• Title/Summary/Keyword: Construction Drawing

Search Result 461, Processing Time 0.023 seconds

A Study on the methodology of applying and activating the Construction Drawing Information Exchange Standard(STEP) by CALS/EC (CALS/EC 체계에 따른 건설도면 정보교환 표준(STEP)의 적용 및 활성화 방안에 관한 연구)

  • 김인한;최중식
    • The Journal of Society for e-Business Studies
    • /
    • v.7 no.2
    • /
    • pp.39-53
    • /
    • 2002
  • In the Korean domestic construction field, there are a lot of problems related to construction information exchange and sharing owing to the absence of construction drawing information exchange standard. To remedy the aforementioned inefficiency effectively, it is necessary to apply the STEP standard which is known as an international standard for achieving the establishment of Construction CALS. This study focus on suggesting a methodology to activate the STEP based construction drawing information exchange standard to the current construction drawing information exchanging and sharing practice. In this paper, the domestic and foreign standardization projects related to the construction drawing information have been investigated and analyzed. In addition, a methodology of applying and activating the STEP standard has been suggested. Finally, a verification and certification methodology for applying the CALS/EC construction drawing information exchange standard(STEP) have been suggested.

  • PDF

A Study on the Usage of STEP data on the Construction CALS/EC Environment - Focusing on linking the Drawing Information and Material Information - (건설 CALS/EC 환경에서의 STEP 데이터 활용방안에 관한 연구 - 도면정보와 자재정보 연계 중심으로 -)

  • 서종철;김인한
    • The Journal of Society for e-Business Studies
    • /
    • v.8 no.1
    • /
    • pp.121-139
    • /
    • 2003
  • Currently, it is not popular to use the STEP based product information in the construction drawing files, in spite of the importance and possibility of using various product data in drawing files on the CALS/EC environment. This paper aims to demonstrate a construction drawing information management system based on ISO 10303/STEP. To achieve this aim, the authors have analyzed the current construction drawing information classification hierarchy widely used for domestic and international, and examined the material data connection mechanism within CAD drawing data, and finally investigated the management systems for construction documentations and drawings in a public companies. Therefore, the expected benefit of the proposed system is that STEP drawing information management will be done standardization and the information of STEP construction drawing can be managed, shared and supported design business through materials data connection.

  • PDF

Developing a Drawing Template for BIM software to Improve BIM-based Drawing Work Efficiency in the Construction Document Phase (실시설계단계 BIM 기반 도면 작업 효율 향상을 위한 도면화 템플릿 개발)

  • Kim, Yi-Je;Kim, In-Chie;Chin, Sang-Yoon
    • Journal of KIBIM
    • /
    • v.10 no.4
    • /
    • pp.98-109
    • /
    • 2020
  • Based on the prior research which developed the consistency review checklist of the BIM model and 2D drawing through the drawing analysis of the construction documents phase, the apparent limits of the existing template and the template development items were derived. As well, the BIM-based drawing templates of the construction documentation phase were developed and verified using ArchiCAD BIM software. The developed template was then applied to the actual project model in the construction documents phase, and, as a result, 50% of existing work elements could be utilized as templates. This is an increase of more than 30% over the existing template utilization elements, and it is analyzed to be effective in practical application and utilization. Based on the results of this study, if the BIM model construction criteria matching the drawing's utilization purpose are presented, while at the same time the BIM data interlocking and drawing template development studies are conducted, the utilization of BIM data can be maximized and additional drawing work can be minimized to increase the percentage of template utilization elements. In addition, it is believed that this can employed to address functional and institutional problems of BIM-based drawing and make a contribution to the activation of BIM.

A Case Study On The Suitability Of Drawings Through Application Of BIM In Construction Management (건설사업관리 분야에서 BIM적용을 통한 도서의 적합성 검토 사례)

  • Park, Young-Jin;Song, Kyung-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.33-34
    • /
    • 2017
  • The purpose of this case study is to reduce the flaw and reconstruction occur at the level of construction by determining the propriety of estimate and error on a drawing and specification at working design level through case studies of BIM application at the level of design review. As a preliminary to apply BIM technology, it is needed to review the drawing, and then it is required to define BIM range by selecting the section in which construction error occurs frequently except for the type of part that is constructed repeatedly. At the execution level, the drawing is reviewed vertically, horizontally and spatially by proceeding structure and finish modeling on the defined BIM range, and also the propriety of estimate and error on the drawing and specification are examined. We aim to raise the completion rate, improve quality of construction, reduce the cost for construction and shorten period of construction by preparing for the error on the drawing and specification in advance through this review procedures.

  • PDF

A Study on the Standard of CAD Drawing in the Water Resources Parts to Support Construction CALS/EC (건설CALS/EC 지원을 위한 수자원 분야 전자도면 표준체계에 관한 연구)

  • Kang, Young Mi;Kang, Joon Mook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.4D
    • /
    • pp.553-560
    • /
    • 2008
  • As it was developed to korea standard of the CAD Drawing in Construction CALS/EC for the productivity Improvement in Construction Industry and efficiency rising of construction management. it is high time to design the standard system in water resources. The purpose of this study is to establish the strategies for standard system of drawing information in water Resources parts for construction CALS/EC. This study is to analyse the existing construction drawing standards including CMS, CMMS, drawing guideline of a water Resources public institution, ISO, US National CAD Standard, Japanese Standard. As a result of the analysis, this study proposes the prime structure of the water Resources drawing information standard to support construction CALS/EC. For the establishment of standard system in real practice, this study establishes the numbering system to joint the current standard system for a water Resources order institution and to keep construction CALS/EC. In conclusion, the standard system of drawing information is proposed as a fundamental frame to water Resources parts of construction CALS/EC.

The Research about Increase and Decrease of the Construction Cost by the Alteration of Design (설계변경에 의한 공사비의 증감에 관한 연구)

  • Im Chil-Soon;Lee Gyu-Chel
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.106-113
    • /
    • 2003
  • The purpose of this thesis is to provide an appropriate trade-off information for the conflicting interests caused by the various factors between building owner and contractor during selecting the contractor and performing the construction work, in which the construction was contracted by open bidding from the government or private organizations. In order to propose the legitimate evidence, the differences between the domestic contract sheet of drawing change and the process of drawing change and those of the foreign countries were compared and analysed The number of construction ordered in Youngdong area in 2001 whose construction expenses are more than 100,000,000 won is 218 items and 147,005,000,000 won in total cost Among them, the number of 218 items whose total cost amounts to 16,705,000,000 (11.36$\%$) is in case of increase of construction expenses due to the drawing changes, and the number of 48 items whose tool cost amounts to 2,009,000,000 won (1.37$\%$) is the case of decrease. In conclusions, the contractor could have more benefits than the building owner in case they submit the detailed estimate sheet without eliminating the increasing expenses of construction. It is shown that the building owner's loss is increasing whenever the labor cost is higher material cost Therefore, this thesis proposes a proper standards for the harmonious compromise between the contractor and the building owner for the problems caused by the drawing changes when the contract agreement is occurred.

A Study on the Drawing Representation Methodology of Architectural Plans(建築圖說) in Late chosun Dynasty (조선(朝鮮) 후기(後期) 건축도설(建築圖說)의 표현기법(表現技法)에 관한 연구(硏究) (산릉도감의궤(山陵都監儀軌)를 중심(中心)으로))

  • Shin, Dong-Cheol
    • Journal of architectural history
    • /
    • v.7 no.3 s.16
    • /
    • pp.9-26
    • /
    • 1998
  • Architectural Drawing has been settled down the very effective means of exchanging their architectural ideas and data on the construction process. However, it was not easy to conserve the original drawings, which aims had been accomplished, at the same time, building was built. The same phenomena were occurred in our traditional architectural construction project, especially before pre-modern age. And do not understand soundly building documentation accepted by craftsmen in the period of earliest Chosun dynasty and how to present their idea and information of architectural as means of sketches and drawings. So, this paper aimed to clarify the drawing occurrence and the development steps of their rendering, representation methodology in the construction process in Sannungdogam-Uuigue, which were the construction documents of government based on the royal family's tomb and building projects in the late Chosun Dynasty. There are three development stages of architectural space representation, pre-drawing stage, drawing occurring stage and drawing settlement stage, They had been adapted unique drawing presentation method which were drawn by artisan, so called Doseol(圖說)and Painter Hwawon(畵員) The results are 1. In the Pre-drawing stage, they had been used the systematic explanation method of character 2. Do not have the evidence of adapting drawing before 17th centry, it was originated in early 17's century started with Onga(甕家). Onga's Drawing was drawn very elementary skill, and became development, settlement and standardization of their drawing representation around 19th century 3. The drawing presented by client's recognition view of space and building, integrated data within a sheet of drawing with practical and hierarchy and using graphic and description.

  • PDF

A Study on the Optimization plan for Standardization of Engineering Drawing (설계도면 작성기준 최적화 방안에 관한 연구)

  • Kim, Suk-Su;Song, Jae-ho
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.23 no.1
    • /
    • pp.57-64
    • /
    • 2020
  • The construction market became generally opened to overseas and the domestic construction industry has competed with the international construction enterprise of which technical knowledge is superior. In order to compete with the international construction companies, domestic construction industry needs more continuous promotions on the research and development for improving the level of technique of the construction engineering to meet the international norm. This study aims to suggest the better standards of engineering output such as drawings and specifications to correspond the changing integration system and bidding system in preparation for growing international competition. The study starts with comparison and analyses of domestic and international methods and standards for preparing design drawings. And it continues to delve into actual drawing preparation practices, especially focusing on the ones for road and subway construction. Finally, the study presents a better way of the standardization of the main drawings such as general plan, longitudinal drawing, cross section, structural drawings and temporary structure for new bidding systems of historical cost estimation and whole specification tender and for promotion of international competitiveness.

A Study on the methodology of applying the CALS/EC Construction Drawing Information Exchange Standard(STEP) in Design Fields (CALS/EC 건설도면 정보교환 표준(STEP)의 설계분야 적용 방안에 관한 연구)

  • Kim In-han;Choi Jung-sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.163-168
    • /
    • 2001
  • In the domestic construction field, there are a lot of problems related to construction information exchange and sharing owing to the absence of construction drawing information exchange standard. To solve the problems effectively, it is necessary to apply STEP standard that is international standard and standard technology for achieving the establishment of Construction CALS. This study focus on suggesting a methodology to solve problems which occur to the current construction drawing information exchanging and sharing practice. The domestic and foreign standardization projects related to the construction drawing information have been investigated and analyzed. In result, a methodology of applying the STEP standard has been suggested. In addition, a verification and certification methodology for applying the CALS/EC construction drawing information exchange standard(STEP) have been suggested.

  • PDF

The Modeling of the Element Breakdown Structure(EBS) Applicable to Construction Fields for the Integration of the Construction Information in Apartment (공동주택에서의 건설정보통합을 위한 실무형 부위별 분류체계 구축에 관한 연구)

  • Song Hyuk;Ryu Seong-Ryong;Lee Han-Min;Chung Hwan-Wook;Im Jong-Seong;Go Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.4 s.4
    • /
    • pp.98-105
    • /
    • 2000
  • The drawing information takes the most essential part of construction information. The management of construction information through drawing information facilitates input, output and search process, thus helping maximize the usage of construction information by effectively sharing construction experience and drawing information. This paper shows how construction information can effectively used to increase the productivity of the construction process as a whole. Construction information was extracted and classified by the elements of building which are the basic and very end components of building, to accumulate information of each construction phase. Based on the result, the Element Breakdown Structure(EBS) was developed for the practical usage of construction information integration.

  • PDF