• 제목/요약/키워드: Construction Claims

검색결과 135건 처리시간 0.021초

분산형 물 인프라의 도시 하수관리 시스템 도입을 위한 기술적 발전방안 (Technical Advancements Needed for the Introduction of Distributed Water Infrastructure to Urban Wastewater Management Systems)

  • 최용주;이우람
    • 한국물환경학회지
    • /
    • 제39권1호
    • /
    • pp.76-86
    • /
    • 2023
  • We are on the verge of paradigm shift for the design and operation of our urban water systems from treatment- and efficiency-based to recirculation- and sustainability-based. One of the most frequently suggested alternatives to embody this paradigm shift is to decentralize the currently highly centralized urban water infrastructure. However, claims for water infrastructure decentralization are often criticized due to poor economic feasibility, unstable performance, and unprofessional operation and maintenance. The current study critically reviews the literature to discuss the technical advancement needs to overcome such challenges. Firstly, decentralized water infrastructure was briefly defined and the rationale for the proposal of its introduction to the next-generation urban water systems was laid down. The main discussion focused on the following water technologies, which require special attention when working with decentralized water infrastructure: i) material collection, storage, and transport; ii) easily scalable water treatment; iii) sensor, information, and communications; and iv) system optimization. The principles, current development status, and challenges were discussed for each of the water technologies. The discussion on the water technologies has enabled the identification of future research needs for their application to the next-generation urban water systems which will be designed following decentralized water infrastructure. This paper will significantly improve the current understanding on water infrastructure decentralization and provides insight on future direction of water technology development.

건설 현장 내 비점오염원 처리 시설의 제거 특성 평가 (Characteristics Evaluation of Non Point Source Treatment Facilities in Construction Site)

  • 최영화;정설화;김창용;김효상;오지현
    • 한국지반환경공학회 논문집
    • /
    • 제10권3호
    • /
    • pp.53-62
    • /
    • 2009
  • 본 연구는 건설 현장에서 발생하는 비점오염원 발생 특성에 대해서 파악하고, 이에 대한 관리 기술들을 적용하여, 각 시설별 효과에 대해 평가하고자 하였다. 건설 현장의 공사 단계별로 비점오염원의 발생 특성을 보면, 공사 초반 즉, 토양 피복 상태가 교란되어 있는 경우, 강우 시 부유물질 부하량이 높게 나타나며, 강우 강도에 대한 민감도가 공사 후반에 비해 높은 것으로 확인되었다. 건설 현장에서 가설 형식으로 적용할 수 있는 기술로는 부유물질을 제어할 수 있는 Check dam, Silt fence 공법과 강우 시 토사 유실을 원천적으로 제어하는 Geotextile공법을 적용한 결과, Geotextile이 다른 공법에 비해 비점오염원 유출량 제어에 효과적인 것으로 확인 되었다. Check dam과 Silt fence는 공극에 의한 부유물질 제거 기능이 일부 있으나, 전반적으로 일시적 저류에 의한 침강효과로 오염물질을 제거 하는 특징이 있다. 이러한 가설 형식 처리 시설의 경우, 처리 효율이 낮아 주변 민원 또는 수계 오염을 유발할 수 있으며, 이에 부가적으로 가압식 여과 방법을 통해 연계 처리한 결과 만족할 만한 방류 수질을 기대할 수 있었다. 또한, 이러한 여과 방법은 여과 속도와 유입 부하량에 따라 처리 가능한 부하량이 결정되며, 효과적 운전을 위해서는 전처리가 반드시 필요하다.

  • PDF

하도급대금 조정 관련 분쟁의 예방을 위한 법규 개선방안에 관한 연구 (A Study on Improvements of Regulation for the Preventing Commercial Disputes Related to Adjustment of Subcontract Price)

  • 민병욱;이종광;김용수
    • 한국건설관리학회논문집
    • /
    • 제6권1호
    • /
    • pp.186-194
    • /
    • 2005
  • 본 연구는 건설공사 하도급계약의 당사자인 수급인과 하수급인간의 하도급계약금액 조정과 관련하여 발생하는 원인을 검토하고, 분쟁을 예방하기 위한 하도급대금조정 관련 법규의 개선방안을 제시하는 것을 목적으로 한다. 본 연구는 문헌연구, 하도급계약 법규에 관한 구조와 맥락의 분석 그리고 설문조사의 방법에 의하여 진행되었으며, 주요한 연구결과는 다음과 같다. (1) 발주자와 수급인의 계약금액 조정이 이루어지는 경우 그 내용을 하수급인에게 통지하도록 하는 절차에 관한 조항을 하도급법과 건설표준하도급계약조건에 규정하여야 한다. (2) 하수급인이 하도급계약 내용의 변경 및 그에 수반되는 하도급대금 조정을 청구할 수 있도록 하는 절차를 건설표준하도 급계약조건에 규정하여야 한다. (3) 하도급대금 조정에 관한 기준을 명확히 하기 위하여 건설표준하도급계약조건에서 사용되고 있는 불확정 개념인 단가, 낙찰률 등 용어의 정의를 명확히 하였다. (4) 수급인의 귀책으로 인해 발생하는 연장비용의 부담은 수급인이 부담하도록 하여 부담의 주체를 명확히 하고 연장비용의 산정기준으로 재정 경제부 제정 실비산정규정을 적용하여야 한다.

Emergy-Simulation Based Building Retrofit

  • Hwang, Yi
    • KIEAE Journal
    • /
    • 제14권3호
    • /
    • pp.5-13
    • /
    • 2014
  • This paper introduces emergy(spelled with "m") that is a new environmental indicator in architecture, aiming to clarify conflicting claims of building design components in the process of energy-retrofit. Much of design practitioners' attention on low energy use in operational phases, may simply shift the lowered environmental impact within the building boundary to large consumption of energy in another area. Specifically, building energy reduction strategies without a holistic view starting from natural formation, may lead to the depletion of non-renewable geobiological sources (e.g. minerals, fossil fuels, etc.), which leaves a building with an isolated energy-efficient object. Therefore, to overcome the narrow outlook, this research discusses the total ecological impact of a building which embraces all process energy as well as environmental cost represented by emergy. A case study has been conducted to explore emergy-driven design work. In comparison with operational energy-driven scenarios, the results elucidate how energy and emergy-oriented decision-making bring about different design results, and quantify building components' emergy contribution in the end. An average-size ($101.9m^2$) single family house located in South Korea was sampled as a benchmark case, and the analysis of energy and material use was conducted for establishment of the baseline. Adoption of the small building is effective for the goal of study since this research intends to measure environmental impact according to variation of passive design elements (windows size, building orientation, wall materials) with new metric (emergy) regardless of mechanical systems. Performance simulations of operational energy were developed and analyzed separately from the calculation of emergy magnitudes in building construction, and then the total emergy demand of each proposed design was evaluated. Emergy synthesis results verify that the least operational energy scenario requires greater investment in indirect energy in construction, which clearly reveals that efficiency gains are likely to be overwhelmed by increment of material flows. This result places importance on consideration of indirect energy use underscoring necessity of emergy evaluation towards the environment-friendly building in broader sense.

농촌성과 도시성의 인식론적 이해 (Epistemological Understandings of Urbanism and Rurality)

  • 김정태;강동우;이성우
    • 농촌계획
    • /
    • 제15권3호
    • /
    • pp.47-60
    • /
    • 2009
  • The discussion of this paper is concerned with the epistemology of urbanism and rurality, that is, the justification of certain knowledge claims about how to intervene in understanding of urban and rural way of life and their implications to space. It is not concerned with the search for "truth" as such, but rather with the construction and presentation of knowledge as truth that subsequently lead to interpretation in the form of scholarly arguments. Rural areas vary considerably, and we define it as of a socially constructed category and so does urban as a comparative construction. As with community, rurality has been defined in widely different ways so has urbanism. In identifying and interconnecting these two concepts, we incorporate diverse western epistemologies such as empiricism and pragmatism. In addition, we heed particular attention to the intellectual history of Silhak, a philosophical ideology of Korea, to identify the relationships and it's effect on social way of life encompassing the realm of rural and urban spaces. We found that Silhak is particularly useful in that it deals with substantive issues of the relationship between rurality and urbanism arising from the discordance between values and perceive conditions of the rural and urban way of lives. This paper argues that the epistemology of Silhak is particularly superior to those of western ideologies since it accentuates unity of spaces rather than differentiating urban and rural way of life. We concludes with demanding more studies in the field of urban and rural analyses incorporating more diverse concepts of Korean orthodox epistemology.

턴키계약체결시 국제적 강행규정에 의한 준거법 제한에 관한 사례연구 - Clough Engineering Ltd v Oil & Natural Gas Corp Ltd 사건을 중심으로 - (A Case Study on the Limitations of the Choice of Law caused by Internationally Mandatory Rules in Entering into the Turn-Key Contracts)

  • 오원석;김용일
    • 무역상무연구
    • /
    • 제54권
    • /
    • pp.145-166
    • /
    • 2012
  • This article examines the limitations of the choice of law caused by Internationally Mandatory Rules in Entering into the Turn-Key Contracts. In June 2007, Clough Engineering, a corporation based in Western Australia, approached the Federal Court of Australia seeking injunctive relief and leave to commence proceedings against an entity located outside Australia, the Oil & Natural Gas Corp of India (ONGC). Clough had contracted with ONGC to provide a range of services in relation to the construction of gas and oil wells off the coast of India. The contract was governed by Indian law, and included a clause by which the parties agreed to submit their disputes to arbitration. Yet the Federal Court assumed jurisdiction over the dispute, principally because Clough had framed its claim as a plea for relief for contraventions of Australia's Trade Practices Act 1974. The result of this cases that it is possible for an arbitral tribunal to hear a claim made under the Trade Practices Act even if that claim arises "in connection with"a contract the proper law of which is not the law of Australia. However, in Transfield Philippines Inc v Pacific Hydro Ltd, the turnkey contract included a choice of law provision, selecting the law of the Philippines, and a clause providing that all disputes arising out of or in connection with the agreement were to be arbitrated under the ICC Rules, with the seat in Singapore. Hearings were in fact conducted in Melbourne, Australia, although all awards were published in Singapore. The result of this cases that it would not be appropriate for an Australian court to adjudicate claims for misrepresentation under Australian statutes dealing with misleading and deceptive conduct, once the arbitral tribunal had determined, applying appropriate choice of law rules, that such claims are governed by the law of the Philippines. To do so would lead to a multiplicity of proceedings, usurp the jurisdiction of the tribunal and deny the intention of the parties as expressed by them in the arbitration agreement. In short, the Internationally Mandatory Rules as an active part of public order create limitation of party autonomy in choice of law rules in a different way. The court is fully entitled to refuse to use those rules of law applicable on the contract which are in the contradiction to the internationally mandatory rules of law of the forum. And the court may give an effect to those Internationally Mandatory Rules that form a part of a law of foreign country when deciding about applicability of certain rules of applicable law.

  • PDF

그린 보증시스템을 위한 지식기반 퍼지로직 구축 (Construction of Fuzzy Logic Based on Knowledge for Greenery Warranty Systems)

  • 이상현;이상준;문경일
    • 한국컴퓨터정보학회논문지
    • /
    • 제16권3호
    • /
    • pp.17-25
    • /
    • 2011
  • 환경을 의미하는 녹색(Green)과 정보기술(IT)을 합성한 용어인 그린 IT는 에너지 절감과 탄소배출 감축을 목표로 IT 기술을 활용하고 있다. 그린 IT는 IT산업을 친환경화 하기 위한 범위를 벗어나서, 최근에는 IT를 활용한 타 산업분야의 그린화를 포함하여 기후변화 대응 방안으로까지 개념이 확장되고 있다. 전체 온실가스 배출량의 85%를 에너지 부문이 차지하고 있으며, 그 중에서도 수송부분이 20%를 차지하고 있는 만큼 자동차 산업 분야를 위한 IT의 연구가 필요한 시점이다. 본 논문에서는 자동차와 같이 보증 클레임이 빈번하게 발생되는 산업 분야의 온실가스 배출과 관련된 수명주기 분석을 제공하기 위하여 지식 기반 퍼지 로직을 이용한다. 온실가스 배출 관련 자동차 배기 시스템에 대한 보증 전문가 지식, 과거 오작동 테스트 결과, 과거 현장 분석 및 보증 데이터를 이용한 보증 클레임 분석 방법을 제안하였다. 또한, 수명 지식 기반의 GWS(Greenery Warranty System)를 제안하였다. 지식기반 퍼지 로직을 직접 구현하여, 실무에 적용함으로써 친환경 자동차 산업에 IT의 적용성을 증명하였다.

Approval status and characteristics of work-related musculoskeletal disorders among Korean workers in 2020

  • Eun-woo Cha;Sae-mi Jung;Il-ho Lee;Dae Hwan Kim;Eui Hyek Choi;In-ah Kim;Yong-kyu Kim;Kyung-joon Lee;Yang Won Kang;Ho-gil Kim;Young-ki Kim
    • Annals of Occupational and Environmental Medicine
    • /
    • 제34권
    • /
    • pp.31.1-31.14
    • /
    • 2022
  • Background: This study aimed to investigate the characteristics of work-related musculoskeletal disorders (WRMSDs) in occupational disease claims and identify patterns of WRMSDs for each body part by industry and occupation. Methods: This study analyzed the raw data of occupational disease claims for musculoskeletal disorders deliberated by the Occupational Disease Decision Committee of the Korea Workers' Compensation & Welfare Service in 2020. The data was classified into 6 body parts with the highest numbers of occupational disease cases by using the complete enumeration data on principal diagnoses and 4 types of subdiagnoses in the raw data. The characteristics and approval rates of WRMSDs by body part, industry and occupation were examined and summarized. Results: A total of 13,015 occupational disease cases for WRMSDs were classified, and lumbar spinal (back) diseases accounted for the largest proportion of claimed diseases, followed by shoulder, elbow, wrist, knee, and neck diseases in a descending order. The occupations with the highest and second highest numbers of occupational disease cases by body part were found to be automobile assemblers and production-related elementary workers for the neck, school meal service workers and cooks for the back, construction frame mold carpenters and school meal service workers for the shoulder, elementary workers in mining and food service workers for the elbow, food service workers and automobile parts assemblers for the wrist, and ship welders and school meal service workers for the knee. Conclusions: This study examined the characteristics and approval status of WRMSDs by body part and occupation. Based on the study results, management strategies for the prevention of WRMSDs should be established regarding occupations with a high risk of WRMSDs for each body part.

성공적 해외건설사업을 위한 입찰단계의 리스크 관리 프로세스 모델 개발 - 발전 플랜트 EPC 사업을 중심으로 - (The Development of Risk Management Process Model during Bidding Phase for Success of Oversea Construction Projects)

  • 서재필;류한국;손보식;최윤기
    • 한국건설관리학회논문집
    • /
    • 제17권4호
    • /
    • pp.76-86
    • /
    • 2016
  • 2014년까지 지속적인 증가세를 보이던 해외건설사업 수주가 2015년에는 하향세가 뚜렷한 모습을 보이고 사업 운영 실적도 감소했다. 이러한 추세의 이유로 저가수주, 사업관리 Know-How 부족과 부실한 사업관리, 클레임 관리 능력 부실 등 여러 이유를 찾을 수 있다. 이에 수주 질적 향상의 필요성이 대두 되고 있다. 반복되는 실패에 대한 교훈을 삼고 입찰과정에서 기술, 상업, 계약적인 사항을 면밀히 검토하고, 사업 초입 단계에서 입찰 업무 시스템의 체계화가 필요하다. 또 사업지역 정보력 등 영업적인 측면의 경쟁력도 키운다면 질 높은 입찰을 제안함으로써 성공적인 사업으로 이끌어 낼 수 있을 것이다. 입찰 기술 고급화 전력이 해외건설사업의 리스크와 원가율, 추후 사업 확장 등 여타 전략적 측면에서 사업 성공의 열쇠(Key)가 되고 있다. 본 연구는 입찰 업무 프로세스 분석과 입찰업무 단계의 핵심성공인자(Critical Success Factor)를 도출하고 업무상의 리스크(Risk)인자를 찾아 핵심성공요인과 연계하여 종합적으로 관리함으로써 리스크 수준을 낮출 수 있는 프로세스 모델을 제시하고자 하는데 목적이 있다.

공공건설공사 설계변경에 따른 손실 추정에 관한 기초연구 (A Study on the Estimation of Change Orders Impact for the Public Construction)

  • 이민재;박범진;임건순
    • 대한토목학회논문집
    • /
    • 제28권3D호
    • /
    • pp.363-369
    • /
    • 2008
  • 건설공사의 특성상 공사중 설계변경이 불가피한 경우가 많다. 문제는 설계변경의 양과 정도에 따라 작업생산성 저하를 초래 할 수 있다는 것인데, 이를 설계변경의 파급효과(Ripple effect) 또는 누적영향(Cumulative impact)이라 한다. 미국과 달리 국내의 경우 설계변경의 영향에 대한 연구를 찾아보기 힘든 것이 사실이다. 본 연구는 공공공사 설계변경의 현황과 그 영향을 조사하기 위하여 1991년도부터 2004년도까지 수행된 14개 공공기관의 공사비 100억 이상 공사 1439건의 설계변경 데이터를 수집, 분석하였다. 국내 공공공사 설계변경의 특성을 파악하기 위하여 평균낙찰률, 설계변경규모, 설계변경횟수, 설계변경금액 등을 분석하였으며, 설계변경이 미치는 영향을 파악하기 위하여 변경률(%CO), 손실률(%Delta), 지연률(%T) 등의 개념을 정립하였다. 개발된 변경률, 손실률, 지연률 등의 개념을 수집된 설계변경 자료에 적용 사례조사를 하였으며, 이를 바탕으로 낙찰률과 설계변경량의 관계, 설계변경횟수와 공사지연간의 관계, 공기지연과 손실률간의 관계, 설계변경량과 손실률간의 관계를 도출하였다. 결과적으로 설계변경횟수가 많아질수록 공기가 더욱 지연될 수 있으며, 지연된 공기는 더 많은 손실을 발생시킬 수 있음이 증명 되였다. 또한 설계변경의 양이 많아질수록 손실량도 증가하며 서로간 강한 상관관계가 있음을 발견하였다. 본 연구에서 도출된 관계식들은 공사금액을 바탕으로 개발되었기에 프로젝트의 생산성손실 분석을 위한 직접적인 적용은 어렵다. 하지만 향후 국내 주요건설사들이 추진하고 있는 작업일보시스템에 작업시간(Man-hour)기반의 생산성 자료들이 축척되면 추후 그 데이터를 바탕으로 국내 환경에 적합한 생산성측정모델 구축이 가능하리라 판단된다. 아울러, 공사중 작업생산성 관련 자료의 관리를 선진화 하고, 그 신빙성을 높이는 일은 우리 건설계 모두의 노력이 필요하리라 사료된다.