• Title/Summary/Keyword: Construction Dispute

Search Result 173, Processing Time 0.018 seconds

Analysis of Dispute Cases According to the Construction Project Phases -Focused on Cases of the Supreme Court and Korean Commercial Arbitration Board- (건설프로젝트 단계별 분쟁사례 분석에 관한 연구 - 대법원 및 대한 상사 중재원 사례를 중심으로 -)

  • Lee, Yi-Do;Park, Jeong-Ro;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.185-189
    • /
    • 2010
  • As recent construction project has specialization and high-level of the engineering, Although, It has always uncertainty of agreement and contract enforcement, factors of difficult to predict etc. in each phase. In this process, Various interest groups involved are continuously generated dispute of interest each others. So this paper analyzed the dispute cases in construction projects from the Supreme Court and Korean Commercial Arbitration Board in Korea, and then identified the dispute types and causes that occur during all of the construction project phases with their influence analysis. At the result, It will be contributed to the basic data for pre-dispute prevention in the construction projects.

  • PDF

A Study on the Dispute Boards in International Medium and Long-term Transaction - Focus on the Construction Contract - (중장기 국제거래에서 분쟁해결위원회에 관한 고찰 - 건설계약을 중심으로 -)

  • Yu, Byoung Yook
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.57
    • /
    • pp.79-108
    • /
    • 2013
  • International transactions of plant and construction project need to time to time for completing the contract. During the performing the contract there may arise many claims and disputes it should be settled rapidly for processing schedule of works. However, arbitration and litigation for settlement of dispute are inappropriate in time and expense under the specifications of plant and construction project. Dispute boards are one of the successful resolution method of dispute prior to litigation or arbitration. If the dispute board was failed, of course, it may be allowed to continue into litigation or arbitration. As the creative methods of parties agreement, dispute boards may be expected to avoid claims and dispute in long and medium international contract. The purpose of this paper is to explore the specification and limitations of dispute boards that may clear disputes under long and medium contract of construction and procurement. It needs to be understand to determine whether is the useful methods for resolving dispute in the international project. This paper considers the specific natures of dispute board and its rules, procedures and problems including ICC and FIDIC for the contract of long and medium transaction.

  • PDF

MEDIATION MECHANISM FOR CONSTRUCTION DISPUTE RESOLUTION IN TAIWAN

  • Chun-Yi Hwang;Nie-Jia Yau
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.357-363
    • /
    • 2011
  • Mediation has long been praised as one of effective dispute resolution methods in the area of construction law. Article 85-1 of the Taiwan Government Procurement Act was amended and promulgated by presidential decree on July 4, 2007. The second paragraph of the Article elaborates explicitly, "In the event that the application for mediation referred to in the preceding paragraph is made by the supplier, the agency may not object to such application." Beyond that, if an unsuccessful mediation of a construction dispute is due to the agency's disagreeing with the proposal or resolution for mediation proposed by the Complaint Review Board for Government Procurement ("CRBGP"), the agency may not object to the arbitration filed by the supplier. It undoubtedly reinforces the importance of the mediation-arbitration procedure. Accordingly, this paper elaborates on the mediation mechanism in Taiwan in the framework of construction disputes first. After that, dispute resolution of a local public work case is provided to demonstrate the practice of construction mediation in Taiwan. Lastly, this study proposes suggestions on applying mediation to ease similar subsequent cases.

  • PDF

Analysis of Construction Dispute Cases Considering Reward Ratio Focused on Arbitration Cases of Korean Commercial Arbitration Board (보상비율을 고려한 건설사업 분쟁사례 분석 - 대한상사중재원 중재판정사례를 중심으로 -)

  • Ahn, SangHyun;Choi, Heeju;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.4
    • /
    • pp.48-56
    • /
    • 2017
  • Construction Projects have many participants by characteristic, scale and contract. Those also have complicated communication structure. So, claim and dispute occur continuously for conflicting communication. In many claim and dispute cases, it usually occurs between builder and owner. Unfair practices by owners position cause main claim and dispute. This study analyses judgment type, cause and compensation ratio in korean commercial arbitration case and provides the dispute information for builder that has weak position by contract. It draws analysis information for managing and controlling dispute that order type, judgement type, cause and failure case. Using these analysis information, it hopes to help inducement of dispute agreement and save time and economic damage for builder during construction. It also hopes to rise construction completeness by providing dispute management information.

A Study of the New Approaches to the Disputes Resolution Processes in Construction Projects (건설공사 분규해결 절차의 새로운 정립에 관한 고찰)

  • Shin Kyoo-Chul
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.40-45
    • /
    • 2001
  • Arbitration is adopted recently as dispute resolution vehicle for major construction projects in Korea. These arbitration cases show that complex construction disputes are resolved reasonably by newly-introduced arbitration process and this trend will continue. This paper reviews the expanded concept of dispute resolution for the new approaches to the disputes resolution processes in construction projects. The expanded concept includes that disputes need to be assessed reactively and proactively in construction project and need to be managed effectively in advance. In this paper, dispute resolution methods used in Korea are reviewed and analyzed against ADR methods available in US construction industry The new approaches to the dispute resolution Processes are based on the concept of 'Disputability' which means dispute management through prevention, avoidance and predictability of dispute issues and characteristics.

  • PDF

WHAT IS THE VALUE AND IMPACT OF EARLY DISPUTE EVALUATION IN THE UK AND INTERNATIONALLY?

  • Francine Baker
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.350-356
    • /
    • 2011
  • Early neutral evaluation (ENE) is a fairly recent form of alternative dispute resolution procedure used in the construction industry. In the UK, ENE is usually carried out on an entirely without prejudice basis, however the parties may agree that any or part of it may be referred to at trial or any subsequent hearing. The early neutral evaluation consists of a preliminary assessment of the issues in dispute for use as a basis for negotiations which may result in a settlement of the dispute. An independent person is appointed by the parties who reviews the case and provides an opinion, in written form and in some detail, with reasons on the merits of the matters in dispute. The opinion is non-binding but provides the parties with what in the opinion of the independent person a formal tribunal may decide whether a court or an arbitrator, if the dispute is not resolved. However, ENE has yet to take off in the construction industry in the UK. This paper will explain this procedure and explore the use of it in the UK and internationally, considering the benefits and drawbacks of its use. It will consider whether or not it is more effective than other early resolution forms such as mediation and adjudication. It will argue and conclude that it is a very useful cost effective procedure, particularly in the resolution of complex disputes, whether local or international.

  • PDF

Proposal of Improvement Devices for Construction Dispute Resolution System in Public Works (공공건설공사의 분쟁해결조항 개선방안 연구)

  • Lee Ji-Yeon;Shin Kyoo-Chul;Lee Jae-Seob
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.437-441
    • /
    • 2004
  • This study aims to propose a set of improvement devices for construction dispute resolution clause of public improvement project in Korea. To do so, the study addresses the system and procedure of construction dispute resolution in domestic and overseas, and reviews precedent cases, specifically focused of a selective arbitration case. In public sector's initiated contracts, the absence of c)aim procedure clause is unable to response to the claims in timely manner, and the ambiguity of clause o( selective arbitration make it difficult to resolve a dispute by arbitration. Thus, in this study alternative dispute resolutions are explored as a way to resolve various construction disputes of public-initiated project in developed countries.

  • PDF

Commercial Arbitration and Dispute Management in Construction Project (건설공사의 분쟁관리와 상사중재)

  • 이태식;이동욱;김영현
    • Journal of Arbitration Studies
    • /
    • v.13 no.2
    • /
    • pp.489-517
    • /
    • 2004
  • The resolution of the 1993 Uruguay Round and the opening of Korea's construction market in '97 marked the beginning of the globalization of Korea's domestic construction market. Consequently, the process led to changes in contracting procedures, as well as disputes in construction management. With globalization came a rapid realization of reasonable values, which forced the hierarchical vertical relationship between the owners, constructors, and subcontractors into a more equal, horizontal relationship. Once the hierarchical relationship was altered, the late 1990's witnessed a dramatic increase in managerial disagreements, in addition to escalating legal disputes and expenditures. The horizontal relationship was a new concept and brought forth many complexities. Unfortunately, because all of this was new, management of construction disputes was elementary at best. Anticipation of disputes is the key to effective dispute management. This includes thorough reviews of contract documents, document management, construction records, and checklists. Also necessary is the education of owners and contractors with pertinent knowledge concerning dispute management. The following paper focuses on the importance of observing construction disputes in order to facilitate management thereof.

  • PDF

Critical Factors Affecting No-dispute Performance: A Case of Ethiopian Public Construction Projects

  • Sinesilassie, Ephrem Girma;Tabish, Syed Zafar Shahid;Jha, Kumar Neeraj
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.4
    • /
    • pp.24-34
    • /
    • 2016
  • Disputes seem to be synonymous with large-scale construction projects in Ethiopia. The purpose of this study is to determine the factors responsible for impacting the performance of Ethiopian public construction projects. To this end, 35 success and failure attributes responsible for impacting the performance of the projects were identified and presented to Ethiopian construction professionals in the form of a structured questionnaire, and responses were collected. The factor analysis conducted on the success and failure attributes influencing no-dispute performance separately resulted in six success factors and five failure factors. Further analysis using stepwise multiple regression indicates that owner competence and interaction among project participants have a positive impact on no-dispute performance. However, conflict among project participants has a negative impact on the no-dispute performance of Ethiopian public construction projects. Although Ethiopia-specific, the results reflect construction management problems common to both developed and developing countries. The findings are expected to help researchers and practitioners gain a better understanding of critical success and failure factors and to help them take proactive measures to avoid disputes in public construction projects.

A Study of Abstracting Dispute Factor to Prevent Dispute in Early Stage for Construction Project - Focusing on Turn-Key Project - (프로젝트 초기 단계에서의 분쟁방지를 위한 분쟁요인 추출에 관한 연구 - 턴키공사 사례 중심으로 -)

  • Yoon Jun-Seon;Kwon Gi-Beom;Seo Choon-Taek;Paek Joon-Hong
    • Journal of Arbitration Studies
    • /
    • v.14 no.1
    • /
    • pp.315-344
    • /
    • 2004
  • Although we try to increase the order of turn key construction for the international competitiveness strengthening, the construction quality advancement and the productivity enhancement of the public sectors, the problems of the domestic turn key systems are causing the hardships of all the participants and many possible disputes. The home turn key constructions have been activated since 1997. A lot of trial and error had been experienced in these days, and the turn key systems have been changed little by little. But the bases are continuously kept because of their reflecting all the participants' opinions. In the inner turn key constructions the problems of uniform types are repeatedly occurred, and, especially, many problems happen up to the stage of early stage owing to the specialties of the turn key construction. So the dispute factors of the Korean turn key constructions were abstracted through the literature searches, the site document examinations, the case studies and the interviews with the experts. When the technicians meeting the interior turn key construction for the first time and working here now are well acquainted with only these factors, many disputes will be prevented.

  • PDF