /
    • pp.1-24
    • /
    • 2019
  • Poor project performance has been noted as the bane in the construction industry globally. This paper sought to investigate, by way of literature, the performance patterns of construction projects in Kenya since independence (1963-2018). This was informed by reports of undesirable project performance in the industry. This descriptive study used available studies previously done in this subject area. In sum, literature is replete with evidence on a myriad of challenges facing the execution of projects. The study established that generally, the project performance is poor and has assumed a chronic trajectory spanning over five decades. On average, the findings reveal that 35-60% of projects initiated in Kenya face cost overruns while time overrun is most severe with 35-73% projects overrunning their schedule. In addition, the findings problematize the issue of plurality of performance measurement regimes in the construction industry. Here, it was observed that no singular construct exists to objectively measure the various facets that constitute the 'health' of a project. This paper has contributed to the body of knowledge by examining the performance patterns in Kenya for over fifty years while at the same time identifying the bottlenecks inherent in projects execution. Importantly, the conceptual performance efficiency framework derived in the current study presents a paradigm shift in the monitoring and evaluation of projects. To this end, an in-depth analysis is recommended on the interaction of efficiency enablers in the buildup of performance efficiency index (PEI). Similarly, a further inquiry is recommended on the integration and impact of the proposed framework in the management of projects.

The Building Energy Efficient Policy to Tackle Rising High Oil Prices in Korea (고유가시대에 대비한 건축물의 에너지효율화관련 시책 현황)

  • Jeong, Young-Sun;Choi, Gyoung-Seok;Kim, Kyoung-Woo;Kang, Jae-Sik;Lee, Seung-Eon
    • Proceedings of the SAREK Conference
    • /
    • 2006.06a
    • /
    • pp.959-964
    • /
    • 2006
  • Recently, an international oil price shows fluctuation in 70 dollars per barrel and it is said that this trend is able to continues for much longer. Because energy consumption in buildings accounted for about 25% of the nation's total demand for energy, Energy censervation and efficiency of buildings were very important issues. Main political measures relating to building energy use and saving were 'the system of accrediting green building', 'building energy certification system', 'energy consumption efficiency rating indication system', 'building energy code', 'high efficient energy materials certification system'. This paper presents approaches to improve building energy efficiency policy.

  • PDF

An Analysis of the Efficiency and Productivity of Domestic Construction Companies (국내 건설기업의 효율성 및 생산성 분석)

  • Joo, Su-Min;Lee, Suchul;Hong, Jong-Yi
    • Journal of Information Technology Applications and Management
    • /
    • v.27 no.1
    • /
    • pp.1-13
    • /
    • 2020
  • This study aims to measure the efficiency and productivity change of 30 domestic construction companies from 2010 to 2018 using data envelopment analysis(DEA) and Malmquist productivity index (MI). In particular, we used the number of employees, capital stock, and non-current assets as input variables, and sales and net income as ouput variables for the analysis. The dataset used for the analysis of efficiency and productivity changes is the employee profile and financial statements for the companies from 2010 to 2018. We found that the MI of the 30 companies is greater than one since 2013. This is because many years of TEC (Technical Efficiency Change) is greater than 1, which means that the productivity index increases as the TEC increases. In addition, the MI value was less than 1, which lowered the productivity of construction firms in 2018. The results of the study may help decision makers to find effective future management plans by analyzing the internal and external factors.