• Title/Summary/Keyword: Construction Activity

Search Result 923, Processing Time 0.025 seconds

Distribution of Occupational Safety and Health Management Costs (OSHMC) by Project Size and Activity Type with the Consideration of Accident Rates (공사규모 및 공종별 위험도에 따른 산업안전보건관리비 차등 분배 방안에 관한 연구)

  • Jeong, Hoyun;Chae, Jeonghyeun;Kang, Youngcheol
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.4
    • /
    • pp.44-51
    • /
    • 2023
  • Occupational safety and health management cost (OSHMC) is helpful for managing safety in construction sites. However, OSHMC has been criticized for various aspects, including the fact that OSHMC cannot reflect features of individual constructions when counting up and executing OSHMC. This study proposes the approach to distribute OSHMC by project size and activity type with the consideration of accident rates for various activities. Using 1,046 data obtained from Construction Safety Management Integrated Information (CSI), this study calculated the relative risk factors for each activity. The distribution of OSHMC is proposed based on the risk factors. The results were validated by industry expert interviews. The distribution proposed in this study will help construction managers establish and execute OSHMC usage plan effectively.

A Stochastic Simulation Model for Estimating Activity Duration of Super-tall Building Project

  • Minhyuk Jung;Hyun-soo Lea;Moonseo Park;Bogyeong Lee
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.397-402
    • /
    • 2013
  • In super-tall building construction projects, schedule risk factors which vertically change and are not found in the low and middle-rise building construction influence duration of a project by vertical attribute; and it makes hard to estimate activity or overall duration of a construction project. However, the existing duration estimating methods, that are based on quantity and productivity assuming activities of the same work item have the same risk and duration regardless of operation space, are not able to consider the schedule risk factors which change by the altitude of operation space. Therefore, in order to advance accuracy of duration estimation of super-tall building projects, the degree of changes of these risk factors according to altitude should be analyzed and incorporated into a duration estimating method. This research proposes a simulation model using Monte Carlo method for estimating activity duration incorporating schedule risk factors by weather conditions in a super-tall building. The research process is as follows. Firstly, the schedule risk factors in super-tall building are identified through literature and expert reviews, and occurrence of non-working days at high altitude by weather condition is identified as one of the critical schedule risk factors. Secondly, a calculating method of the vertical distributions of the weather factors such as temperature and wind speed is analyzed through literature reviews. Then, a probability distribution of the weather factors is developed using the weather database of the past decade. Thirdly, a simulation model and algorithms for estimating non-working days and duration of each activity is developed using Monte-Carlo method. Finally, sensitivity analysis and a case study are carried out for the validation of the proposed model.

  • PDF

A Study on Proposal to improve Domestic Construction Management Service Guide (국내 건설사업관리 업무지침의 개선(안)에 관한 연구)

  • Na, Kwang-Tae;Ryoo, Boong-Yeol;Kang, Byeung-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.3
    • /
    • pp.147-154
    • /
    • 2002
  • The Korean government makes an effort to raise the competitive power of nation through CM activation in the construction industry. Since the first CM service was applied to the atomic power plant project in 1986, the number of CM contracts are continuously being increased and will be up to 20% by 2002 in public sector. However, the public projects had been executed without any procedure manual or standard guideline of CM services. Meanwhile the Ministry of Construction and Transportation issued $\ulcorner$CM Service Guide$\lrcorner$, but the guide shows an indefinite description in the responsibility, authority and scope of activity for the project participants. Therefore, it is required the procedures be improved and scope of activities be established for the project participants. This study was generated from the comparative analysis of $\ulcorner$Standard CM Services and Practice$\lrcorner$ Published by CMAA and domestic $\ulcorner$CM Service Guide$\lrcorner$ and the case of Incheon International Airport construction. The purpose of this study is to provide the fundamental data for an improvement in the procedures of project execution and the construction manager's activities/rolls shown on $\ulcorner$CM Service Guide$\lrcorner$

A HAZARDOUS AREA IDENTIFICATION MODEL USING AUTOMATED DATA COLLECTION (ADC) BASED ON BUILDING INFORMATION MODELLING (BIM)

  • Hyunsoo Kim;Hyun-Soo Lee;Moonseo Park;Sungjoo Hwang
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.17-22
    • /
    • 2011
  • A considerable number of construction disasters occur on pathways. Safety management is usually performed on construction sites to prevent accidents in activity areas. This means that the safety management level of hazards on pathways is relatively minimized. Many researchers have noted that hazard identification is fundamental to safety management. Thus, algorithms for helping safety managers to identify hazardous areas are developed using automated data collection technology. These algorithms primarily search for potential hazardous areas by comparing workers' location logs based on a real-time location system and optimal routes based on BIM. Potential hazardous areas are filtered by identified hazardous areas and activity areas. After that, safety managers are provided with information about potential hazardous areas and can establish proper safety countermeasures. This can help to improve safety on construction sites.

  • PDF

A method for discrete event simulation and building information modelling integration using a game engine

  • Sandoval, Carlos A. Osorio;Tizani, Walid;Koch, Christian
    • Advances in Computational Design
    • /
    • v.3 no.4
    • /
    • pp.405-418
    • /
    • 2018
  • Building Information Modelling (BIM) and Discrete Event Simulation (DES) are tools widely used in the context of the construction industry. While BIM is used to represent the physical and functional characteristics of a facility, DES models are used to represent its construction process. Integrating both is beneficial to those interested in the field of construction management since it has many potential applications. Game engines provide a human navigable 3D virtual environment in which the integrated BIM and DES models can be visualised and interacted with. This paper reports the experience obtained while developing a simulator prototype which integrates a BIM and a DES model of a single construction activity within a commercial game engine. The simulator prototype allows the user to visualise how the duration of the construction activity is affected by different input parameters interactively. It provides an environment to conduct DES studies using the user's own BIM models. This approach could increase the use of DES technologies in the context of construction management and engineering outside the research community. The presented work is the first step towards the development of a serious game for construction management education and was carried out to determine the suitable IT tools for its development.

Study on Development of Construction Management Module based on Risk factor classification system at Construction Phase (시공단계 위험요소 분류체계 구축을 통한 건설 프로젝트 관리모듈 개발에 관한 연구)

  • Lee, Joo-Sung;Moon, Sung-Kon;Jun, Yeong-Jin;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.199-202
    • /
    • 2009
  • Turn-key and CMF(CM for Fee) have been selected as procurement paths of large public projects in Korea. However, recently, researches and discussions on CMR(CM at Risk) have been popular as the Korean government seeks for alternative procurement paths to enhance the performance. In the CMR projects, the part who is responsible for construction management should predict and control the potential risks for guaranteeing benefits. In this research, CMR projects in which a general contractor plays the role as CMr is mainly analyzed. We give attentions to risk management during construction process given that subcontractors, main parts in this phase, work in various ways and thus more chances for faults exist. In this case, CMr manages risks to control the procedure of project. So, potential risk factors can constitute the database, and that database can be matched to following activity. And construction manager can forecast measures of risk using the result of matching. This chain of activities increase efficiency in roles of CMr on CMR(CM at Risk). Furthermore this study will propose one of the solution of Construction Management Module.

  • PDF

STOCHASTIC SCHEDULING CONSIDERING INTERDEPENDENT ACTIVITY DURATIONS

  • I-Tung Yang
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.791-795
    • /
    • 2005
  • A simulation model is proposed to evaluate the effect of correlations between activity durations on the overall project duration. The proposed model incorporates NORTA, a recent developed statistical method, into the simulation process to allow arbitrarily specified marginal distributions for activity durations and any desired correlation structure. The generality is of practical value when systematic data is not available and planners have to rely on arbitrary experts' estimation, which may involve a mixed situation when some activity durations are continuously distributed whereas others are discrete outcomes. The proposed model is validated by showing that the correlation coefficients of the simulation results are close to the originally specified ones. The simulation results are compared to two conventional approaches: PERT and simulation without correlation. The comparisons illustrate that the proposed model can provide important management information, which would otherwise be distorted due to the neglect of the correlations between activity durations.

  • PDF

Estimation of Factors Influencing Airborne Fiber Concentrations through an Observation Survey of Asbestos-containing Materials in Buildings (석면함유 건축물의 관찰조사를 통한 실내공기 중 섬유 농도 변화 요인 추정)

  • Lee, Seungchul;Kim, Boowook;Yi, Gwang Yong;Shin, Yong Chul
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.25 no.2
    • /
    • pp.174-183
    • /
    • 2015
  • Objectives: The objective of this study is the estimation of factors influencing airborne fiber concentrations by means of an observation survey of asbestos-containing materials in buildings. Methods: Forty-five samples were collected from four commercial buildings by NIOSH Method 7400 and classified according to current condition, potential activity, construction year, and operations and maintenance(O&M). Results: Airborne fiber concentrations by current condition(classified as good, fair and poor) were significantly different(p<0.05). Concentrations by potential activity were significantly different among groups(p<0.05), and those from the low activity group were higher than those from the middle activity group. Based on construction year, airborne fiber concentrations from the decade of the 1990's were higher than those from the 1960's. When O&M status was considered, airborne fiber concentrations from 1960's buildings were lower than those buildings not operated and maintained(p<0.01), because dust generation was influenced by O&M status. It was found that airborne fiber concentrations were related to current condition and potential activity via regression analysis, but the coefficient of determination was low. Also, correlation analysis showed that the higher the potential activity, the more current condition is worsened, but the relationship was not significant(r=-0.455, p>0.05). Conclusions: Airborne fiber concentrations in asbestos-containing buildings had weak relationships with current condition and potential activity.

A Study on the Progress Measurement Method using Percent Complete of Work and Labor Productivity - Focusing on Structural Works of Apartment Construction - (단위작업 물량 달성율과 투입 노무량을 이용한 진도율 산정방법에 관한 연구 - 공동주택공사의 골조공사를 중심으로 -)

  • Choi Hyun-Ha;Lee Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.212-219
    • /
    • 2005
  • Time management is important in construction management Especially, in the high-rise apartment housing projects, it is very important to expedite the construction progress in order to meet the planned schedule. The objective of this paper is to propose the baseline for the progress rate using work volume and man $\cdot$ hours performed at work activity level. The work volume far each activity is transformed to the weighted value compared to total work volume for the floor Therefore, a progress rate for an activity is calculated by multiplying a weighted value and work volume. A progress rate for a floor and a building can calculated in this manner, respectively.

Development and Application of Learning Materials of the Construction Unit in 7-B Grade Based on Clairaut's $El{\`{e}}ments$ de $G{\`{e}}om{\`{e}}trie$ (Clairaut의 <기하학 원론>에 근거한 7-나 단계 작도단원의 자료 개발과 적용에 관한 연구)

  • Park, Myeong-Hee;Shin, Kyung-Hee
    • Journal for History of Mathematics
    • /
    • v.19 no.4
    • /
    • pp.117-132
    • /
    • 2006
  • For a meaningful learning of the Construction Unit in 7-B Grade, this study aims to develop teaming materials on the basis of Clairaut's $El{\`{e}}ments$ de $G{\`{e}}om{\`{e}}trie$, which is grounded on a natural generation derived from the history of mathematics and emphasizes students' inquiry activity and reflective thinking activity, and to analyze the characteristics of learning process shown in classes which use the application of teaming materials. Six students were sampled by gender and performance and an interpretive case study was conducted. Construction was specified so as to be consciously executed with emphasis on an analysis to enable one to discover construction techniques for oneself from a standpoint of problem solving, a justification to reveal the validity of construction, and a step of reflection to generalize the results of construction.

  • PDF