• Title/Summary/Keyword: Construction Cost Management

Search Result 1,999, Processing Time 0.029 seconds

Construction Safety and Health Management Cost Prediction Model using Support Vector Machine (서포트 벡터 머신을 이용한 건설업 안전보건관리비 예측 모델)

  • Shin, Sung Woo
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.1
    • /
    • pp.115-120
    • /
    • 2017
  • The aim of this study is to develop construction safety and health management cost prediction model using support vector machine (SVM). To this end, theoretical concept of SVM is investigated to formulate the cost prediction model. Input and output variables have been selected by analyzing the balancing accounts for the completed construction project. In order to train and validate the proposed prediction model, 150 data sets have been gathered from field. Effects of SVM parameters on prediction accuracy are analyzed and from which the optimal parameter values have been determined. The prediction performance tests are conducted to confirm the applicability of the proposed model. Based on the results, it is concluded that the proposed SVM model can effectively be used to predict the construction safety and health management cost.

PROBABILISTIC MEASUREMENT OF RISK ASSOCIATED WITH INITIAL COST ESTIMATES

  • Seokyon Hwang
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.488-493
    • /
    • 2013
  • Accurate initial cost estimates are essential to effective management of construction projects where many decisions are made in the course of project management by referencing the estimates. In practice, the initial estimates are frequently derived from historical actual cost data, for which standard distribution-based techniques are widely applied in the construction industry to account for risk associated with the estimates. This approach assumes the same probability distribution of estimate errors for any selected estimates. This assumption, however, is not always satisfied. In order to account for the probabilistic nature of estimate errors, an alternative method for measuring the risk associated with a selected initial estimate is developed by applying the Bayesian probability approach. An application example include demonstrates how the method is implemented. A hypothesis test is conducted to reveal the robustness of the Bayesian probability model. The method is envisioned to effectively complement cost estimating methods that are currently in use by providing benefits as follows: (1) it effectively accounts for the probabilistic nature of errors in estimates; (2) it is easy to implement by using historical estimates and actual costs that are readily available in most construction companies; and (3) it minimizes subjective judgment by using quantitative data only.

  • PDF

A Study on the Proper Rate of the Safety Management Cost under the Construction Technology Promotion Act by Direct Calculation (건설기술진흥법 상 안전관리비에 대한 적산 및 품셈을 통한 적정 요율 산정에 관한 연구)

  • Chae, Yong Sup;Yoon, Young Geun;Oh, Tae Keun
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.2
    • /
    • pp.68-75
    • /
    • 2018
  • The safety management cost system under the Construction Technology Promotion Act has contributed greatly to the prevention of construction accidents according to the chronological changes and social demand, but various problems have been pointed out. The biggest problem is that the safety management cost is earmarked very low because other items of safety management costs except for the safety inspection are not appropriately included in the actual construction site. Furthermore, it has been pointed out that it is difficult to settle the orderer due to the lack of specific use criteria. Therefore, in order to secure the proper safety management cost, this study is to estimate the actual cost by using of specification, quantity, material cost, labor cost for each type of the safety management item The results of this study were compared with the 71 cases of safety management costs in the safety management plan. In addition, analysis of unclear or unnecessary items in the current safety management cost and criteria and suggestions for improvement are provided. It is hoped that the results of this study will contribute to the rational safety management rate calculation.

A COST-BENEFIT ANALYSIS OF INTEGRATING ERP SYSTEMS WITH PROJECT MANAGEMENT SYSTEMS IN CONSTRUCTION

  • BooYoung Chung;Miroslaw J. Skibniewski
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.575-586
    • /
    • 2005
  • This paper presents an approach to quantifying the costs and benefits of integrating ERP systems with project management systems, including potential time and cost savings. To properly identify the costs and the benefits, the paper shows the relevant construction information flows and the desired milestones in the integration process. The proposed benefit analysis model should allow construction firms considering the integration of their ERP systems with legacy systems or commercial project management software make informed decisions in regard to the existing alternatives in the early stages of decision making.

  • PDF

A Study on Improvement of Occupational Safety and Health Management Cost Accounting Standards (대규모 건설현장 건설업 산업안전보건관리비 계상기준 개선에 관한 연구)

  • Baek, Yuonghyun;Wee, Kyungsu;Baek, Insoo;Kim, Jaejun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.39-46
    • /
    • 2020
  • Occupational Safety and Health Management Cost were introduced in 1988 to prevent human safety accidents occurring in industrial sites. However, the accounting standards of Occupational Safety and Health Management Cost based on five construction types and three construction amounts do not reflect the characteristics of various construction sites. In order to understand this problem, this study analyzed the utilization rate and usage details of Occupational Safety and Health Management Cost of domestic construction companies. As a result, this study identified considerable number of projects surpassed the limits of allowed usage of Occupational Safety and Health Management Cost and analyzed their causes. Based on these findings, this study suggests the necessity and direction of improvement of Occupational Safety and Health Management Cost accounting standards.

Factors Affecting Application of Cost Management Accounting: Evidence from Small and Medium Enterprises in Vietnam

  • NGUYEN, Co Trong;NGUYEN, Tung Dao;NGO, Hoang Thanh
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.9 no.4
    • /
    • pp.185-190
    • /
    • 2022
  • The article analyzes the impact of factors affecting the application of management accounting in Vietnamese small and medium enterprises. It provides more empirical evidence on the factors affecting the application of cost management accounting. The research methodology involved a questionnaire survey of managers at all levels, and chief accountants and accountants of 65 Vietnamese construction enterprises. 220 questionnaires were collected in total, out of which 14 invalid questionnaires were not used due to many blank cells. The 5-level Likert scale is familiarly used in many studies, so the author also quantifies each factor according to five levels. Quantitative research was carried out with SPSS 25 software. Research results show that 4 factors positively influence the application of cost management accounting, including Business strategy, Management cost control, level of accounting staff, and Manager's point of view on cost management accounting. The level of accounting staff factor has the strongest influence on the application. Based on the research results, the author has proposed recommendations to improve the application of cost management accounting techniques of construction enterprises, thereby contributing to enhancing competitiveness and efficiency activities of construction enterprises in Vietnam.

Improved Estimating Guideline for Quality Management Cost (건설공사 품질관리비 신출기준 개선방안)

  • Kim Kyoon-Tai;Ahn Bang-Ryul;Park Hyeong-Geun;Kim Kyong-Ju
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.3 s.11
    • /
    • pp.75-83
    • /
    • 2002
  • Korea government established a domestic quality management system under the Law for Construction Technology Management, which was revised in 1997. This Law prescribes that the owner has to assign quality management cost into the construction project budget However, there are some conflicts among internal regulations and prescriptions on the scope of quality management engineer's roles was not specific. In order to overcome these limitations, this research identifies proper scope of quality management engineer's roles and suggests an approach for an improved estimating guideline for construction quality management cost.

Forecasting of building construction cost variation using BCCI and it's application (건축공사비지수를 이용한 건설물가 변동분석 및 공사비 실적자료 활용방안 연구)

  • Cho Hun Hee;Kang Kyung In;Kim Chang Duk;Cho moon Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.64-71
    • /
    • 2002
  • This research developed construction cost forecasting model using Building Construction Cost Index, time series analysis and Artificial Neural Networks. By this model, we could calculate the forecasted values of construction cost precisely and efficiently. And we also could find out that the standard deviation of forecasted values is 0.375 and it is a very exact result, so the standard deviation is just 0.33 percent of 112.28, the average of Building Construction Cost Index. And it show more exact forecasting result in comparison with Time Series Analysis.

  • PDF

Challenges to Prevent in Practice for Effective Cost and Time Control of Construction Projects

  • Olawale, Yakubu A.
    • Journal of Construction Engineering and Project Management
    • /
    • v.10 no.1
    • /
    • pp.16-32
    • /
    • 2020
  • Cost and time control of projects is important in preventing project failure. However, achieving effective cost and time control in practice is often challenging. The challenges of project cost and time control in practice are investigated by carrying out a questionnaire survey on the top 150 construction contractors in the UK followed by in-depth semi-structured interviews of practitioners from 15 construction companies in the country. Quantitative analysis reveals that design change is the most important factor inhibiting the ability of UK contractors from effectively controlling both the cost and time of construction projects. Four of the top five factors inhibiting effective cost control are also the top factors inhibiting effective time control albeit in a different order. These top factors-design changes, inaccurate evaluation of project time/duration, risk and uncertainty, non-performance of subcontractors and nominated suppliers were also found to be endogenous factors to the project. Additionally, qualitative analysis of the interviews reveals 16 key challenges to prevent for effective project cost and time control in practice. These are classified into four categorised based on where they stem from as follows; from the organisation (1. Lack of integration of cost and time during project control, 2. lack of management buy-in, 3. complicated project control systems and processes, 4. lack of a project control training regime); from the construction management/project management approach (5. Lapses in integration of interfaces, 6. project control not being implemented from the early stages of a project, 7. inefficient utilisation and control of labour, 8. limited time devoted to planning how a project will be controlled at the outset); from the client; (9. Excessive authorisation gates, 10. use of adversarial and non-collaborative forms of contracts, 11. communication problems within client set-up, 12. obstructive client representatives) and; from the project team (13. Lack of detailed/complete design, 14. lack of trust among the project partners, 15. limited time devoted to project control on site, 16. non-factual reporting). The study posits that knowledge of these project control inhibiting factors and challenges is the first step at ensuring they are avoided and enable the implementation of a more effective project cost and time control process in practice.

A Study on the Cost Hierarchical System of Nuclaer Power Plant Construction Project for Introcusting Earned Vaule Management System (성과관리시스템(EVMS) 도입을 위한 원전 건설사업비 관리체계 세분화 방안에 관한 연구)

  • Lee, Sang-Hyun;Kim, Woo-Joong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.230-231
    • /
    • 2019
  • The nuclear power plant construction project is large-scale, has various stakeholders and computer system, and is produced and managed a large amount of information. The domestic nuclear power plant construction project has accumulated data based on many years of experience in the system. It has the competitiveness to suggeest alternatives that meet the requirement of the client in the overseas nuclear power plant project. Earned value management, which integrates schedule and cost, is possible to risk management. It was developed the earned value management system considering the the actual data properties and types of the preceding nuclear power plant construction projects. It will be able to increase the nuclaer power plant export competieiveness. Therefore, it was palned to carry out future stuies so that it be able to complement the measure to integrate cost and schedule in consideration of actual data(quantity of activity, etc.).

  • PDF