PBS Construction by Using DSM  

Kim, Chan-Mook (아주대학교 시스템공학과)
Park, Young-Won (아주대학교 시스템공학과)
Publication Information
Journal of the Korean Society for Railway / v.11, no.1, 2008 , pp. 26-32 More about this Journal
Abstract
This paper discusses WBS (Work Breakdown Structure) that is known for technique of basic project management. The WBS use in domestic industries often exhibit errors in Its structure. The most common serious error is space-oriented breakdown structure of PBS (Product Breakdown Structure) that becomes the core element of the WBS. This paper proposes a method to correct the problem of space-oriented breakdown structure constructed in domestic railroad industry. DSM method was adopted to construct PBS containing function-oriented structure. The proposed process and method will contribute to minimize time that take to construct an accurate and useful PBS.
Keywords
WBS; PBS; DSM;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Thomas Udo Pimmler (1994). "A development methodology for product decomposition and integration", Massachusetts Institute of Technology, May, pp.17
2 Travis P.Dunn (2005). "Using Design Structure Matrices to Improve Decentralized Urban Transportation Systems", Massachusetts Institute of Technology, August, pp.5-7
3 Tyson R. Browning (2001). "Applying the design structure matrix to system decomposition and integration problems: a review and new directions", IEEE Transactions on Engineering Management, Vol.48, No.48, August, pp.299-304
4 Tyson R. Browning (2001). "Process integration using the design structure matrix", Systems Engineering. Vol.5, No.3, pp.180-193   DOI   ScienceOn
5 DoD (1998). MIL-HDBK-881, "Department of Defense Handbook, Work Breakdown Structure", DoD, January, pp.1-65