• Title/Summary/Keyword: Construction Design

Search Result 11,630, Processing Time 0.08 seconds

CHECKLIST FOR ENVIRONMENTAL FRIENDLY CONSTRUCTION MANAGEMENT IN DESIGN PHASE

  • In-Su Jung;Hyun-Su Park;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.376-385
    • /
    • 2007
  • Construction project is necessary element for human life to upgrade the quality and convenience. However, due to its contradictory nature to the environment preservation, environmental pollution and damage, deterioration of natural scenery, noise/vibration, water quality pollution, etc. caused in the process of construction greatly affect the environment. For the building or construction project, its possible impact on environment during construction work and after completion must be predicted at its design phase, which will result in the completion of the architecture convenient for human being with its environmental pollution reduced to minimum level. In this study, the checklist of environmental factors was suggested, which should be taken into account at its design phase in conducting the construction work. Proposed checklist was linked with the developed web-based system for the convenience of users like designer and construction manager, etc. It is expected that the checklist suggested by this study will help the designer and construction manager to continue the steady development from the environmental viewpoint during the design phase.

  • PDF

An Adaptive and Real-Time System for the Analysis and Design of Underground Constructions

  • Gutierrez, Marte
    • Geotechnical Engineering
    • /
    • v.26 no.9
    • /
    • pp.33-47
    • /
    • 2010
  • Underground constructions continue to provide challenges to Geotechnical Engineers yet they pose the best opportunities for development and deployment of advance technologies for analysis, design and construction. The reason for this is that, by virtue of the nature of underground constructions, more data and information on ground characteristics and response become available as the construction progresses. However, due to several barriers, these data and information are rarely, if ever, utilized to modify and improve project design and construction during the construction stage. To enable the use of evolving realtime data and information, and adaptively modify and improve design and construction, the paper presents an analysis and design system, called AMADEUS, for underground projects. AMADEUS stands for Adaptive, real-time and geologic Mapping, Analysis and Design of Underground Space. AMADEUS relies on recent advances in IT (Information Technology), particularly in digital imaging, data management, visualization and computation to significantly improve analysis, design and construction of underground projects. Using IT and remote sensors, real-time data on geology and excavation response are gathered during the construction using non-intrusive techniques which do not require expensive and time-consuming monitoring. The real-time data are then used to update geological and geomechanical models of the excavation, and to determine the optimal, construction sequences and stages, and structural support. Virtual environment (VE) systems are employed to allow virtual walk-throughs inside an excavation, observe geologic conditions, perform virtual construction operations, and investigate stability of the excavation via computer simulation to steer the next stages of construction.

  • PDF

A Construction Safety Management Information Model using the Concept of Design for Safety (Design for Safety 개념을 활용한 건설안전관리정보모형)

  • Hong Sung-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.109-116
    • /
    • 2004
  • The DfS(Design for Safety) concept is expected to be widely used to promote pro-active construction safety management. It will open up tremendous opportunities for tile owner, designer, and constructor to prevent accidents in construction projects. Construction safety management using the DfS concept is regarded as the most difficult job for the owner, designer and contractor to undertake, because an information model using the DfS concept is not utilized as a tool to support pro-active construction safety management. Therefore, there has been a growing need toward an information model during the design process ai recent practice of construction safety management have emphasized the significance of the pre-construction phase of projects. The objective of this study is to develop the construction safety information model being composed of conceptual, logical, and computerized information models as the tool that helps owner, designer and contractor find out and communicate as well as understand the hazardous nature of the construction projects during the design process.

  • PDF

A Study on the transition of Construction Equipment -Focused on the Excavator- (건설중장비 디자인의 변천과정에 관한 연구 -굴삭기를 중심으로-)

  • 도경찬
    • Archives of design research
    • /
    • v.16 no.4
    • /
    • pp.277-288
    • /
    • 2003
  • By the needs for design, the leading construction equipment manufacturers have performed the product design newly setting up the design teams of late, but the actual level of designing is just as much as copying without systematic process, Therefore the various studies are needed to set up the differentiated design method targeted only for construction equipment and solving the current problems. In this paper, 1 am going to suggest a basic material as well as a cornerstone predicting future design trend in the construction equipment design field through the study of design transition.

  • PDF

The Deduction of the Success Factor in Construction Projects by Design Build Methods (디자인 빌드(Design Build) 방식 건설 프로젝트의 성공요인 분석에 관한 연구 - 중.소규모 건설 프로젝트를 중심으로)

  • Lee, Chi-Joo;Kim, Sang-Ki;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.182-190
    • /
    • 2007
  • The minor construction companies in Korea have grown in focusing on the construction operation field. Also, soft field is vulnerable area, and there are not enough delivery systems, therefore, a capacity of the construction industry expansion and productivity is insufficient. Furthermore, the minor construction companies are losing their areas, because the major construction companies having numerous know-how and ample funds are competitive. As the construction industry are more larger and complicated, the design build methods might be increased in the construction industry and the minor construction companies could have more competitive. Hence, this paper analyzes the success factor in minor construction projects by design build methods focusing on instance $company^{\circ}{\phi}s$ case and survey, and critical success factor deduction and importance degree analysis of this factor using AHP analysis. In addition, this paper gives fundamental data how to manage the construction project effectively for minor construction $companies^{\circ}{\phi}s$ expansion in near future.

Reductions in the Cost and Risk of Interior Construction Using 3D CG Design (3차원 CG설계를 이용한 실내건축공사의 원가 및 리스크 절감)

  • Lee, Jun-Seob;Bang, Hong-Soon;Kim, Ok-Kyue
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.285-286
    • /
    • 2021
  • These days, interior construction is performed to prevent the deterioration of old building finishings or to make distinctive designs. In case of interior construction, a construction cost is estimated through basic 2D drawings in the design step. Accordingly, an efficient construction plan and direction is established according to budget. In such a case, construction is dependent on 2D drawings. At that time, a risk can occur easily. This study is aimed at reducing the cost and risk of interior construction by implementing 3D drawings with the use of the visual data of 2D drawings. For accurate analysis, 2D drawings were completed, and then 3D interior construction modeling for various buildings was conducted with the 3D modeling software 3D Max. According to the 3D modeling, it reduced the cost and risk more than 2D drawings based design, and influenced the improvement in the understanding of orderers and workers.

  • PDF

Design management's development direction through design process improvement (설계업무 프로세스 개선을 통한 설계관리의 발전 방향)

  • Kim, Han;Kim, Seon-Gyoo;Lee, Nak-Woon
    • Journal of Industrial Technology
    • /
    • v.27 no.B
    • /
    • pp.169-176
    • /
    • 2007
  • Recently, construction industry has been magnified while various cooperative relationship makes steady process. So importance of management during construction is gathering strength. Therefore, we need systematic management gradually. But almost management of construction industry that performs these day is focused on construction phase not design phase. The purpose of the present study is to find the effective way of design management with enhancing the process of design phase.

  • PDF

Quality Management for Utilizing BIM in Construction Phase (시공단계에서의 BIM 활용성 증대를 위한 품질관리 방안)

  • Kwon, Ocheol;Cho, Joowon;Jo, Chanwon
    • Korean Journal of Computational Design and Engineering
    • /
    • v.18 no.5
    • /
    • pp.338-347
    • /
    • 2013
  • Since it is common that design BIM data created by designers and engineers do not afford to consider constructability for the site, it is usually necessary to optimize the design BIM data to construction BIM data. While this optimization process requires various design updates depending on the construction methods and requirements, most designers in the projects do not participate the construction phase, which can arise another obstacle factor in utilizing construction BIM. In order to prevent this issue, we need cooperation system, where all the parties work together from the initial stage of project to create quality assured BIM model. However this kind of system is not realistic in Korea with most of the working processes being conventional yet. Therefore, at this point of time, it is realistic for us to secure basic construction qualities in the design phase and keep those qualities by the construction phase. This study suggested a relevant quality management plan for BIM usage in construction phase.

Development of Optimum Design Factor for Automated Steel Fabrication Construction System (철골조립자동화시스템의 설계최적화를 위한 요구성능도출에 관한 연구)

  • Lee, Myung-Do;Kim, Dae-Won;Lee, Bo-Hyeong;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.235-239
    • /
    • 2009
  • As robotic technologies have become more actively utilized to automate many construction tasks, they have been able to improve the construction productivity, quality, and worker's safety on site. A new advanced system, Robot-based Construction Automation (RCA) system, is currently being developed. To accomplish RCA system effectively, Design for automation (DFA) should be performed in automation system developing phase. The performance criteria of this system are a major cause of design changes. It is required exhaustive review for development new system. This research analyzed the design changes of Climbing Hydraulic Robot system and Construction Factory (CF), being currently developed in the field of applied RCA systems. And the design change matters according to performance criteria in each system's design-by-step were analyzed. The purpose of this research is developing the performance criteria in the developing phase of RCA system, and then will be served as basis for system design in similar projects.

  • PDF

The study on the system reliability and code conversion for the probability based design (확률 기반 설계법을 위한 코드 변환과 시스템 신뢰도에 대한 고찰)

  • Kim, Gwang-Chul
    • Journal of the Korea Furniture Society
    • /
    • v.20 no.5
    • /
    • pp.440-456
    • /
    • 2009
  • Because PBD was started as a design tool for steel construction and concrete construction, it was able to applied to the post and beam method of wooden building constructions. But, it may not suitable to light frame wooden construction that is becoming popular in domestic construction market due to the economical efficiency and the constructive simplification. Owing to the share effects between member and sheathing material or among structural members, light frame wooden construction is different from post and beam construction that use a single structural member. Therefore, consideration on the system analysis and system design are urgently needed to use in actual life and inspect the reliability of structures from the system view. With this in mind, code conversion from ASD to PBD that is pressing issue in domestic wooden building construction was studied, also various countries status about PBD were considered and then approaching methods on the system reliability were referred. Finally, several considerations for the development of PBD were explored. PBD should be considered as, not only a new structural design process that select sizes of structural member, but a industrial tool that can lead a development of more reliable wood products. A strongest point of PBD is independent of various construction materials and construction types.

  • PDF