국제유가 변동에 따른 건설자재가격 변화 분석 (Analysis of Change of Construction Material Price by International Oil Price Fluctuation)

  • 박진용;변정윤;유승규;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.319-320
    • /
    • 2012
  • International oil prices is the world's leading macroeconomic indicators. Rising international oil price has been worsening. profitability of construction company including material cost as well stagnation in housing market. Thus, according to fluctuations in international oil prices has cost index need to see any change happening there. in this study, 2000 to 2011 interest rates, exchange rates and oil price fluctuations in construction cost is to compare the impact.

  • PDF

갈등지수 산정에 의한 사업기간 및 비용 예측 - 공동주택 재건축사업을 중심으로 - (Estimate the Period and Cost of Projects by Estimating the Conflict Index - Concentrated on the Apartment Reconstruction Project -)

  • 이로나;이학기
    • 한국건설관리학회논문집
    • /
    • 제13권1호
    • /
    • pp.87-94
    • /
    • 2012
  • 공동주택 재건축사업은 주거환경개선 및 신규 주택공급이라는 도시 계획적 순기능을 가지고 있지만, 원주민의 재정착 실패 및 소득 재분배 실패, 부동산투기, 주택가격의 급상승, 사업주체간의 갈등, 제도 미비 등 복합적인 요인에 의하여 사업 의도가 왜곡되고 재건축사업의 추진이 원활히 진행되지 못하고 있는 실정이다. 재건축사업 주체간의 갈등은 사소한 갈등이 확산되어 분쟁과 소송으로 이어지며, 그 결과 재건축사업이 원활히 추진되지 못하게 되어 사업기간과 비용을 증가시키거나 중단되는 경우가 발생하게 된다. 본 논문은 재건축사업의 역기능 중 사업주체간의 갈등을 예방하고 해결하기 위한 노력으로 재건축사업 추진과정을 중심으로 갈등지수를 산정하고 갈등지수를 이용하여 재건축사업의 기간과 비용을 예측하고자 한다. 갈등지수는 재건축사업의 주체간의 갈등요인을 중심으로 신정하며, 갈등지수를 포함한 여러 가지 독립변수를 이용하여 재건축사업의 기간과 비용을 예측한다. 또한 갈등지수의 산정과 사업기간 및 비용 예측을 통하여 사업주체간의 분쟁과 경제적 손실을 최소화 하고 성공적인 재건축사업의 추진에 기여할 수 있다.

실적공사비에 의한 지하철 공사비 예측모형에 관한 연구 (A Study on the Prediction-Formulas of Approximate Estimate Based on Actual Work Cost for Subway)

  • 박종혁;전영배;박홍태
    • 한국재난정보학회 논문집
    • /
    • 제9권1호
    • /
    • pp.11-21
    • /
    • 2013
  • 본 연구는 2004년 이후 도입된 실적 공사비 제도에 의하여 착공된 지하철 건설공사를 대상으로 실적공사비, 공사규모 그리고 시간을 고려하여 공사비를 예측하는 식을 제시하였다. 11개의 지하철공사 자료를 이용하여 지하철 공사비 예측을 위한 비용-규모 지수 n(신뢰범위:0.5~0.7)을 구한 결과, 총공사비 0.713, 순공사비 0.77로 도출되었다. 본 연구에서 제시한 공사비 예측 식 모델은 향후 지하철 공사 적용 현장의 사업기획, 예비조사, 타당성조사, 기본설계 단계에서 개산 공사비를 추정하는데 효과적으로 적용할 수 있을 것이다.

아파트의 가격형성 메커니즘에 관한 연구 (A Study on the Equilibrium-Pricing Mechanism of Apartment)

  • 정재영;윤태권
    • 한국건축시공학회지
    • /
    • 제8권6호
    • /
    • pp.65-74
    • /
    • 2008
  • The aim is to get comprehensive view point for the price of apartment. Apartment construction cost is the sun of land cost and building cost. Land price reflects the value of location where building stands. When the gap between price and affordability is narrow enough, effective demand promote apartment construction. The today's trends of rising price, which began in apartment housing, spreads to real estates market and finally overall consumer price. Problem is that price is decided only by supplier's interest. Equilibrium-pricing is common process in housing market. However it is important to review hedonic price and the factor of housing services and focused on the affordability of demanders. AHP analysis was used to study real needs and preference of demanders and dealt with 200 interviewees with brief checklists. We found that social factor is more important than building cost or site development. Especially location of apartment is most important to affect environment quality and accessibility to facilities.

A Probabilistic Fuzzy Logic Approach to Identify Productivity Factors in Indian Construction Projects

  • Princy, J. Darwin;Shanmugapriya, S.
    • Journal of Construction Engineering and Project Management
    • /
    • 제7권3호
    • /
    • pp.39-55
    • /
    • 2017
  • Preeminent performance of construction industry are unattainable with poor productivity resulting in time and cost over runs. Enhancement in productivity cannot be achieved without identifying and analyzing factors that adversely affect productivity. The objective therefore is to propose a productivity analysis model to quantify the probability of effect of factors influencing productivity by using fuzzy logic incorporated with relative importance index method, for various types of construction projects. To achieve this objective, a questionnaire survey was carried out targeting respondents of Indian construction industry, from four distinct projects, namely, residential, commercial, infrastructure and industrial projects. Based on questionnaire administered, the relative importance and ranks of factors demonstrated using relative importance index method. Probability assessment model to analyze productivity was then developed by using Fuzzy Logic Toolbox of MATLAB. The applicability of the proposed model was tested in seven construction projects and the probability of impact of factors on productivity evaluated. The results of application of model in the construction firms infers that the most contributing factor groups for most of the projects were discerned to be manpower, motivation and time group.

물가 변동에 따른 건설공사비 조정 제도의 개선 방안 - 델파이(Delphi) 설문 조사 결과를 중심으로 - (A Study on the Policies to improve the Escalating Regulations of Construction Price - With a Focus on Results of a Delphi Survey -)

  • 최민수
    • 한국건설관리학회논문집
    • /
    • 제5권6호
    • /
    • pp.203-211
    • /
    • 2004
  • 본 연구는 전문가를 대상으로 한 델파이(Delphi) 설문조사를 통하여 물가 변동에 따른 건설공사 계약 금액 조정(escalation) 제도의 문제점 및 개선 방안에 대하여 살펴본 결과이다. 조사 결과, 에스컬레이션의 요건이 되는 건설공사비의 등락률은 소비자 물가 변동률 혹은 건설 공사비 지수에 근거하여 결정하는 것이 바람직하며, 전문가의 의견을 보면, 총 공사금액의 $3\%$ 수준이 적정한 것으로 나타났다. 나아가 환율 및 국제 원자재 가격 등 단기적 충격 요인에 기인하는 자재 가격의 급등은 건설업체가 사전적으로 예측하여 대응하는 것이 어렵다. 따라서 단품슬라이드 제를 도입하여 특정 자재의 가격 급등에 대하여 에스컬레이션을 허용할 필요성이 있다. 등락률의 산정 방식으로는 지수조정률보다는 개별 공사의 특성을 정확하게 반영할 수 있는 품목조정률이 더 바람직한 것으로 평가되었다. 지수조정률이 합리적으로 기능하기 위하여는 품목별 공종별로 노임지수와 자재지수, 기계경비지수 등이 산출되어 발표될 필요성이 있다. 에스컬레이션의 기산일로서는 현행 법령에서는 계약 체결일로 규정되어 있으나, 계약 체결 이전부터 물가 변동이 발생한다는 점을 고려할 때, 입찰일로 규정하는것이 바람직하다.

지하철 콘크리트 BOX구조물의 내구성설계에 대한 연구 (A Study of Durability Design in the Subway Concrete Box Structure)

  • 권영찬;김은겸
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.940-956
    • /
    • 2004
  • In the course of studying the design of securing the 100-year-long durability of 100 years the subway structure according to the requested service by the Seoul Metropolitan Subway Construction Headquarters, we analyzed 14 construction sites adopting the durability design in subway line No. 9 and concluded as follows: 1. When comparing with 158, the environment index presented for securing 100-year-long durability of subway structure in subway line No. 9, the index of durability was verified as 159.7$\~$179.8 2. When examining the increase value of durability index, we verified that the constructors didn't make various choices in method but they employed the uniformly selected system. 3. Under consideration of the bid form, the construction under bid contract in bulk gave the impacts on the construction cost with attention to selection of the durability index, while the construction under alternative contract in bid adopted uniformly the standard presented by the ordering party.

  • PDF

국내 중규모 업무용 건물의 녹색건축인증 등급별 추가공사 비용 영향에 관한 연구 - G-SEED 2016-2 기준으로(2018년 9월 1일 시행) - (A Study on the Cost Impact of Additional Construction as Rating G-SEED Certification of Medium-Sized Office Buildings in Korea - Based on G-SEED 2016-2(Effective September 1, 2018) -)

  • 이두환;김재문
    • 대한건축학회논문집:구조계
    • /
    • 제35권10호
    • /
    • pp.225-234
    • /
    • 2019
  • The purpose of this paper is to analyze the additional construction cost of G-SEED certification for domestic office building reflecting the latest standard(G-SEED 2016-2), and to derive cost impact by category and level. Therefore, it is intended to provide quantitave cost data according to G-SEED certification at the planning phase of the project, estimate the additional construction cost per level according to G-SEED Certification of similar project to be carried out in the future, and encourage G-SEED certification by supporting the decision of the owners. Method: The Process and method of this study are summarized in five steps, 1) Review of previous research, 2) Selection of target project, 3) Scenario setting by level, 4) Additional construction cost for each evaluation category, 5) Extraction of additional construction cost ratio by level. Result: This paper analyzed the cost impact by deriving the additional construction cost of detailed category for level improvement according to the revised G-SEED certification(G-SEED 2016-2). In conclusion, an additional construction cost(ratio) of G-SEED projects to the reference building is drawn as good level; 157,426,241 KWN(+0.43%), very good level; 321,907,802 KWN(+0.88%), excellent level; 999,371,478 KWN(+2.74%), and outstanding level; 1,467,047,718 KWN(+4.02%).

Cost Normalization Framework for a Benchmarking System: A Case for Downstream and Chemical Construction Projects

  • Yin, Zhe;DeGezelle, Deborah;Pappas, Mike;Caldas, Carlos
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.590-598
    • /
    • 2022
  • Benchmarking is an important tool to assess the performance of capital projects in the construction industry. Incorporating cost-related metrics into a benchmarking system requires an effective cost normalization process to enable meaningful comparisons among projects that were executed at different locations and times. Projects in the downstream and chemicals sector have unique characteristics compared to other types of construction projects, they require a distinctive cost normalization framework to be developed to benchmark their absolute cost performance. The purpose of this study is to develop such a framework to be used for the case of benchmarking the downstream and chemical projects for their performance assessment. The research team started with a review of existing cost normalization methodologies adopted in benchmarking systems and conducted 7 interviews to identify the current cost normalization practices used by industrial professionals. A panel of 12 experts was then convened and it held 6 review sessions to accomplish the framework development. The cost normalization framework for benchmarking downstream and chemical projects was established as a three-step procedure and it adopts a 4-element cost breakdown structure to accommodate projects submitted by both owners and contractors. It also incorporated 5 published cost indexes that are compatible with downstream and chemical projects and they were embedded into 2 options to complete the normalization process. The framework was then pilot-tested on 4 completed projects to validate its functional practicality and the downstream and chemical use case in the benchmarking system.

  • PDF

로지스틱 회귀분석을 이용한 공동주택 발코니 확장 (Development of decision making index for balcony extension in apartment houses)

  • 이혜린;박민하;고용호;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 추계 학술논문 발표대회
    • /
    • pp.83-84
    • /
    • 2015
  • Remodeling of apartment houses has been increasing recently and residents have chosen to extend the balcony along with the legalization of balcony extension in apartment houses. Balcony extension provides residents more space, however, it has been investigated that balcony extension increases construction cost, heating and cooling cost and decreases sound insulation performance. Therefore, this study focuses on developing a decision making index for residents in remodeling required apartment houses. The suggested methodology involves surveying actual residents, survey analysis by AHP and decision model development using logistic regression analysis.

  • PDF