사례분석을 통한 설계대가 기준 개선 방향 마련 기초연구 (Fundamental Rearch to Prepare a Direction to Improve the Design Fee Standard through Case Analysis)

  • 한재구
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 가을 학술논문 발표대회
    • /
    • pp.179-180
    • /
    • 2020
  • In the budgeting guidelines, there are rules for calculating design fee and direct costs. However, only the design fee is calculated excluding the direct cost, which causes the cost to be insufficient. Therefore, this study is designed to analyze representative cases where direct costs are insufficient, draw out problems, and propose a way to improve design fees.

  • PDF

Database Program for Managing Management Resources: General Contractor's Perspectives

  • Yong-Woo Kim;Sungwon Shin
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1100-1106
    • /
    • 2009
  • General contractors' overhead costs are increasing relative to direct costs. However, it is difficult to apply the traditional activity-based costing directly to the construction site overhead costing because the resource consumption rate per each activity is varied depending on the attributes of activities. The research develops a methodology of hybrid cost allocation system when resources are assigned to cost objects unlike the traditional activity-based costing. The study also develops a database program and demonstrates how it can be applied to the construction projects using a case study.

  • PDF

사례기반추론을 이용한 강박스거더교의 개략공사비 산정 및 검증 (Computation and Verification of Approximate Construction cost of Steel Box Girder Bridge by Using Case-Based Reasoning)

  • 정민선;경갑수;전은경;권순철
    • 한국강구조학회 논문집
    • /
    • 제23권5호
    • /
    • pp.557-568
    • /
    • 2011
  • 공공 건설공사에서 공사 단계별 합리적인 공사비를 산정하는 것은 국가 예산의 효율적 확보 및 집행 등에 있어 매우 중요한 요소이다. 본 논문에서는 사업 초기단계의 가용정보가 제한된 조건에서 사례기반을 적용하여 강박스거더교의 개략공사비 추정 방안을 제시하였다. 또한 공사비 예측모델을 기존 설계사례에 대해 적용하여 본 논문에서 제시한 개략공사비 추정 모델의 정확성을 검증하였다. 연구 결과, 오차율은 비교적 안정적인 결과를 도출할 수 있었다. 따라서 국가 예산의 집행이나 수립에서 개략공사비 추정을 효율적으로 제시 할 수 있을 것으로 판단된다.

시뮬레이션 기법 기반 공정계획 수립을 위한 데이터베이스 구축 방법론 (Database establishment method for process scheduling by means of simulation)

  • 고용호;노재윤;키앙;신도형;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 봄 학술논문 발표대회
    • /
    • pp.69-70
    • /
    • 2022
  • The domestic process planning generally relies on calculations based on the construction-standard-production-rate. This method requires trial and error practice during the construction phase to deduce the optimized equipment combination for time and cost. Trial and error during construction can lead to cost overruns and schedule delays. Accordingly, this paper suggests an advanced method for establishing a productivity database based on combinations of equipment and also considering site conditions in order to reduce the timely effort for deducing the optimized equipment combination. For this purpose DES (Discrete Event Simulation) model was developed based on the information provided in the construction-standard-production-rate.

  • PDF

RC라멘교의 기본설계단계 개략공사비 산정모델 (The Conceptual Cost Estimate Model on Preliminary Design Phase for RC Rahmen Bridge)

  • 김병수;권석현
    • 한국건설관리학회논문집
    • /
    • 제10권2호
    • /
    • pp.111-120
    • /
    • 2009
  • 건설공사에 소요되는 공사비의 개략적인 산정은 건설프로젝트의 계획단계뿐만 아니라 기본설계단계에서 예산을 확정하기 위해서 필수적이다. 현재 국내의 개략공사비 산정모델은 단위길이당 단가 또는 단위면적당의 단가를 이용하여 계산하는 선형적인 단순 모델로써 오차율이 너무 큰 문제점이 있다. 본 연구에서는 과다한 오차율의 문제를 해결하기 위하여 RC라멘교의 특성을 고려하였으며 공사비의 변동특성에 따라 그룹핑(Grouping) 및 대표물량방식 그리고 합성단가를 사용한 모델을 개발하였다. 본 연구의 결과 실제 설계공사비와의 오차를 상당히 줄일 수 있었으며 따라서 발주처나 용역업체에서 RC라멘교의 예산을 산정하는데 기여할 것으로 기대한다.

소규모 건설 프로젝트에서의 공사예비비 산정방법에 관한 연구 (A Study on Estimating the Contingency Cost of Small Construct Project)

  • 송진우;표영민;박성호;이상범
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2004년도 학술.기술논문발표회
    • /
    • pp.113-117
    • /
    • 2004
  • We need the contingency cost in order to deal with the uncertainty to be accompanied inevitably at the construction and an every kind risk not to forecast in advance. And also the contingency colt needed for the change order and we need it for reduction of the delay and reduce the trouble between owner and constructor. This study, through checking and analyzing the risk factor, in the step of domestic construction, suggests optimal management reserve to specific business about the contract type and the scale. The main results of this research are summarized as follow. First, I investigated the recognition about the contingency cost, grasped the risk to be happened at the construction step and found out the frequency occurrence, through making up question to engineer are carrying out their job in the domestic construction. Second, I computed optimal contingency cost rate by the statistics investigation, and proposed an improvement plan and problem when compute a contingency cost.

  • PDF

실적자료에 의한 공동주택 하자보수비용의 시계열적 분석 (A Study on the Time Series Analysis of Defect Maintenance Cost in Apartment House according to the Actual Use Data)

  • 송동현;이상범
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 1부
    • /
    • pp.177-178
    • /
    • 2011
  • Recently a great deal of people are taking legal action against the housing provider due to the defects of their Apartment house. And most of the housing companies are spending a huge amount of expenses and efforts to keep their brand value. This essay will carry out time series analysis the 20 housing district which are constructed by huge construction companies. This analysis itemised by metropolitan area(Seoul) and others to keep the degree of reliability, and converted future defect maintenance cost into current cost applied by discount rate to figure out suitability of defect maintenance cost. Even though, this essay is not able to represent standard of defect maintenance cost due to the insufficiency of record, while it will be assisted as a referance when long-term record of time series is estabilished.

  • PDF

산업안전보건관리비 계상기준 개선방안 연구 (A Study on Improving the Occupational Safety and Health Management Cost Calculation Standards)

  • 안방율;송태석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.169-170
    • /
    • 2020
  • Occupational Safety and Health Management Cost, used to protect workers in Korean construction worksites and to create safe working environments, is a legally managed expense item. As this cost item is grounded on the Occupational Safety and Health Act, it is always implemented. However, because there is a ceiling on its rates, insufficient amounts of Safety Management Costs are often allocated to worksites, with the money not being used to areas essential to worker safety. As such, the current study raises the need to develop a set of standards to enable some items under the Occupational Safety and Health Management Costs-appropriated under the rate of indirect costs-to be appropriated as direct construction costs. As a preliminary step in this effort, the current study will provide basic data that can be used to create construction cost calculation standards for items that can be calculated as direct construction costs.

  • PDF

다목적 복합 센서를 이용한 건설 장비 성과율 측정 알고리즘 개발 (Development of Algorithm for Measuring Performance Rate of Construction Equipment using a Multipurpose Composite Sensor)

  • 권재범;김춘학;김창원;조대구;조훈희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.9-10
    • /
    • 2012
  • Efficient operation of construction equipment has become more and more important in the competitive construction environment. Accurate measurement of performance rate of construction equipment is a critical factor for a construction project planning. However, it might be quite difficult to measure the performance rate due to diverse practical limitations such as continuously variable performance rate of construction equipment, considerable indirect cost, large construction field, and so on. Therefore, the purpose of this paper is to propose an automatic algorithm that measures a performance rate of construction equipment with a multipurpose composite sensor. It is expected that the algorithm compiles database on construction equipment and in advance, facilitates efficient operation of construction equipment.

  • PDF

의료시설 사업계획서의 건축사업비 산정에 관한 연구 (A Study on the Calculation of Construction Project Cost of Healthcare Facility Business Plan)

  • 최광석
    • 의료ㆍ복지 건축 : 한국의료복지건축학회 논문집
    • /
    • 제27권2호
    • /
    • pp.7-14
    • /
    • 2021
  • Purpose: The purpose of this study is to provide an effective construction project cost estimation tool for preparing a business plan of healthcare facilities which can be practically used for development projects. Methods: In order to provide a tool for calculating construction project costs, this study analyzed the Building and Related Laws, the Building Technology Promotion Laws, the Ministry of Land, Infrastructure and Transport notifications and directives, the Ministry of Trade, Industry and Energy notifications, the detailed guidelines of the Ministry of Strategy and Finance, the Building Service Industry Promotion Acts, various certification standards, actual project budget calculation cases, etc. with advices from related experts. Results: 1) Construction cost is classified into construction costs, architectural design costs, supervision costs, incidental costs, and each sub-element. In particular, since there are many incidental cost items, essential items to be reviewed during planning are derived and costs are calculated according to appropriate consideration criteria. 2) Criteria for Payment calculation mainly applies the construction cost rate method or the actual cost fixed amount method in consideration of the characteristics and scope of work. Implications: There are many calculation factors that need to be applied to the construction project cost. Therefore, it is necessary to organize the calculation process more clearly.