• 제목/요약/키워드: Construction Activity

검색결과 923건 처리시간 0.028초

벽식(壁式) 아파트의 택트공정(工程)계획의 성공요인 분석에 관(關)한 연구(硏究) (The Success Factors of Scheduling Using the TACT Technique in Wall Type Apartment House Construction)

  • 김준호;김광희;조형근
    • 한국건축시공학회지
    • /
    • 제6권1호
    • /
    • pp.79-86
    • /
    • 2006
  • Recently, the construction companies show lots of interest in reducing the construction duration of apartment housing project in Korea. Therefore, the purpose of this study is to investigate the success factors of scheduling using the TACT technique in wall type apartment house construction for managing the construction schedule effectively. For appling the tact scheduling technique to wall type apartment house construction, the success factors can be summarized as follows : (1) zoning the horizontal and vortical work area properly, (2) preparing the flow chart of finishing works, (3) minimizing the undefined activity like chipping off the concrete wall, (4) reordering the construction activities for keeping up the continuity of works in winter season, (5) dividing the amount of work for minimizing the delay time of any activity, etc.

건설현장 안전관리 성공요인 분석을 통한 안전관리활동 개선방안 (A Safety Management Activity Improvement in Construction Sites through Analysis of Success Factors)

  • 홍정석;배대권;김재준
    • 한국건설관리학회논문집
    • /
    • 제6권5호
    • /
    • pp.148-156
    • /
    • 2005
  • 본 연구에서는 건설현장의 안전관리 관련 선행연구 고찰을 통해, 현행 건설현장의 안전관리체계를 구성하고 있는 기본 구성 요소를 파악하고 이러한 선행연구들이 제시한 주요항목을 건설현장 안전관리활동에 반영하는 것이다. 선행연구의 분석을 통해 1)본사는 안전보건경영체제 중심으로, 건설현장은 근로자를 배려하는 활동 위주의 체계가 중요함 2)성공적으로 안전관리 활동을 추진한 건설현장에 대한 실제 안전관리활동 주요요인들을 건설현장 안전관리활동의 실천방안으로 일반화 시키지 못하는 한계점이 있었다. 이러한 한계점을 해결하기 위하여 본 연구에서는 기존 선행연구에서 주장하고 있는 건설현장의 성공요인 분석과 국내의 27개 안전관리활동 우수사례 현장에 대한사례조사를 통해 건설현장의 안전관리활동 주요요인(위험성 관리방법, 산업안전보건위원회 운영, 안전교육의 실시, 안전점검, 작업장 환경개선, 안전활동)을 도출하였고, 도출된 6가지 주요요인에 대한 실천방안을 제시하였다.

세부 공정별 CO2 배출 분석 및 환경비용 원가배분을 위한 Activity-based LCA 모델의 도입 - 커튼월 공사를 중심으로 - (Implementing Activity-based LCA Model for Carbon Dioxide Emission Analysis and Allocation of Environment Cost)

  • 임지연;이준성;신승우;손정욱
    • 한국건설관리학회논문집
    • /
    • 제13권4호
    • /
    • pp.78-88
    • /
    • 2012
  • 지구 온난화의 주범인 온실가스 배출량을 규제하고자 하는 전 세계적인 기조에 따라 건설 분야에서도 이와 관련하여 다양한 노력이 시도되고 있다. 그 일례로 LCA (Life cycle Assessment) 방법론 도입을 통해 $CO_2$ 배출량을 정량적으로 측정하려는 연구가 활발하게 수행되고 있다. 그러나 일반 제조업에서 수행되고 있는 기존의 LCA 방법론은 다양한 자재의 투입과 복잡한 생산구조를 가지고 있는 건설업에 활용되기에는 많은 한계가 있다. 이에 본 연구는 보다 정확하고 세분화된 환경영향 평가를 도출할 수 있도록, 기존 LCA 방법론에 ABC원가관리방식을 도입한 Activity-based LCA 모델을 제안하였다. 이를 기반으로 대표적 온실가스인 $CO_2$의 주요 배출 Activity와 각각 배출량에 대한 정확한 예측이 가능하도록 하는 모델을 제시하였으며, 실제 시공 중인 건물의 커튼월 시스템 공정을 대상으로 하여 그 유용성을 검증하였다.

학교시설 건설공사의 작업분류체계 구축 및 단위작업별 선후행 관계 분석 (Development of Work Breakdown Structure and Analysis of Precedence Relations by Activity in School Facilities Construction Work)

  • 방종대;손정락
    • 토지주택연구
    • /
    • 제8권3호
    • /
    • pp.189-200
    • /
    • 2017
  • The work breakdown structure and the precedence relations by work activity are very important because they are the basic data for estimating the construction duration in the construction work. However, there is no standard to accurately estimate the construction duration since the size of the school facilities construction is smaller than the general construction work. Therefore, some schools are unable to open in March or September and the delay of the construction duration can cause damage to the students. To solve this problem, this study developed a work breakdown structure of school facilities construction work and analyzed the precedence relations by work activities. The work breakdown structure of the school facilities construction is composed of three steps. The operations corresponding to level 1 and level 2 are as follows. (1) 2 preparatory work categories; preparation period and temporary construction. (2) 17 architectural work categories; temporary construction, foundation & pile work, reinforced concrete work, steel roof work, brick work, plaster work, tile work, stone work, waterproof construction, wood work, interior construction, floor work, metal work, roof work, windows construction, glazing work and paint construction. (3) 7 mechanic and fire work categories; outside trunk line work, plumbing work, air-conditioning equipment work, machine room work, city gas plumbing work, sanitation facilities and inspection & test working. (4) 4 civil work categories; wastewater work, drainage work, pavement work and other work. (5) 1 landscaping work categories; planting work. The work breakdown structure was derived from interviews with experts based on the milestones and detailed statements of existing school facilities. The analysis of precedence relations by school facilities work activity utilized PDM(Precedence Diagramming Method)which does not need a dummy and the relations were applied using FS(Finish to Start), FF(Finish to Finish), SS(Start to Start), SF(Start to Finish). The analysis of this study shows that if one work activity is delayed, the entire construction duration may be delayed because the majority of the works are FS relations. Therefore, it is necessary to use the Lag at the appropriate time to estimate the standard construction duration of the school facility construction. Lag is a term used only in the PDM method and it is used to define the relationship between the predecessor and the successor in creating the network milestone. And it means the delay time applied to the two work activities. The results of this study can reasonably estimate the standard construction duration of school facilities and it will contribute to the quality of the school facilities construction.

산출내역서.공정 통합관리 모형 구축에 관한 연구 (Work Management Model to Integrate Schedule and Bill of Quantit)

  • 박홍태;박찬정
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2002년도 학술.기술논문발표회
    • /
    • pp.123-131
    • /
    • 2002
  • Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule, the existing systems, however, are focused on the cost management by using wort quantity. This study suggests a work management mode1 to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction cost to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.

  • PDF

소형건축물 수직골조 대상 3D 프린팅 액티비티 분석 (An Analysis of 3D Printing Activities for Vertical Structure of Small Building)

  • 박형진;주기범;서명배
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.308-309
    • /
    • 2018
  • Construction automation is needed to improve construction productivity. 3D printing is a key technology of the 4th industrial revolution, and when applied to the construction field, the ripple effect is very large. In this paper, we propose a 3D printing method that can predict the 3D printing process and estimate the construction duration for each process. Through literature review and expert consultation, eight 3D printing activities for structure work were derived. Construction duration and cost estimation for each activity will be needed in the future research.

  • PDF

산출내역서.공정 통합관리 모형 구축에 관한 연구 (Work Management Model to Integrate Schedule and Bill of Quantity)

  • 박홍태;박찬정
    • 한국건축시공학회지
    • /
    • 제2권4호
    • /
    • pp.153-161
    • /
    • 2002
  • Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule. the existing systems, however, are focused on the cost management by using work quantity. This study suggests a work management model to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction rest to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.

공동주택 건축공사의 공종별 폐기물의 종류와 발생원인 분석 (An Analysis of Classification and Causes for Construction Waste of Apartment Building Projects)

  • 서종민;김선국
    • KIEAE Journal
    • /
    • 제7권5호
    • /
    • pp.127-133
    • /
    • 2007
  • Each year the amount of construction wastes increases at a rapid pace. Particularly, wastes from apartment housing projects that make up 89.14% of the total construction projects have increased about 48% as compared with those of the year 2000. Construction wastes are therefore rising as an issue related to environmental problems and disposal costs. And there are ongoing studies of the disposal, control and recycling of construction wastes. Mitigation measures for the wastes, however, have been a rare subject of research that focuses on waste-generating factors by activity during apartment housing projects. Given that, the purpose of this study was to categorize construction wastes by work type and to identify the factors causing wastes in order to reduce them. This study investigated the amount of the wastes from apartment housing constructions by activity as related to disposal costs, and examined causes in the ordering, transport, material management and construction stage, respectively. The analysis results will likely bring about expectation effects that help reduce the generation of the wastes by establishing action plans.

작업공간과 자원의 여유시간 최소화를 통한 반복작업 공정계획기법 (Network Compression by Saying Idle Time of Resources and Spaces for Repetitive Activities)

  • 이규진
    • 한국건설관리학회논문집
    • /
    • 제1권3호
    • /
    • pp.75-80
    • /
    • 2000
  • 공간의 분할이 많은 건축공사에서는 반복적 특성으로 인해 공정계획상에 다수의 대안이 존재한다. 공사기간은 각 액티비티의 기간뿐 아니라 반복되는 액티비티의 배열방법에 의해서도 많은 영향을 받는다. 본 연구는 각 액티비티에 적정한 선행 액티비티를 할당함으로써 여유시간을 최소화하는 공정계획기법을 제시하는 것을 목적으로 진행되었다. Line of Balance 기법을 기본으로 하는 기존연구와는 달리 본 연구에서는 AON방식의 네트워크 기법을 기본으로 하여 공간과 자원의 두 축 사이에 액티비티를 배열하였다. 각 액티비티별로 자원과 공간의 양방향으로 가장 적절한 선행 액티비티를 검색하여 여유시간을 최소화한다. 본 연구에서 제시한 액티비티 배열방법을 공동주택공사 건설공사를 대상으로 적용한 결과, 액티비티 배열을 달리함에 따라서 다수의 대안이 존재함을 확인할 수 있었으며 그중 적정대안을 찾아낼 수 있었다. 본 기법은 공동주택공사와 같은 다수의 유사공간으로 구성된 건설공사의 공정 계획에 도움을 줄 수 있을 것으로 판단된다.

  • PDF

자원투입 비용을 고려한 공정관리 작업기간 산정 (Projection of Activity Duration Utilizing Historical Cost Data)

  • 문성우;강상래
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.444-447
    • /
    • 2006
  • 건설 프로젝트가 성공적으로 수행되기 위해서는 각종 제반 관리업무가 상호 밀접한 관계성을 유지하면서 프로젝트를 수행해야한다. 이중 공정관리는 인력, 자재, 장비, 원가 등 여러 가지 건설공사에 필요한 자원에 대한 관리업무를 시간적인 흐름 속에서 모델화 시킨 것으로, 공정관리의 원활한 수행은 프로젝트의 성공에 직접적인 영향을 주게 된다. 현행 공정관리 업무 프로세스에서 공사기간의 산정시 가장 중요하게 고려해야 할 점은 작업의 생산성은 투입되는 자원의 양과 질에 의해서 영향을 받으며, 이러한 자원의 특성은 투입비용으로 나타나게 된다는 것이다. 본 논문의 목적은 현장에서 사용되는 인력과 장비 등 자원투입 비용을 중심으로 생산성을 분석하고, 보다 현실성 있게 생산성 테이터를 공정계획의 수립시 작업기간 산정에 활용하는 방안을 제시하는 것이다. 본 연구에서 작업비용은 투입자원의 가격을 기준으로 산정했으며, 투입자원 비용과 작업량을 비교 ${\cdot}$ 검토하여 소요되는 작업기간을 예측한다. 이와 같은 공정데이터의 활용은 데이터베이스를 기반으로 하는 공정관리의 전 단계로써 자원투입 비용을 고려한 공정관리 방안을 제시하고, 이에 대한 타당성을 검토했다.

  • PDF