• 제목/요약/키워드: Construction Cost Model

검색결과 1,116건 처리시간 0.027초

A STUDY ON DURATION ESTIMATE METHOD USING STOCHASTIC MODEL IN THE BIM ENVIRONMENT

  • Jae H. Park;Seok H. Yun;Joon H. Paek
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1209-1215
    • /
    • 2009
  • Recently, Construction Projects are being much bigger and more complex. So the importance of Construction Planning and Management is increasing and increasing because of the Construction Projects is involved in a variety of construction-related subjects. Competitive of the Construction Industry decided Cost, Construction Duration and Productivity. But they were just focused on Cost Saving instead of Construction Duration and Productivity. However, they have to finish construction projects using minimum cost and duration with quality and function of required level for successful Construction projects. Thus, current high exchange rate and high period, it is clear to decrease construction cost and to do economic construction in huge Construction Projects and it means more advanced Construction Schedule Management needs for economic construction. But Construction Scheduling Planning, basic of Construction Schedule Management, adjusted contract period without Pre-Planning, just depending on experience and ability of Construction Engineer. Because of that, this study suggests new Duration Estimate Method using Stochastic Model in BIM Environment for advanced Construction Schedule Management. Existing Duration Estimate Methods are just modified wrong points of them or analyzed effective factors of construction schedule. However, New Duration Estimate Method is just consists of Stochastic Model and BIM Environment without existing Duration Estimate Methods. So, new method has creativity and specialty. After this research, it would be a great model in construction industry field.

  • PDF

초기 기획단계의 신한옥 공사비 예측 모델 - 모듈(칸) 기반의 목공사 개략 물량 산출 중심으로 - (Preliminary Construction Cost Prediction Model Based on Module for Modernized Hanok)

  • 강승희;정영수
    • 한국건설관리학회논문집
    • /
    • 제21권3호
    • /
    • pp.48-56
    • /
    • 2020
  • 기획단계에서의 공사비 예측은 타당성 분석, 예산 책정, 계획수립 등을 위한 기초정보를 제공한다는 점에서 성공적인 프로젝트 수행을 위한 중요한 요소이다. 본 연구에서는 초기 기획단계의 신한옥 공사비 예측 정확도 향상을 목적으로 전체 공사비 중 가장 많은 비중을 차지하는 목공사는 다양한 조건(구조형식, 지붕형태, 평면형태 등)에 의해 개략 물량을 자동 산출하여 공사비를 예측하고, 이외의 공종은 단위단가식을 적용해 공사비를 예측하는 모델을 제시하였다. 2개의 사례를 대상으로 개략 견적 모델로써의 활용성 및 타당성을 검증하였으며, 총공사비의 오차율은 각각 -4%(사례 1), -6%(사례2)로 나타났다. 이러한 결과값은 초기 기획단계에서 실무활용 가능한 범위에서의 오차를 보였다.

서포트 벡터 머신을 이용한 건설업 안전보건관리비 예측 모델 (Construction Safety and Health Management Cost Prediction Model using Support Vector Machine)

  • 신성우
    • 한국안전학회지
    • /
    • 제32권1호
    • /
    • pp.115-120
    • /
    • 2017
  • The aim of this study is to develop construction safety and health management cost prediction model using support vector machine (SVM). To this end, theoretical concept of SVM is investigated to formulate the cost prediction model. Input and output variables have been selected by analyzing the balancing accounts for the completed construction project. In order to train and validate the proposed prediction model, 150 data sets have been gathered from field. Effects of SVM parameters on prediction accuracy are analyzed and from which the optimal parameter values have been determined. The prediction performance tests are conducted to confirm the applicability of the proposed model. Based on the results, it is concluded that the proposed SVM model can effectively be used to predict the construction safety and health management cost.

건축 구조체 공사비 산정모델 개발을 위한 데이터 분석 - 공공청사를 중심으로 - (Analyzing Data for Development of Structures Cost Estimating Model - Focused on Government Building Project -)

  • 김수민;조재호;이종식;전재열
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.212-215
    • /
    • 2008
  • 건축공사의 공사비 절감은 시공단계보다 사업초기단계 및 설계단계에서 정확한 공사비 예측을 함으로써 더욱 효율적으로 절감될 수 있다. 하지만 현행 공공 건설공사의 공사비 산정 및 관리는 실시설계 이후로 집중되어 있어, 계산견적을 중심으로 실시되는 기획 및 기본설계단계에서의 사업비관리는 매우 취약하다고 볼 수 있다. 이에 본 연구에서는 현행 공사비 산정 방법의 문제점 및 실적공사비 사례정보 분석하여 기본설계단계에서 구체적 비용 계획을 세우고 이에 부합되는 설계가 진행되는지 검토 가능한 공사비 산정모델 개발을 위한 예비적 연구를 수행하였다.

  • PDF

공공아파트 계획설계단계에서의 공사비 예측모델 (Cost prediction model of Public Multi-housing Projects in Schematic Design Phase)

  • 권호석;문현석;이성균;홍태훈;구교진;현창택
    • 한국건설관리학회논문집
    • /
    • 제9권3호
    • /
    • pp.65-74
    • /
    • 2008
  • 국내 건설산업의 공공 발주자는 사업의 초기단계의 사업비관리에 대한 중요성을 충분히 인식하고 있음에도 불구하고 체계화된 공사비 산정시스템을 보유하고 있지 못한 실정이다. 이에 신규 공공 건설공사를 기획하고 사업비를 책정하는 단계에서는 예산을 수립하는 담당자가 기존의 실적데이터와 경험을 바탕으로 공사비를 추정하고 있으며, 기본설계단계와 실시설계단계 이후 산정된 공사비를 책정된 예산과 비교 후 사업의 추진여부를 검토하거나 설계내용을 예산에 맞도록 변경하고 있다. 이에 본 연구에서는 공공아파트의 사업초기단계에서 공사비를 산정할 수 있는 공공아파트 계획설계단계에서의 공사비 예측모델을 개발하고자 하였다. 본 연구의 결과를 바탕으로 계획설계단계에서 공사비를 예측하고 사업비 및 전반적인 설계를 관리한다면 지금보다 더 효율적인 방법으로 국가의 재원을 적절하게 책정하고 집행할 수 있을 것으로 판단된다.

Development of Time-Cost Models for Building Construction Projects in Bangladesh

  • Rahman, MD. Mizanur;Lee, Young Dai;Ha, Duy Khanh;Chun, Yong Hyun
    • Journal of Construction Engineering and Project Management
    • /
    • 제4권3호
    • /
    • pp.13-20
    • /
    • 2014
  • Estimating time and cost is an important mission in the early phase of a construction project, especially in feasibility study. It provides a foundation for making decision whether or not the project is performed on schedule and within budget. Thus, reliability of this estimate plays a key role in measuring the success of a project. This study was carried out to investigate the time-cost relationship in building construction projects in Bangladesh. The mathematical equation used in this study is based on Bromilow's equation. The research data were collected from sixty-three completed building projects through questionnaire survey. Type of clients, type of projects, and tender methods are the project characteristics considered in this study. The results of analysis indicated that the Bromilow's time-cost (BTC) models developed for each project characteristic are appropriate due to quite high coefficient of determination and relatively small mean percent errors. Among them, the forecasted model for time and cost according to tender methods is the best fit model. It is concluded that the BTC model could be applied in building construction project to predict its time and cost in Bangladesh. Four different regression models were also developed in this study. The results of BTC model between some selected countries were compared to gain the comprehensive view.

Product Configuration Model 개념 기반의 함정 건조공수 추정 연구 (Construction Cost Estimation on the Initial Design Stage of Naval Ships based on a Product Configuration Model)

  • 오대균;정연환;신종계;최양열
    • 대한조선학회논문집
    • /
    • 제46권3호
    • /
    • pp.351-361
    • /
    • 2009
  • Many manufacturers define the system of a new product flexibility, and take advantage of previous-product information using the product configuration concept. Product configuration is an approach that defines the system of a new product centered on the product structure by referring to the previous-product information. In this paper, it is established how to apply the concept of a product configuration utilizing previous-ships information in construction cost estimation process systematically and effectively. For this, we define the advanced-construction cost estimation process based on a naval ship product model, and design construction cost estimating model. It is validated that this process and model have the applicability through the case study of the construction cost estimating of the mine-warfare ship.

산출내역서.공정 통합관리 모형 구축에 관한 연구 (Work Management Model to Integrate Schedule and Bill of Quantit)

  • 박홍태;박찬정
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2002년도 학술.기술논문발표회
    • /
    • pp.123-131
    • /
    • 2002
  • Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule, the existing systems, however, are focused on the cost management by using wort quantity. This study suggests a work management mode1 to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction cost to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.

  • PDF

산출내역서.공정 통합관리 모형 구축에 관한 연구 (Work Management Model to Integrate Schedule and Bill of Quantity)

  • 박홍태;박찬정
    • 한국건축시공학회지
    • /
    • 제2권4호
    • /
    • pp.153-161
    • /
    • 2002
  • Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule. the existing systems, however, are focused on the cost management by using work quantity. This study suggests a work management model to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction rest to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.

군 시설공사의 공사비지수 개발에 관한 연구 (A Study on Development of Cost Index Model for Military Facilities Construction)

  • 박종원;손보식;이현수
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.256-260
    • /
    • 2004
  • 군 시설공사비는 국방예산의 많은 부분을 차지하고 있으며, 사업예산의 합리적인 편성은 군 시설업무 관련자의 중요한 관심사이다. 그러나 시설예산 편성시 기준으로 제시되는 시설물 단가를 실제 공사의 집행금액과 비교하면 항상 부족예산이 발생되므로, 이를 보정하여 적정한 공사비를 산정하는데 어려움을 겪고 있다. 이러한 문제를 해결하기 위해 과거의 실적공사비를 현재의 가치로 환산할 수 있는 공사비지수를 개발하여 적용함으로써 예산편성 업무의 효율성을 높이고 합리적인 의사결정을 지원하고자 한다. 본 연구는 실적공사비를 분석하여 공사비 결정에 중요한 영향을 끼치는 요소들을 도출하였다. 도출된 영향요소를 재료비, 노무비, 경비의 비목으로 구분하고 각 요소들이 공사비에서 차지하는 영향도를 기준으로 가중치를 산정한 후, 가중평균산식에 의한 공사비지수를 개발하였다.

  • PDF