Stakeholders' Perception of the Causes and Effects of Construction Delays on Project Delivery

  • Akinsiku, Olusegun Emmanuel;Akinsulire, Akintunde
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.4
    • /
    • pp.25-31
    • /
    • 2012
  • The growing rate of delays is adversely affecting the timely delivery of construction projects. This study therefore assesses construction stakeholders' perception of the causes of delays and its effects on project delivery in a bid to proffer solution in minimizing the occurrences of delays. Questionnaire was used to elicit responses from construction stakeholders; a total of thirty three causes of delays, seventeen resultant effects of delays and fifteen methods of minimizing construction delays were identified for the study based on literature reviews. The results suggest that client's cash flow related problems are the main causes of delays while time and cost overruns are the major identifiable effects of delays in construction projects. However, adequate project planning and budgeting were suggested as possible ways of minimizing the occurrences of delays.

Delays and its Analysis: Indian Residential Construction Projects

  • Metha, Rakesh L.;Gaikwad, Suraj V.
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.4
    • /
    • pp.20-28
    • /
    • 2017
  • In almost every construction project, delay is an inevitable yet controllable phenomenon. The Indian construction industry encounters an enormous amount of delays in projects. Delay affects both time and money in the forms of schedule and cost overruns, respectively. Due to impressive and dynamic growth in the Indian construction sector, planned efforts are essential to limit these undesirable delays. On account of the surge in the rate of residential building construction, the task of identification and analysis of the delays in residential projects in India has been attempted by the authors. A questionnaire survey was conducted involving 100 stakeholders. Further analysis included an Importance Index to rank the identified delays, Principle Component Analysis for advanced statistical analysis, and Correlation Analysis to check the extent of agreement amongst stakeholders. Conclusions drawn with reference to the analysed data eventually reflected finance-related issues, as well as labour related problems as the dominating causes of delays. The aim of the research is to provide insight to the construction stakeholders and researchers, on an international scale, with the obtained results.

Causes of Schedule Delays in Building Construction Projects in Vanuatu

  • Kim, Dae Young;Chi, Seokho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.6
    • /
    • pp.641-651
    • /
    • 2015
  • With its recent tourism boom, Vanuatu, a small country in the South Pacific, is experiencing an increasing demand for construction. However, it has been struggling with persistent schedule delays in their construction projects due to a variety of reasons. In an attempt to respond to this situation, this paper aims to identify the major causes of schedule delays in building construction in Pacific island countries, with a focus on Vanuatu. To collect data on the factors affecting schedule delays, face-to-face interviews were conducted. Based on these, seven major causes of schedule delays, as selected by the majority of the participants, were identified and discussed to provide perceptive insights for future improvement opportunities. This paper attempts to help contractors with limited resources better understand the major causes of schedule delay in Vanuatu and achieve better performance in building projects.

Stakeholders' Perception of the Causes and Effect of Construction Delays on Project Delivery-A Review

  • Gandhak, Prajyot;Sabihuddin, Syed
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.4
    • /
    • pp.41-46
    • /
    • 2014
  • Indian Construction industry is large, volatile, and requires tremendous capital outlays. Typically, the work offers low rates of return in relation to the amount of risk involved. A unique element of risk in the industry is the manner in which disputes and claims are woven through the fibre of the construction process. Delay is generally acknowledged as the most common, costly, complex and risky problem encountered in construction projects. Because of the overriding importance of time for both the Owner and the Contractor, it is the source of frequent disputes and claims leading to lawsuits. The growing rate of delays is adversely affecting the timely delivery of construction projects. Presently construction industries are facing a lot of problems, considering that a paper assess construction stakeholder's perception to the causes of delays and its effects on project delivery. And also one case study is considered in this paper to elicit responses from construction stakeholders. The primary aim of this paper is to identify the perceptions of the different parties regarding causes of delays, the allocation of responsibilities and the types of delays, and method of minimizing the construction delays.

Factors Affecting Timely Completion of Construction Projects in Nepal

  • Acharya NirmalKumar;Lee Young-Dai;Kim Soo-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.254-257
    • /
    • 2003
  • It is common to experience delays during construction projects. Delays can ca use substantial damages to an owner as well as contractors and is the sources of frequent disputes and claims. Many studies have been carried out to assess the causes of delays in construction projects. They are found to be almost similar, except some prevailed local condition. Most of the common construction delay factors are attributed to design faults, incompetent contractor, lack of team accountability etc. To minimize or eliminate the delay we have to follow the recognized fundamental principles of management such as: cost-time relationship, time priority, accountability, rewards, innovative thinking etc. The root causes of delays found out in this paper are not so much different than other previous study. If the implementing agencies properly followed the, fundamental management principles and some other related corrections as recommended in the paper, much construction delays can be avoided.

  • PDF

Delay Analysis Method Considering Productivity (생산성을 고려한 공기지연 분석방법)

  • Koo Ja-Min;Lee Jae-Seob
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.438-441
    • /
    • 2003
  • Construction delays are a common occurrence of most construction projects and difficult to analyze. there are some techniques to analyze delays, such as using CPM, Bar Chart but they are not enough to analyze concurrent and productivity lost delays. Productivity lost delays are different to interruption delays in computing the number of delays and analyzing concurrent delay. This paper describes the delay analysis method considering productivity including concurrent delay analysis.

  • PDF

Construction Delays in Developing Countries: A Review

  • Islam, Muhammad Saiful;Trigunarsyah, Bambang
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.1
    • /
    • pp.1-12
    • /
    • 2017
  • Construction delay is one of the basic constrains to achieve the project objectives in developing countries. This study aims to find the causes and effects of construction delays in developing countries. A thorough literature review has been done following the content analysis method. The relevant literature of 28 developing countries was collected from the scholarly journals published in the period of 2006 to 2016. The different developing countries are grouped into three geographic regions, i.e. South and Southeast Asia, Middle East, and Africa. In these regions, total 53 potential causes of delay under 8 major groups are identified. Frequency and ranking of these factors have been done. The factors, delay in progress payment by owner, contractors' cash flow problem, improper planning and scheduling, poor site management, and change order by owner during construction, are acknowledged as critical causes of delay in developing countries. This study will assist both academic and professional experts providing more insight about the construction delays and project management in developing countries.

Risk Factors Influencing the Delays on the Remodeling Construction Works - Focused on Office Building Projects - (리모델링 공사의 공기지연을 야기하는 리스크 요인 - 오피스 건축물을 중심으로 -)

  • Cho, Kyu-Man;Kim, Tae-Hoo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.4
    • /
    • pp.385-394
    • /
    • 2018
  • There have been frequent reports of schedule delays due to various risks of remodeling projects, which are different from new construction. Therefore, this study was carried out to analyze the risk factors inherent in the remodeling project and the likelihood of schedule delay occurrence in the remodeling construction work. To analyze the relationship between the risk factors and the likelihood of schedule delays of remodeling projects, (1) a prototype of the office building remodeling work was developed through the analysis of existing case and literature, (2) a questionnaire survey was conducted on 29 construction managers who have been or are currently conducting remodeling projects, and (3) after evaluating the reliability of the collected questionnaire results, the relationship between the two elements, which denotes (i) likelihood of schedule delays per each work, (ii) importance of risk factors, and (iii) risk factors affecting schedule delay in remodeling work, was suggested. Using the results of this study, it is expected to develop a plan for preventing the schedule delay of the office building remodeling work through control the risk factors that may cause schedule delays.

What is a Critical Factor for Determining the Issue-Resolving Time in the BIM-based Coordination Process?

  • Jang, Sejun;Lee, Dongmin;Lee, Ghang
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.392-395
    • /
    • 2015
  • This study analyzes critical factors that affect issues of resolving time in BIM-based coordination using a case study. According to recent buildings that are meant to be more complex, BIM-based design coordination is regarded as an essential stage of the project delivery process. In the design coordination phase, a relocation of architectural, structural, mechanical, and electrical elements is conducted to avoid interference. In addition, the procedure of the development of each element in detail for the actual construction is carried out. Delays in coordination can affect delays in the entire delivery schedule of the project, and therefore many researches have focused on efficient coordination methods and how to shorten the period. In this study, we conducted a detailed analysis of the issue-resolving process using a case study, and found out that the participation of decision-makers for issue-resolving and the physical combination of trades affect delays in coordination time. In particular, we proposed the concept of organizational relation, indicating the level of decision-makers for issue-resolving, and the concept of physical relation, indicating the physical complexity of the issue, and we analyzed the effects of coordination delays.

  • PDF

Real-time Construction Progress Monitoring Framework leveraging Semantic SLAM

  • Wei Yi HSU;Aritra PAL;Jacob J. LIN;Shang-Hsien HSIEH
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.1073-1080
    • /
    • 2024
  • The imperative for real-time automatic construction progress monitoring (ACPM) to avert project delays is widely acknowledged in construction project management. Current ACPM methodologies, however, face a challenge as they rely on collecting data from construction sites and processing it offline for progress analysis. This delayed approach poses a risk of late identification of critical construction issues, potentially leading to rework and subsequent project delays. This research introduces a real-time construction progress monitoring framework that integrates cutting-edge semantic Simultaneous Localization and Mapping (SLAM) techniques. The innovation lies in the framework's ability to promptly identify structural components during site inspections conducted through a robotic system. Incorporating deep learning models, specifically those employing semantic segmentation, enables the system to swiftly acquire and process real-time data, identifying specific structural components and their respective locations. Furthermore, by seamlessly integrating with Building Information Modeling (BIM), the system can effectively evaluate and compare the progress status of each structural component. This holistic approach offers an efficient and practical real-time progress monitoring solution for construction projects, ensuring timely issue identification and mitigating the risk of project delays.