• Title/Summary/Keyword: Construction Criteria

Search Result 1,703, Processing Time 0.031 seconds

Architectural Planning of Elderly Facilities with the Institution and Policy (제도와 정책에 따른 노인복지시설의 건축계획 방향)

  • Nam, Yun-Cheol
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.13 no.3
    • /
    • pp.25-32
    • /
    • 2013
  • The elderly in South Korea in 2012 to 11.8% now aging fast-paced world, which is older than most countries. That is, as long as the elderly people lack the time to respond on the issue could cause many problems. According to the principle of social solidarity, long-term care insurance was introduced for the elderly since July 2008 and facility and sanction salaries were supported for the level 1 (the most serious illness) - level 3 (serious illness) elderly. On the other hand, in the fields of architecture, it is difficult to receive the contents of the unified related articles when the design and construction of the elderly welfare facilities take propel commissioned. This paper not only presents the elderly welfare facilities operated according to the institution and policy of elderly welfare facilities in terms of architecture, but also provides the criteria summarized by building facilities in the field of construction of elderly welfare facilities planning, planning, design is intended to provide basic information. This study addresses are as follows: First, the aging population of South Korea and welfare facilities for the elderly are addressed. Second, in terms of architecture, the institution and policy of elderly welfare facilities in South Korea, are addressed. Third, the construction criteria of elderly welfare facilities is summarized to help architectural practitioners understand. Fourth, the future direction of the architectural design of welfare facilities for the elderly is presented.

Experimental Study on the Buckling Behavior of L-Shaped Header System (L-헤더 시스템의 좌굴 거동에 관한 실험 연구)

  • Park, Wan Soon;Kim, Gap Deuk
    • Journal of Korean Society of Steel Construction
    • /
    • v.14 no.5 s.60
    • /
    • pp.665-674
    • /
    • 2002
  • The back-to-back and box-shaped headers used in light gauge steel structures have some disadvantages, i.e., construction efficiency and cost competitiveness. As such, cold-formed steel L-shaped headers have been developed and are used actively in advanced nations. However, this system has not been used in Korea because of inadequate investigation and adaptation efforts and lack of application example. Thus, this research evaluated the structural performance of L-header using buckling analyses and bending tests. Test results were compared using the AISI design criteria. Test results showed that local buckling and distortional buckling governed buckling behavior in gravity loads and uplift loads, respectively. These results were consistent with the calculated nomial strengths using the AISI design criteria.

Improvements of Design For Safety in Korea based on the Comparative Analysis with Other Countries (해외 유사 제도 비교분석을 통한 설계안전성검토 개선 방안)

  • Kim, Sieun;Jeong, Jaemin;Jeong, Jaewook
    • Journal of the Korean Society of Safety
    • /
    • v.34 no.6
    • /
    • pp.38-49
    • /
    • 2019
  • While the overall industrial accident rate has been decreased, but those of the construction industry has not been. For safety management during the planning/design phase, which accounts for 45% of the cause of accident at the construction site, Design For Safety (DFS) was established to minimize a hazard and risk in 2016. Currently, DFS system has difficulty settling down in Korea due to the several reasons. So, this paper aims to propose to the Key Success Factor (KSF) and related action plan to improve DFS system. This study was conducted by following 2 steps: i) identification of problems on current DFS, and ii) proposal of KSF and following action plan for DFS. The DFS in Korea was compared with UK, Singapore, Australia, and US on 7 criteria (application target, execution period, change of design, collaboration among participants, expert participants, alternative review and decision support system). DFS was compared with other countries's system based on the identical criteria and the corresponding improvement measures were also proposed. The results of this study can be utilized to improve DFS system in various aspects.

A Study on Quality Management Improvement of Used Pipe Support(V2) (재사용 파이프서포트(V2)의 품질관리 향상에 관한 연구)

  • Park, Jongkeun;Choi, Myeongki
    • Journal of the Korean Society of Safety
    • /
    • v.34 no.3
    • /
    • pp.36-41
    • /
    • 2019
  • As the prefabricated shoring system structure, which is a temporary structure, is often collapsed due to various reasons during concrete pouring, and directly affects not only the safety of the workers but also the quality of the final building, it is necessary to ensure the safety. It is considered that the pipe supports which are widely used as the prefabricated shoring materials in the construction site do not satisfy the performance criteria in many cases. Therefore, this study investigated the detailed conditions for satisfying the performance criteria and suggested the factors for improving the quality control level in order to prevent collapse accidents due to pipe supports reused at the construction site, As the results of test in order to understand the effect of the pipe supports (V2), which are being reused in the field, on the performance by factor, the performance was evaluated to be high in case of the small female screw clearance and the supporting pin with 12mm in diameter or larger.

Seismic performance of self-sustaining precast wide beam-column connections for fast construction

  • Wei Zhang;Seonhoon Kim;Deuckhang Lee;Dichuan Zhang;Jong Kim
    • Computers and Concrete
    • /
    • v.32 no.3
    • /
    • pp.339-349
    • /
    • 2023
  • Fast-built construction is a key feature for successful applications of precast concrete (PC) moment frame system in recent construction practices. To this end, by introducing some unique splicing details in precast connections, especially between PC columns including panel zones, use of temporary supports and bracings can be minimized based on their self-sustaining nature. In addition, precast wide beams are commonly adopted for better economic feasibility. In this study, three self-sustaining precast concrete (PC) wide beam-column connection specimens were fabricated and tested under reversed cyclic loadings, and their seismic performances were quantitatively evaluated in terms of strength, ductility, failure modes, energy dissipation and stiffness degradation. Test results were compared with ASCE 41-17 nonlinear modeling curves and its corresponding acceptance criteria. On this basis, an improved macro modeling method was explored for a more accurate simulation. It appeared that all the test specimens fully satisfy the acceptance criteria, but the implicit joint model recommended in ASCE 41-17 tends to underestimate the joint shear stiffness of PC wide beam-column connection. While, the explicit joint model along with concentrated plastic hinge modeling technique is able to present better accuracy in simulating the cyclic responses of PC wide beam-column connections.

Development of Economic Analysis Model for Rebuilding Feasibility Evaluation of Old School Building (노후 학교건물의 개축 타당성 평가를 위한 경제성 분석 모델 개발)

  • Lee, Changsu;Ahn, Heejae;Kwon, Woobin;Kim, Minju;Kim, Harim;Cho, Hunhee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.273-274
    • /
    • 2023
  • Although there are many old school buildings that is more than 40 years in Korea, it is difficult to rebuild all of them due to limitations in budget management. Therefore, objective feasibility evaluation criteria are necessary to determine which school buildings should be rebuilt preferentially among the numerous old school buildings. One of the rebuilding feasibility evaluation items, economic evaluation generally requires documents such as construction statements and facility drawings. However, because most buildings older than 40 years do not have these documents, an economic analysis model that requires only basic building information should be developed. In this study, the economic analysis model that can be used for evaluating the rebuilding feasibility only with the number of years, total floor area, and structural information of school buildings was established. This model can contribute to the objective feasibility evaluation of old school buildings because it can evaluate numerous buildings on the same criteria based on basic building information.

  • PDF

An Estimating System for the CO2 Emissions using Discrete Event Simulation (이산 사건 시뮬레이션을 활용한 건설공정 CO2 배출량 추정 시스템)

  • Yi, Chang-Yong;Gwak, Han-Seong;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.196-197
    • /
    • 2014
  • Low carbon construction is an important operation management goal such as cost, time, and quality in construction community. This paper introduces a system which measures the variability of carbon dioxide amounts. First, this system allows creating construction operation models of which the level of detail is breakdown into the work task level. Second, the system implements sensitivity analysis along with a ranges of resources that are allocated in an operation model. It facilitates to find the optimal resource combination using the operation performances such as the amount of emissions, operation completion time, and cost. Lastly, it identifies the best fit probability distribution functions of performance criteria given a certain resource combination. It allows project manager to query the percentages to complete the operation within a limitation specified by the system users.

  • PDF

An Analysis on the Labor Change Factor for Site Selection in Enactment and/or Revision of Construction Standard Production Unit (표준품셈 제·개정에 있어 실사현장 선정을 위한 품 변화요인 분석)

  • Shin, Won-Sang;Kim, Yong-Woo;Lee, Dong-Eun;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.11-12
    • /
    • 2011
  • The Construction Standard Production Unit(CSPU) has been used for the standard cost estimate in public and private construction projects. However, It is difficult to reflect the various site attributed variation in productivity using existing CSPU. The reason is that a criteria which site should be selection for enactment and/or revision of CSPU is not established. This study aims to provide essential data to be used for analyzing the labor factors in a way to secure efficiency and reliability of CSPU.

  • PDF

BALANCED SCORECARD PERFORMANCE MEASUREMENT AND CONTRACTOR SELECTION USING A WEB-BASED SYSTEM

  • J. Johnson;V. Peansupap;S. Jayasena
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.259-268
    • /
    • 2007
  • In a very competitive construction business environment there is a need to measure and manage business performance across a wider spectrum of business success criteria. The Balanced Scorecard (BSC) and Triple Bottom Line (TBL) reporting concepts are emerging as champions in the race for sustainable business success. The construction business organisations are often judged based on their financial performance as well as wider performance. This paper aims at developing a universally accepted tool for assessing contractors' wider business performance in the construction industry. A prototype of web-based business performance measurement system has been developed to help contractors assess their own performance aimed at uplifting their performance. The consultants/clients can also use the tool to measure contractors' performance in a value-based contractor selection. The system was developed based on the research conducted among 63 senior construction professionals and therefore further research with the participation of a large number of managers across different countries and also an upgrade of the system will be required.

  • PDF

MANAGERIAL AND ECONOMIC OPTIMIZATIONS FOR PREFABRICATED BUILDING SYSTEMS

  • Ahmed Abdallah
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.606-614
    • /
    • 2005
  • This paper deals with new realizations of research, scientific development, managerial and economic optimizations for prefabricated building systems. In the literature, all scientific fields are worked out based on the efficiencies, costs, benefits, choice of execution design, technical demands, aesthetical point of view, as well as the total economics. In the present example of a school-building for communities in the third world, the following criteria have been regarded: The optimal superstructure of prefabricated concrete building systems; the particularity of countries of the Third World (e.g. the climate, the political and the economic conditions); the time for construction and necessary innovative developments for an economically optimized superstructure. Added to this are alternative construction-methods and costs for a simple but variable system which can be adapted to changing functions, where variability should be the main point. For example, a school building that is to be adapted by varying number of rooms to cater for the growing number of pupils.

  • PDF