• 제목/요약/키워드: Construction Defects

검색결과 445건 처리시간 0.025초

교량 상부구조 형식에 따른 보수공법 비용 비교분석 (Comparative Cost Analysis of Repair Method according to Bridge Superstructure Type)

  • 이창준;박태일
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.277-278
    • /
    • 2023
  • The need for maintenance of bridge infrastructure is increasing due to aging, and the cost of maintaining the infrastructure must be calculated for effective budget distribution. Therefore, in this study, representative defects according to bridge superstructure type are derived to calculate the cost for each repair method. First of all, the representative bridges, PSCI girder bridge, Rahmen bridge, Steel box girder bridge, and RC slab bridge, were selected as superstructures using BMS data, and repair methods for defects were presented. In addition, the cost of the repair method by superstructure type was compared. This result is expected to predict total maintenance costs in consideration of the maintenance cycle.

  • PDF

이미지 기반 콘크리트 균열 탐지 검출 모델에 관한 연구 (Study on the Image-Based Concrete Detection Model)

  • 김기웅;유무영
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.97-98
    • /
    • 2023
  • Recently, the use of digital technology in architectural technology is gradually increasing with the development of various industrial technologies. There are artificial intelligence and drones in the field of architecture, and among them, deep learning technology has been introduced to conduct research in areas such as precise inspection of buildings, and it is expressed in a highly reliable way. When a building is deteriorated, various defects such as cracks in the surface and subsidence of the structure may occur. Since these cracks can represent serious structural damage in the future, the detection of cracks was conducted using artificial intelligence that can detect and identify surface defects by detecting cracks and aging of buildings.

  • PDF

3.5 wt.% NaCl로 오염된 콘크리트 기공 용액에서 아크 용사 Al 및 Al/에폭시 이중 금속 고분자 코팅의 내식성 성능 (Corrosion resistance performance of arc thermal sprayed Al and Al/epoxy dual metal polymeric coating in 3.5 wt.% NaCl-contaminated concrete pore solution)

  • 지텐드라 쿠마 싱;이한승
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.119-120
    • /
    • 2023
  • Corrosion of the steel rebar in coastal environment caused huge economical loss of the globe. Therefore, coating on the steel rebar being used to mitigate the corrosion. In the present study, we have applied epoxy coating on arc thermal sprayed Al coating (a dual metal/polymeric coating) vis-à-vis compared with as coated one (Al coating). The corrosion studies were performed in simulated concrete pore solution with 3.5 wt. % NaCl solution. The morphology of the dual epoxy/Al coating is smooth while Al coating shows rankle and defects. Due to defects, Al coating is susceptible to corrosion while dual epoxy/Al coating has performed excellent compared to as coated one at extended period of immersion.

  • PDF

암센터 의료시설의 설계변경과 하자보수의 감소를 위한 중점 관리공사 분석 (A Priority and Impact Factor Analysis of Construction Management Tasks for Decreasing Change Orders and Defect Repairs in Cancer Treatment Center Projects)

  • 이치주;이강;심재광
    • 한국건설관리학회논문집
    • /
    • 제14권5호
    • /
    • pp.55-64
    • /
    • 2013
  • 의료시설은 일반건축물 보다 공사의 복잡성이 높고, 정부규제가 엄격하여 공사 단계에서의 설계변경과 하자보수들이 많이 발생한다. 본 연구에서는 의료시설의 중점 관리공사와 요인들을 도출하고 분석하여, 설계단계와 공사단계에서 관리가 잘 되지 않는 공사들을 분석하였다. 그리고 2013년 현재 진행되고 있는 의료시설 공사 관리자들의 인식을 조사하여, 개선 가능성이 큰 공사를 도출하였다. 먼저, 중점 관리요인들을 건축과 설비, 그리고 전기의 세 분야로 분류하여 도출하였다. 다음으로, 1) 공사 진행단계에서 설계변경이 많이 발생하고, 2) 하자보수들이 많이 발생하고 소요비용이 큰 중점 관리공사와 요인들을 분석하였다. 마지막으로, 진행 중인 의료시설 공사 관리자들이 중요하게 생각하지 않는 공사를 조사하였다. 설계변경과 하자보수가 많지만, 중요하게 생각하고 있지 않다면 개선 가능성이 클 것이기 때문이다. 설계단계에서는 마감공사, 벽체공사, 창호공사, 사무 자동화 및 통신기능 공사, 조명공사, 그리고 공사 관리단계에서는 폐기물 공사, 사무자동화 통신기능, 창호공사, 오염관리, 배관공사로 분석되었다. 본 연구의 결과인 설계변경과 하자보수가 많은 공사, 그리고 개선 가능성이 큰 공사의 관리를 실시 설계단계와 공사 관리단계에서부터 집중 관리하여야 할 것이다.

공동주거단지 조경식재공사의 하자실태와 개선방안 연구 (A Study on the Status of Defect of Landscape Trees Its Improvement Plan at the Apartment Complex)

  • 김양희;권영휴
    • 현장농수산연구지
    • /
    • 제10권1호
    • /
    • pp.101-111
    • /
    • 2008
  • As the quality of life improves, people want to live in more pleasant environment with beautiful trees, clean air and water. They are keenly interested in environmental issues as well as living environment of apartment which is a trademark of modern life. With this situation, the function and roles of landscaping trees have been recognized as a critical factor to improve living environment. As people have asked for more demands on those trees, it has raised more issues on the defect of trees and is required the solution to those issues. So, the purpose of this study was to survey the reasons of defects and find out those solutions. The data on defects in 1990s was referenced to the reports issued by SH Corporation in 1994 and 1997. The data on defects in 2000s are collected from March, 2006 to May 2006 based on the survey for apartments already constructed by Korea Housing Corporation. The results of the survey were shown that, in the year of 1994, landscaping trees causing high rate of defects were Acer buergerianum (92%), Pinus densiflora(85.7%), Celtis sinensis(80%), Cydonia sinensis(75%) and Diospyros kaki(66.6%), and in the year of 1997, landscaping trees causing high rate of defect were Ziziphus jujuba(100%), Cornus alba(65.2%), Diospyros kaki(60%), Thuja occidentalis(60%), and Metasequoia glyptostroboides(42%). And, in the year of 2006, landscaping trees causing high rate of defect were Sophora japonica(100%), Taxus cuspidata(80%), Magnoila quinquepeta (75%), Acer palmatum(62.5%) and Ginkgo biloba(50%). Because the reasons of defects were various according to the conditions including the climate, location, time and landscaping trees carried into the work area, we present the problems and solutions to those defects. Since the landscaping trees are living creatures, the factors of defects were various and complicated according to the site condition. So, in the period of warranty, contractor should designate the tree manger who can recognize the situation and take suitable action within timely manner.

균열대응성을 보유한 유·무기 복합 하이브리드 바닥 접착시스템 연구 (A Study on the Hybrid Floor Adhesive System with Crack Resistance)

  • 고효진;김래환;김용로
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.171-172
    • /
    • 2023
  • In order to reduce crack defects caused by the behavior of concrete during floor tile construction, this paper introduced a hybrid floor adhesion system that first constructs an organic adhesive with crack correspondence and attaches tiles with inorganic mortar.

  • PDF

A Basic Study on the Introduction of Professional Indemnity Insurance for Construction Project Managers

  • Cho, Young-Jun
    • 한국건축시공학회지
    • /
    • 제13권2호
    • /
    • pp.102-111
    • /
    • 2013
  • During the administration of a construction project, various types of participants are engaged in the project. From the design phase to the maintenance phase, these participants may confront many risks. To avoid these risks, participants should utilize an insurance company or a bond company. The types of risks and liability that a construction manager may face are listed in the construction law or contract. But there are some arguments related to risk transferring and the content of risks. For this reason, construction managers must carefully consider any possible risks in the contract and the construction law. Therefore, for construction managers to deal with risks appropriately, the introduction of a legal requirement to carry professional liability insurance, a defined compensation range for damages, a method of guarantee in the event of defects, a defined compensation claim period for damage, and a method of damage claim were suggested in this study.

INTERNATIONAL COMPARATIVE STUDY ON "KOUJI-KANRI (CONSTRUCTION SUPERVISION)" AS CONSTRUCTION CONFORMATION

  • Takashi Saito;Shuzo Furusaka;Takashi Kaneta
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.452-458
    • /
    • 2005
  • The Japanese construction industry has faced on lack of quality that is one of the strong confidence fields. It is said that the main reason of this trend is in the case of construction supervisor's defects. But real problems are both the degree of drawing's completion and design activities in construction phase by architect. The purpose of this paper examines that the role of construction supervisor in Japan is changing to the management field and construction conformation, based on the analysis of the WBS based on international comparison among Korea, China, the UK, the US, and Japan.

  • PDF

건설감리 검측데이터 분석을 통한 공사 진행도별 중점관리공종 도출 (A Study on the Derivation of Key Management Works by Construction Progress through the Analysis of Construction Supervision Data)

  • 유나영;김하늘;김하림;조훈희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 가을 학술논문 발표대회
    • /
    • pp.131-132
    • /
    • 2022
  • The type and proportion of construction work varies depending on the stage of progress, and the frequency of inspection and defect occurrences are different. If it is determined to be defective after the inspection, a delay may occur, and additional manpower and resources are required. Therefore, it is necessary to prevent these risks by classifying, deriving, and managing key management woks according to the progress. This study aims to contribute to the efficiency of the supervisor's inspection work by identifying the types of construction that should be managed intensively for each construction progress and deriving the time when defects occur frequently in each construction type.

  • PDF

Optimal Implementation Strategies of Building Information Modeling for Construction Projects of LH

  • Lee, Ji-Eun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.60-62
    • /
    • 2015
  • The BIM-based architectural design can be the optimal method to improve all sectors of construction industry and reduce environmental impact through digital technologies. The goals and effects of BIM needs in LH to be newly planned based on the experience of public sectors, which will ultimately contribute to maximization of effectiveness. Referring the excellent case in the UK, the current BIM standards according to maturity level 2 handle the contents related to modeling, collaborative data production, data management and assure BIM data have to be used from building construction to operation and maintenance of buildings. Therefore the strategy for the utilization of BIM for construction projects in LH consisted of three steps; first, the minimization of defects via BIM: second, strengthening the competitiveness of construction and asset management: third, upgrading the system of building production and maintenance control. After this trial, LH can accumulate know-how for building construction to be more costeffective and competitive.

  • PDF