• 제목/요약/키워드: Construction Duration

검색결과 621건 처리시간 0.025초

A STUDY ON DURATION ESTIMATE METHOD USING STOCHASTIC MODEL IN THE BIM ENVIRONMENT

  • Jae H. Park;Seok H. Yun;Joon H. Paek
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1209-1215
    • /
    • 2009
  • Recently, Construction Projects are being much bigger and more complex. So the importance of Construction Planning and Management is increasing and increasing because of the Construction Projects is involved in a variety of construction-related subjects. Competitive of the Construction Industry decided Cost, Construction Duration and Productivity. But they were just focused on Cost Saving instead of Construction Duration and Productivity. However, they have to finish construction projects using minimum cost and duration with quality and function of required level for successful Construction projects. Thus, current high exchange rate and high period, it is clear to decrease construction cost and to do economic construction in huge Construction Projects and it means more advanced Construction Schedule Management needs for economic construction. But Construction Scheduling Planning, basic of Construction Schedule Management, adjusted contract period without Pre-Planning, just depending on experience and ability of Construction Engineer. Because of that, this study suggests new Duration Estimate Method using Stochastic Model in BIM Environment for advanced Construction Schedule Management. Existing Duration Estimate Methods are just modified wrong points of them or analyzed effective factors of construction schedule. However, New Duration Estimate Method is just consists of Stochastic Model and BIM Environment without existing Duration Estimate Methods. So, new method has creativity and specialty. After this research, it would be a great model in construction industry field.

  • PDF

Framework for Estimating Appropriate Construction Duration of CFRD in the Planning Phase

  • Kim, In Kyum;Kim, Kyong Ju;Yun, Won Gun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.604-605
    • /
    • 2015
  • To secure quality of dam construction needs appropriate construction duration. Tight construction schedule may have negative influence on infrastructure quality, work safety and maintenance cost. It is necessary to reflect proper construction duration in the planning phase. There have been standards for estimating construction duration of building and industrial complex development but dam construction have not. In order to estimate construction duration of CFRD, feasible study reports and design reports were analyzed to acquire available information. After that, considering on construction duration methods such as comparison with similar cases, approximate estimating formula, approximate quantity assumption were adapted to Critical Path items. Hence, this study present framework for construction duration estimating of CFRD in the planning phase. This framework can be applied other types of dam along the same line.

  • PDF

A Study on Optimal Duration Estimation for Construction Activity

  • Cho, Bit Na;Kim, Young Hwan;Kim, Min Seo;Jeong, Tae Woon;Kim, Chang Hak;Kang, Leen Seok
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.612-613
    • /
    • 2015
  • As a construction project is recently becoming large-scaled and complex, construction process plan and management for successful performance of a construction project has become more important. Especially a reasonable estimation plan of activity duration is required because the activity duration is directly related to the determination of the entire project duration and budget. However, the activity duration is used to estimate by the experience of a construction manager and past construction records. Furthermore, the prediction of activity duration is more difficult because there is some uncertainty caused by various influencing factors in a construction project. This study suggests an estimation model of construction activity duration using neural network theory for a more systematic and objective estimation of each activity duration. Because suggested model estimates the activity duration by a reasonable schedule plan, it is expected to reduce the error between planning duration and actual duration in a construction project. And it can be a more systematic estimation method of activity duration comparing to the estimation method by experience of project manager.

  • PDF

COST ANALYSIS OF STRUCTURAL PLAN FOR REDUCING FRAMEWORK CONSTRUCTION DURATION OF REINFORCED CONCRETE RESIDENTIAL BUILDINGS

  • Seon-Woo Joo;Moonseo Park;Hyun-Soo Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.493-498
    • /
    • 2009
  • Recently, the number of complex construction projects, such as high-density development and long-span mega structure construction, has been increasing globally. Therefore, the construction duration has become an even more important factor for success. Nevertheless, in domestic residential construction projects, it usually takes more time than twice as much as North American cases. The long construction duration causes a number of problems, for example growth of financial costs, fall in productivity, and weakness of competitiveness. If the framework construction duration can be shortened to 3 ~ 4 days, then it is also expected to complete the finish work of building in shorter duration, be led to reduce the entire construction duration, and eventually to save a great deal of indirect costs. For shortening the construction duration, previous researches pointed out that the development of simplified plan design should precedes. But, in reality, lack of experience of new design and innovative techniques tends to be the obstacle to wide adoption of the simplified plan design in construction fields. In this paper, a simplified structural plan design is proposed, and the construction cost is quantitatively compared between when traditional construction technique is applied to the traditional plan and when the duration-shortening key technique is applied to the developed plan.

  • PDF

건설사별 공기비교를 통한 공기경쟁력 분석 - 주상복합 및 오피스텔 건물을 중심으로 - (A Competitive Advantage Analysis of Construction Duration through the Comparison of Actual Data of Domestic Construction Firms - Focused on Mix-Use Residential Building and Officetel Building -)

  • 류한국;김선국;이현수
    • 한국건설관리학회논문집
    • /
    • 제7권1호
    • /
    • pp.138-147
    • /
    • 2006
  • 최근에는 주 5일 근무제도, 공기단축형 입찰제도의 도입, 후분양제도의 도입 등의 제도적 변화로 건설공사의 성공적 수행에 중대한 영향을 미치는 공사기간에 대한 관심이 증대되고 있다. 또한 건설시장의 축소와 최저가 입찰제도하에서 건설수주 경쟁은 더욱 치열해짐에 따라 적정 공사기간의 산정과 예측은 매우 중요하다. 이러한 공사기간에 대한 중요성을 인지하고 공사기간을 비교 분석하거나 예측하고자 하는 연구들이 진행되었다. 국내에서 공사기간의 비교연구는 공동주택과 사무소 건축에 국한되었고 국외에서는 통계적 분석과 시뮬레이션을 통한 공사기간의 예측에 대한 연구가 많이 수행된 반면, 건물에 대한 수요의 변화로 발생된 주상복합건물과 오피스텔건물에 대한 공사기간의 실제 사례비교에 대한 연구는 거의 없다. 이에 본 연구는 국내 건설사들의 주상복합 및 오피스텔 건물의 실적공기와 가상사례를 활용하여 공사기간을 비교 분석한 후 공기 경쟁력 확보를 위한 공사단계 별 대응현황을 분석하는 것을 목적으로 한다.

공공건설공사 공사기간 산정모델에 관한 연구 (A Study on Estimation Model of Construction Duration for Public Construction)

  • 김병수;전진구
    • 한국건설관리학회논문집
    • /
    • 제6권6호
    • /
    • pp.142-151
    • /
    • 2005
  • 공공 건설공사에 있어서 발주관청에서 산정한 예정공사기간과 실제 공사기간 사이에 차이가 발생하여 당초 계획했던 프로젝트가 예정준공일보다 지연되는 경우가 빈번하게 발생한다. 이는 공사지연에 따른 시공 중 문제점뿐만 아니라 시설물사용 계획의 차질로 초래되는 물류비용증가, 시민불편가중, 시설물을 이용한 생산 및 공급차질과 이로 인한 각 분야의 막대한 손실 등으로 이어진다. 이러한 손실들을 줄이기 위해서는 발주시 산정하는 예정공사기간의 정확도를 높여야 한다. 본 연구는 발주관청의 예정공사기간 산정시 지표로 활용할 수 있는 공사기간보정요소를 포함하는 예정공사기간 산정모델을 제시하여 적정공사기간을 확보함으로서 시공 중의 공기 연장 빈도를 줄이고 나아가서는 공공 프로젝트의 성공적인 운영에 기여하고자 한다.

BIM기반 추계학적 공기 예측 모듈 프로토 타입 개발에 관한 연구 (A Study on Proto-type Development of BIM based Stochastic Duration Estimation Module)

  • 박재현;윤석현;백준홍
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.159-162
    • /
    • 2009
  • Today's construction is more various and more complex. Because of that, a lot of uncertain factors are occurred and they related uncertain construction duration. For management complex architecture project, importance of construction schedule management also increased. In previous studies, one of solutions to overcome those problems is suggested. It was BIM based construction simulation process which focused on construction schedule and construction schedule management. But latest process had limited point which has no duration estimation function. So this paper suggested duration estimation method and developed duration estimation module. Duration estimation module developed with current scheduling tool MS Project and their macro function. However, this module has just developed Reinforced Concrete Structure and has to do more development and research.

  • PDF

SWOT 분석을 통한 건설기업의 공기경쟁력 강화 전략 (Competitive Advantage Strategy of Construction Duration by SWOT Analysis)

  • 김선국;이현수;류한국
    • 한국건설관리학회논문집
    • /
    • 제7권2호
    • /
    • pp.109-117
    • /
    • 2006
  • 건설산업의 경쟁은 신규 건설시장 축소, 최저가 입찰제도, 주 5일근무제도, 후분양제도의 도입 등에 따라 더욱 심화되고 있다. 이러한 건설환경의 급격한 변화는 산업의 주축을 이루고 있는 건설사들로 하여금 변화에 적응하고 더 나아가 새로운 환경을 선도하기 위한 다각적인 노력을 요구하고 있다. 그러나 건설공사는 공기지연을 유발하는 수많은 불확실성이 존재하고 있으며 이러한 불확실성에 대한 인식과 그에 따른 체계적인 전략수립과 관리가 부진한 경우 건설공사의 공기경쟁력을 확보하는 것은 매우 어렵다. 이에 본 연구는 적정 공사기간의 확보, 공기단축의 필요성, 기존의 공정전략 수립에 대한 연구가 부족함을 인식하고 건설사의 전반적인 전략 수립이 아닌 공기경쟁력 확보 측면에서 연구의 범위를 한정하였다. 본 연구는 건설산업의 대내외적 환경 분석과 SWOT 분석을 통하여 공기경쟁력 확보를 위한 전략을 수립하고 이를 이행하기 위한 선결과제를 도출하는 것을 목적으로 한다.

공기산정 영향요인별 실적공기 비교분석 - 사무소 건축공사 공기산정기준을 중심으로 - (Analysis of Actual Duration by Effecting Elements to Duration Estimate - Focused on Standard Duration of the Office Building Construction -)

  • 황효상;김경래;서상욱;김창덕;신동우
    • 한국건설관리학회논문집
    • /
    • 제3권3호
    • /
    • pp.84-93
    • /
    • 2002
  • 민간건축공사의 분양 및 임대 사업에 소요되는 공사기간의 단축은 발주자 측면의 현금흐름의 관리를 위해 중요하다. 그러나 국내 건설산업에는 기준공기의 개념이 정립되어 있지 않아서 공기산정의 기준을 제시하는 데에 어려움이 있다. 이를 해결하기 위해, 공정관리에 관련된 기존의 문헌조사를 통해 공기산정 시 고려되는 영향요인을 파악하고 설문지 조사와 전문가 면담을 통해 최근 완공된 사무소 건축공사의 실적공기를 조사한 후, 수집된 실적공기를 영향요인별로 분석하여 기준공기를 제시하며, 이를 건설 선진국의 실적공기와 비교 및 분석하여 국내 건축공사에 있어서 공기단축의 필요성을 제기하였다.

국내 건설 업체 공기산정 기준 및 영향요인 연구 -공동주택 중심으로- (A Study on the Estimate Criteria and Influence Factors of Construction Duration of Domestic Firms -Focused on the Apartment Building Firms-)

  • 김선엽;김선국;한충희
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.447-450
    • /
    • 2004
  • 국내 건설업계는 공기보다는 공사비에 초점을 맞추어 왔다. 그러나 근래에 들어 사회적 요구 변화로 인하여 공기에 대한 관심이 증대되고 있다. 적정한 공사기간은 다른 방면으로서의 비용절감과 관리의 효율성을 줄 수 있다. 특히 공동주택과 같은 경우 대부분의 공정이 타 기업과 유사하여 다른 기업의 장점을 쉽게 얻을 수 있으나 현재 대부분의 기업에서는 공기에 대한 연구가 부족한 형편이다. 본 연구는 공기가 타기업에 비해 짧은 기업을 대상으로 대공정 수준의 일반 공기 산정 기준을 검토하고 이에 따른 기업의 공기 우위요인을 연구하여 공기 산정을 위해 검토하여야 할 요소와 이를 통한 공기 단축에 영향을 줄 수 있는 요소를 제시하려 한다.

  • PDF