• Title/Summary/Keyword: Construction Breakdown Structure

Search Result 153, Processing Time 0.022 seconds

A Development of Work Breakdown Structure and Link to Standard Estimation System for 3D Printing Building (건축물 3D 프린팅 공종분류체계 도출 및 표준품셈 연계방안 제시)

  • Ju, Ki-Beom;Seo, Myoung-Bae;Park, Hyung-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.702-708
    • /
    • 2018
  • 3D printing technology is attracting increasing attention as a key technology of the fourth industrial revolution that can change the production paradigm of existing industries. The introduction of construction 3D printing technology has been slower than other industries because of the characteristics of the construction field. On the other hand construction automation using 3D printing is required to reduce the production population, as well as improve productivity and safety. In this study, a construction 3D printing work breakdown structure and link method to a standard estimation system were developed as a preliminary preparation for introducing 3D printing to construction. Based on expert consultation on construction and 3D printing, a hypothetical scenario was developed based on existing construction 3D printing technology. According to the scenario, 16 kinds of works required for 3D printing construction work were derived. The existing work breakdown structure and standard estimation system were analyzed, and the 3D printing work was linked. 3D printing works that were the same as the existing breakdown structure were found, and non-existent works were added to the similar breakdown structure. These results are expected to be helpful for future 3D printing construction management and cost estimation. The actual standard estimation system through 3D printing work will need to be calculated.

The Development of Urban Metro Maintenance Facility System Using Construction Classification System Management (공종분류체계를 활용한 도시철도 시설물 유지관리시스템 개발)

  • Hyun, Ji-Hun;Yang, Byong-Soo;Moon, Sung-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.69-77
    • /
    • 2012
  • The construction data should be controlled from the life-cycle perspective. The current PMIS (Project Management Information System) usually focuses on the construction operation stage. The PMIS does consider the utilization of the construction in the maintenance of constructed facilities. This paper tries to interface the construction data with the maintenance data for effective use of construction data in the life-cycle perspective. To achieve the research objective, a maintenance breakdown structure is established and connected to the work breakdown structures. The connection of the two breakdown structures provide a structured utilization of construction data for efficient maintenance work activities. A prototype suggests that the interface of maintenance and work breakdown structures can help provide a construction and maintenance data in a more efficient way for maintenance activities.

Breakdown Structures for Physical Asset Management in Built Environment (건설 산업의 시설물 자산관리를 위한 분류체계 역량)

  • Gebremichael, Dagem Derese;Moon, Kyeongpil;Lee, Yunsub;Jung, Youngsoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.305-306
    • /
    • 2021
  • Breakdown structure (BS) is a tool used to allocate information packages for various management functions and drive computerized information systems. Although several BS exists, work breakdown structures (WBS) and cost breakdown structures (CBS) are the most widely studied and used in previous literature. Nevertheless, heterogeneity of BS and respective management capabilities in current practices are not adequately addressed. In this context, this paper compared the management capabilities of various BS in both building and plant industries through systematic literature. Management requirements and applications scope, in terms of life cycle and stakeholder, were analyzed, respectively. Finally, finding and lesson-learned are outlined.

  • PDF

Analysis on the Problems of Construction Temporary Work through Review on Technology System

  • Park, Junmo;Kim, Okkyue;Kim, Jinlee;Lim, NamGi
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.716-717
    • /
    • 2015
  • A construction temporary work is main process and importance trade section. A technology system of construction temporary has very low availability of field works and needs improvements in Korea as construction site has a quick response about new requirements. This study reviews literature researches and can verify that changes to a comprehensive technology system for construction site. In addition, it suggests a breakdown structure of new standards for temporary construction technology based on views of construction site managers. Meanwhile, temporary construction technology in Korea has changed with a specification of construction temporary work which had been revised in 2014. However, the revision is merely dividing the design and building off of construction temporary technology. It is lacking in many ways to change this in a new standard system for temporary construction technology. Henceforth, it needs to develop a standard system for temporary construction technology and a professional system that is appropriate for different purposes by detail trade sections.

  • PDF

A STUDY ON THE LIFE CYCLE COST ANALYSIS IN LIGHT RAIL TRANSIT BRIDGES: FOCUSED ON SUPERSTRUCTURE

  • Lee Du-heon;Kim Kyoon-tai;Kim Hyun Bae;Jun Jin-taek;Han Choong-hee
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.30-40
    • /
    • 2007
  • The demand for light-rail construction projects has recently been increasing, and they are mostly supervised by private construction companies. Therefore, a private construction company that aim to raise gains from the operation of the facilities during the contract period greater than what they invested should b able to accurately calculate the costs from the aspect of Life Cycle Cost (LCC). In particular, a light-rail transit bridge that has a heavier portion from the aspect of the cost of light-rail transit construction requires a more accurate calculation method than the conventional LCC calculation method. For this, an LCC analysis model was developed and a cost breakdown structure was suggested based on literature review. The construction costs by shape of the upper part of a light-rail transit were calculated based on the cost breakdown system presented in this paper, and the cost generation cycle and cost unit price were collected and analyzed based on records on maintenance costs, rehabilitation and replacement. In addition, after forming some hypotheses in order to perform the LCC analysis, economic evaluation was conducted from the aspect of the LCC by using performance data by item.

  • PDF

EBS for BIM based maintenance management of Thermal Power Plant (BIM기반 화력발전시설 유지관리를 위한 EBS(Elements Breakdown Structure)개발)

  • Kim, Chang-Soo;Cha, Sang-Hoon;Ji, Soung-Min
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.81-82
    • /
    • 2015
  • BIM has been a reliable construction project management tool to handle various kinds of construction information generated in the facility life cycle. To take these advantages, researchers have been promoted numerous studies in a residential, a commercial, and an educational facilities with a large number of on-going projects. However, despite running as the role of essential energy supplier, power plant related BIM research is relatively insufficient than others. In particular, due to the extending of the facility service period and the requirement of the complicated construction project management for 'overhaul' and 'repowering' in the power plant maintenance phase, the needs for using BIM have been increased gradually. For using BIM based maintenance, it is needed to consider an information collecting methods and necessary to develop an appropriate breakdown structure to share information. Therefore, 'EBS' is produced by reviewing the previous research related to BIM and analyzing the repair activities in the maintenance phase. Proposed 'EBS' must be useful not only a judgment between capital expenditure versus revenue expenditure but also appropriate maintenance strategies development for property management.

  • PDF

PBS Construction by Using DSM (DSM을 이용한 PBS 구출)

  • Kim, Chan-Mook;Park, Young-Won
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.1
    • /
    • pp.26-32
    • /
    • 2008
  • This paper discusses WBS (Work Breakdown Structure) that is known for technique of basic project management. The WBS use in domestic industries often exhibit errors in Its structure. The most common serious error is space-oriented breakdown structure of PBS (Product Breakdown Structure) that becomes the core element of the WBS. This paper proposes a method to correct the problem of space-oriented breakdown structure constructed in domestic railroad industry. DSM method was adopted to construct PBS containing function-oriented structure. The proposed process and method will contribute to minimize time that take to construct an accurate and useful PBS.

Establishment of WBS·CBS-based Construction Information Classification System for Efficient Construction Cost Analysis and Prediction of High-tech Facilities (하이테크 공장의 효율적 건설 사업비 분석 및 예측을 위한 WBS·CBS 기반 건설정보 분류체계 구축)

  • Choi, Seong Hoon;Kim, Jinchul;Kwon, Soonwook
    • The Journal of the Korea Contents Association
    • /
    • v.21 no.8
    • /
    • pp.356-366
    • /
    • 2021
  • The high-tech industry, a leader in the national economy, has a larger investment cost compared to general buildings, a shorter construction period, and requires continuous investment. Therefore, accurate construction cost prediction and quick decision-making are important factors for efficient cost and process management. Overseas, the construction information classification system has been standardized since 1980 and has been continuously developed, improving construction productivity by systematically collecting and utilizing project life cycle information. At domestic construction sites, attempts have been made to standardize the classification system of construction information, but it is difficult to achieve continuous standardization and systematization due to the absence of a standardization body and differences in cost and process management methods for each construction company. Particular, in the case of the high-tech industry, the standardization and systematization level of the construction information classification system for high-tech facility construction is very low due to problems such as large scale, numerous types of work, complex construction and security. Therefore, the purpose of this study is to construct a construction information classification system suitable for high-tech facility construction through collection, classification, and analysis of related project data constructed in Korea. Based on the WBS (Work Breakdown Structure) and CBS (Cost Breakdown Structure) classified and analyzed through this study, a code system through hierarchical classification was proposed, and the cost model of buildings by linking WBS and CBS was three-dimensionalized and the utilized method was presented. Through this, an information classification system based on inter-relationships can be developed beyond the one-way tree structure, which is a general construction information classification system, and effects such as shortening of construction period and cost reduction will be maximized.

Risk Analysis in Tender Stage for Successful Construction Project in China (중국건설시장에서의 성공적인 발주를 위한 입찰단계 리스크 분석)

  • Liu, Yue-Fei;Oh, Jae-Hun;Huh, Young-ki
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.140-141
    • /
    • 2015
  • Although the depression of oversea construction market becomes more serious recent years, asian construction market is relatively dynamic, particularly in china. However, few research has been conducted about how to manage construction projects in china as foreign developers. Four important risks are identified from series of surveys using the WBS-RBS method, the result shows that the main risk of tender stage is 'Tender max price error', ' Bill of quantities error', 'Unusual low price' and 'Moral risk' respectively.

  • PDF

Work Breakdown Structure(WBS) based on the Steel Box Girder Production Process Model (강교량 제작 프로세스 모델을 기반으로한 WBS구축)

  • Ha, Seung-Ho;Kim, Seok;Kim, Kyoung-Min;Park, Chan-Hyuk;Kim, Kyong-Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.521-525
    • /
    • 2004
  • The objective of this study is to implement a WBS (Work Breakdown Structure) so as to support efficient information management through the construction process of Steel Box Girder Bridge. To meet this requirement. This study performs the analysis of the business process. Through the work, information flows and information management levels are identified. Information management in each manufacturing process was various in its level. For the efficient information management, skating and utilization in schedule, cost, resource, and quality management, it is recommended to utilize a WBS composed of major work section and element structure of the steel box girder.

  • PDF