• Title/Summary/Keyword: Construction Criteria

Search Result 1,690, Processing Time 0.028 seconds

An Empirical Approach Study on Construction Cost Estimation in Public Work Projects (공공사업 예정공사비에 대한 실증적 접근)

  • Yoo, Chang-Kyu;Song, Jeong-Gyu;Lee, Yun-Sun;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.1
    • /
    • pp.65-73
    • /
    • 2009
  • Looking at current construction costs estimations of publicly declared public works, there are many instances where estimation criteria are ambiguous and doesn't imply the reality. Up to date, estimation criteria for calculating construction cost estimations are simply by unit area multiplication and stochastic construction cost estimation. However, possibility of making errors are high due to using uniform data that excludes each public work's specifications and environmental conditions. Further, on the aspect of cost management, there is certain limitation in the efficiency of cost management in order-placing stage and commencing-work stage; while efficient cost management and reduction of expenses are highly possible during initial stages of the project. In this respect, the paper adopts positive approach with regards to construction cost estimations of public works and draws common elements from calculation tables of the construction cost estimations from 3 completed domestic construction works; after which, the paper analyzes whether business exposition, construction guide and publicly-declared estimated construction costs that the orderer issued are calculated economically and properly; deducing problems in the process, the paper seeks to recommend rational calculation method on this.

A Study on the Estimate Criteria and Influence Factors of Construction Duration of Domestic Firms -Focused on the Apartment Building Firms- (국내 건설 업체 공기산정 기준 및 영향요인 연구 -공동주택 중심으로-)

  • Kim Sun-Yeop;Kim Sun-Kuk;Han Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.447-450
    • /
    • 2004
  • The domestic construction industry have focus on duration than construction cost. But recently it have interesting to The domestic construction industry, social requirement is changing. At the moderate speed duration has other angle of reducing cost and management of efficiency. specially Apartment building construction process is similar to other construction industry so it Is obtain a strong Point. This study on, A Target of construction industry is short duration than other it, general construction duration in summary schedule of level is studied, is based and construction duration for the point it is indicated reduction duration

  • PDF

A Study on Practices and Troubles of Reinforced Soil Wall (국내 보강토 옹벽 적용 현황 및 문제점 조사 연구)

  • Park, Jong-Kwon;Lee, Kwang-Wu
    • Journal of the Korean Geosynthetics Society
    • /
    • v.11 no.1
    • /
    • pp.65-75
    • /
    • 2012
  • Since the modem reinforced soil wall technology was introduced in domestic civil engineering society in the year 1980, the reinforced soil walls have been extensively used because these technologies have advantages such as economical efficiency, graceful appearance, and easy construction. This paper describes the application of reinforced soil wall, design criteria, and construction problems. Many cases of troubles, which include a severe deformation of facing, cracks of facing block, overall sliding failure and so on, have been reported. Inappropriate design and construction management mainly induce these problems. The technological level of design and quantity control for reinforced soil wall is not sufficiently supported to cope with the growth quantity of reinforced soil wall construction market and the increasing number of construction companies. The unified standard design and construction criteria of reinforced soil wall should be established with the detail consideration of overall performance and stability. The quality control of design and construction, and cost of construction must be seriously executed to construct a high quality of reinforced soil wall.

Selecting optimized concrete structure by Analytic Hierarchy Process (AHP)

  • Ebrahimi, Morteza;Hedayat, Amir Ahmad;Fakhrabadi, Hamed
    • Computers and Concrete
    • /
    • v.22 no.3
    • /
    • pp.327-336
    • /
    • 2018
  • Increase in population and its daily increasing in our today society results in an increase in housing demand while traditional methods are not applicable. The project preparation and realization processes, based on theoretical and empirical studies, a creation of goods, services, and technologies, are the most important human activities. Selection of effective technological systems in construction is a complex multi-criteria decision-making task. Many decision-makers refuse innovations once faced with similar difficulties. Therefore, using modern materials and methods in this industry is necessary. Modern methods increase quality and construction speed in addition to decrease energy consumption and costs. One of the problems in the way of any project is selecting construction system compatible with the project needs and characteristics. In the present research, different concrete structures such as common reinforced concrete (RC) structure, prefabricated, Insulating Concrete Formwork (ICF), 3D Panel and Tunnel Concrete Formwork (TCF) for buildings with limited floors in Iran are studied and compared from the viewpoint of different criteria like cost, time, applicability and technical characteristics with industrialization approach. Therefore, some questionnaires filled out by construction industry experts in order to compare criteria and sub-criteria in addition to evaluation of optimized structural systems. Then, results of the questionnaires ranked by Analytic Hierarchy Process (AHP) and the most effective alternative selected. The AHP results show that 3D Panel system 36.5%, ICF 21.7%, TCF 19.03%, prefabricated system 13.3% and common RC system 9.3% are the most and the least efficient systems respectively.

A Study on the Establishment of Housing Performance Criteria for Modular Building (모듈러 건축물의 거주환경 성능기준 설정에 관한 연구;음환경 성능을 중심으로)

  • Ko, Kwang-Il;Kim, Yong-In;Lee, Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.628-631
    • /
    • 2006
  • Modular Construction is a method, which factory-produced units are transferred to on-site and assembled to form complete buildings. It is expected that its demand will increase gradually. Because it has some advantages such as duration reduction, movement, reuse and environmental friendliness etc. For the Modular Construction to be introduced and applied, we needs the objective and reasonable performance criteria. This study presents the acoustic performance criteria of the modular building. For this one, this paper reviews legal standard related to performance, analyzes the performance evaluation and survey on pilot projects. The presented performance criteria can be specifically asked the demand by owner in a design guideline. In addition, it makes designer and general contractor accomplish target performance. Eventually, it can improve the performance of Modular Building.

  • PDF

A Study on Analysis of Effectiveness of Incentive by Green Building Certification Criteria (친환경 건축물 인센티브 제도의 실효성 분석에 관한 기초연구)

  • Kwon, Kyong-Soo;Lee, Suk-Won;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.119-120
    • /
    • 2012
  • The government has offered incentives to encourage private companies that are to meet the Green Building Certification Criteria. Despite offering these incentives, the Green Building Certification Criteria record share of newly-built building in 2010 is 0.35%, very low. Effectiveness of Green Building Incentive applied by the Green Building Certification Criteria is questioned. So we attempts to analysis about effectiveness of Green Building by using Cost-Benefit Analysis. But if we want to use CBA, we need to draw cost, benefit factors that compose the incentive. So in this study, for applying CBA, we analysis cost, benefit factors.

  • PDF

Structural Design Criteria for LRT with Rubber Wheels (경량전철 고무차륜 AGT 시스템의 구조물 설계기준)

  • Lee, Hee-Up;Oh, Ji-Taek;Choi, Il-Yoon
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.516-521
    • /
    • 2003
  • The presentation and development of LRT(light rail transit) is one of the effective solution to reduce the heavy traffic problems of urban area The metropolitan cities and operation companies of urban transit railway are driving to. construct the LRT system because of the advantage of construction cost and environmental serviceability. Up to now, the design criteria of structures for LRT is not established. Therefore, this paper presents the structural design criteria for LRT with rubber wheels. The proposed code provides a means of establishing minimum standards for acceptance of design and construction of LRT. In order to improve the proposed design criteria, some details will be tested and evaluated in test line.

  • PDF

Permissible Criteria of the Stiffness of Lightweight Wall by the Horizontal Static Load (정적 수평하중에 의한 경량벽체의 최대변형량 허용기준에 관한 연구)

  • Song, Jung-Hyeon;Kim, Ki-Jun;Choi, Soo-Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.204-205
    • /
    • 2014
  • Among common test methods of assessing structure safety for existing lightweight walls, the criteria of the quality assessment of the horizontal static load resistance has been considered ambiguous. In the current study, therefore, an experiment was conducted to figure out the standardized assessment criteria of the lightweight wall's horizontal static load resistance. Based on the findings of the experiment with gypsum board and ALC block walls, an acceptable amount of each standard and the variables of the stud wall arising from the appropriate load (1000N) on the wall in a daily life were accounted for, arbitrarily setting the maximum deformation amount below 15mm.

  • PDF

A Study on the Problem and Improvement Plan of Rock Bolt Pull Test for Railroad Tunnel Construction (철도 터널 공사용 록볼트 인발 시험의 문제점과 개선방안에 관한 연구)

  • Jang Seog-Jae;Gwak Su-Jeong;Kim Doo-Jun
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.1 s.32
    • /
    • pp.89-94
    • /
    • 2006
  • We, presently, don't have clear diagram methods and analysis criteria in rock bolt pull test usable for tunnel reinforcement. So this paper has suggested that; first, 'scheme of apposite diagram method at hard rock and the different application method of rock bolt pull test at weathered and hard rock', and second, 'the pullout capacity specification criteria for design and construction of rock bolt', based on foreign criteria and field test.

A Study on the adequacy of Hospital Architecture Deign-Build and Improvement of Assessment Criteria - Focus on the case of Architectural Planning Design Change - (병원건축 일괄입찰방식의 적합성과 평가기준 개선방안에 관한 연구 - 건축계획의 설계변경사례를 중심으로 -)

  • Hong, Seung-Min;Yang, Nae-Won
    • Korean Institute of Interior Design Journal
    • /
    • v.21 no.2
    • /
    • pp.215-222
    • /
    • 2012
  • Design-build is expanding gradually in large construction projects over 10billion won, and continue to work in health care facilities is increasing in this way. This constructional method in health care facilities, despite the many advantages, many problems caused by design changes are being raised. Raises the question of design changes on the side of construction contract, such as approval systems have been studied in the field of construction. The purpose of this study design in aspects of architectural planning on changing the grasp of the issues outlined in the ITB and bid evaluation criteria through consideration of the basic plan for improvement guidelines and evaluation criteria is presented. In conclusion, Design build, according to the presence of existing users are more likely to lead to design changes. Thus, hospital architecture, depending on how it is considered that constructional methods. And evaluation items of ITB(Invitation To Bidder) for a large part of the change in the variables evaluated in the hospital building is not suitable for the design build. Instead, the overall shape of the building and department, unit type and size, vertical and horizontal parts of the circulation system in the shape of the building that does not change in structure and etc should be considered for evaluation.

  • PDF