• 제목/요약/키워드: Construction

Search Result 55,017, Processing Time 0.064 seconds

Framework for Estimating Appropriate Construction Duration of CFRD in the Planning Phase

  • Kim, In Kyum;Kim, Kyong Ju;Yun, Won Gun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.604-605
    • /
    • 2015
  • To secure quality of dam construction needs appropriate construction duration. Tight construction schedule may have negative influence on infrastructure quality, work safety and maintenance cost. It is necessary to reflect proper construction duration in the planning phase. There have been standards for estimating construction duration of building and industrial complex development but dam construction have not. In order to estimate construction duration of CFRD, feasible study reports and design reports were analyzed to acquire available information. After that, considering on construction duration methods such as comparison with similar cases, approximate estimating formula, approximate quantity assumption were adapted to Critical Path items. Hence, this study present framework for construction duration estimating of CFRD in the planning phase. This framework can be applied other types of dam along the same line.

  • PDF

A Study on the Prediction Model of Total Construction Period according to the Type of Machine Learning Regression (머신러닝 회귀분석 유형에 따른 총 공사기간 예측 모델에 관한 연구)

  • Kang, Yun-Ho;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.361-362
    • /
    • 2023
  • In construction work, there is often a difference between the estimated construction period and the actual construction period. Accordingly, the project may be delayed from the scheduled date, leading to huge losses due to problems such as increased costs during construction. In this way, it is important to calculate the appropriate construction period at the project planning stage in construction work. To solve this problem, we would like to study a model that will increase the accuracy of the scheduled construction period at the project planning stage. This study compared and analyzed linear regression, Lasso regression, Ridge regression among the types of regression analysis to select an appropriate construction period prediction model to secure an appropriate construction period at the project planning stage to reduce problems during construction.

  • PDF

A Study on the Derivation of Construction Priority in the Construction Stage of Green Remodeling in Public Buildings - With a Focus on Construction Elements - (공공 건축물 그린리모델링 시공단계 공사 우선사항 도출에 관한 연구 - 건축요소를 중심으로 -)

  • Park, Jun-Soo;Ahn, Yong-Han
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.59-60
    • /
    • 2023
  • Climate change caused by greenhouse gas emissions has become a climate crisis that actually threatens us and is making global efforts to solve it. In response, Korea is carrying out a "Green remodeling" project to reduce carbon emissions generated in the building maintenance stage, which has the highest percentage of all carbon emissions. However, Green remodeling is carried out under emergency supervision at the construction stage, but construction supervisors are often non-professionals, and even experienced site directors have difficulty in implementing actual designs if they do not have experience in Green remodeling construction. Therefore, this study aims to derive priorities between construction and construction focus points for each construction in order to standardize the construction of Green remodeling construction works and derive objective guidelines.

  • PDF

Chinese Construction Market for Foreign Construction Enterprises using SWOT

  • Zhi, Wang En;Woo, Moon Sung
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.2
    • /
    • pp.23-30
    • /
    • 2014
  • The remarkable growth of China's economy over the past several decades has obtained tremendous achievements. The construction industry play a leading role un this rapid economic expansion. And China's huge construction market gives it great economic influence around the world, it has attracting many enterprises to entry, although many enter barriers and market risks exist. However many construction enterprises have not doing well, especially foreign construction enterprises are not doing as well as we thought in the Chinese construction market. Although China's construction market has great development and become increasingly open, foreign investors and contractors now have much broader access to the Chinese construction market than before. But nonetheless, there are a wide range of practical problems that bring potential risks for them to invest in China. This paper aims to identify foreign construction enterprises' position by understanding the local market environment, and adopt he SWOT analysts Identifies the foreign construction enterprises' strengths, weaknesses, opportunities, and threats in the Chinese construction market, to Proposes appropriate Strengths-Opportunities (SO), Weaknesses-Opportunities (WO), Strengths-Threats (ST) and Weaknesses-Threats (WT) strategies to make the foreign construction enterprises movling forward.

A Study on Development of Remote Site Monitoring System in Public Road Construction Projects (공공 도로건설사업에서의 원격 현장모니터링 체계 구축에 관한 연구)

  • Ok, Hyun
    • International Journal of Highway Engineering
    • /
    • v.14 no.6
    • /
    • pp.57-65
    • /
    • 2012
  • PURPOSES : Efficiency Improvement of a public road construction project management work using the development of a real-time remote site monitoring system METHODS : In this study, we developed the remote site monitoring system using a web camera for road construction projects in the RCMA(Regional Construction Management Administration). We can be monitored a construction progress and a weak point of the situation in real time using this. To achieve this, we tested about 10 road construction projects ordered by RCMA. Then, we verified a applicability for the site monitoring system in future. RESULTS : Take advantage of the remote site monitoring system consists of the Construction CALS System, one of the business systems used in the part of the MLTM(Ministry of Land, Transport and Maritime Affairs) institution-agencies. Was configured to be served through the "Construction CALS System" of "Construction Management System(Contractors)" and the "Construction CALS Portal System". Through this, Benefit analysis through a pilot application of the 10 road construction sites and developing considerations and "Guide for visual information processing equipment installation-operating in construction sites"are presented. CONCLUSIONS : Through the establishment of remote site monitoring system can improve the efficiency of construction management services. In addition, Various disasters and calamities, accidents and illegal construction will be prevented in advance is expected. This is expected to further improve the quality of the facilities.

A Study of Client's Role for Safety Management at Construction Sites (건설현장에서 안전재해예방을 위한 발주자의 안전관리 역할)

  • Lim, Jee-Young;Han, Kap-Kyu;Kim, Sun-Kuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.5
    • /
    • pp.75-83
    • /
    • 2008
  • Larger and more sophisticated building construction requires more input resources such as worker, materials and devices. Growing resource volume brings risks at a construction site. The industry makes an effort to protect probable incidents at the site by organizing a safety management team. conducting a safety instruction and etc, but losses especially in the construction are higher than other industries. Major reason is that the safety management program is conducted only at the step of construction work and a root cause is not eliminated. Conventionally a concerned party shifts the blame to other parties such as constructor and site workers who are direct participants in the construction site. However, the whole causes of incidents go to the all subject of the construction not only the constructor but the client, designer and others related in the construction, and especially the clients are heavily involved in general concerns of the project. Therefore, this study is defined the role of the clients in nations and domestic condition of construction safety management is investigated. And it is analyzed surveys to prevent incidents at construction sites, and suggested the role of the clients which is classified pre and post construction, and in the middle of construction, and also categorized planning and design & construction schedule especially for the pre-construction level.

Suggestion and Verification of Assessment model on Construction-Cost of Steel Bridge in Project Performance Phases

  • Kab-Soo Kyung;Hye-Yeon Park;Sin-Hwa Kang;Eun-Kyoung Jeon
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.606-615
    • /
    • 2009
  • Estimating the reasonable construction-cost according to the construction phase in public construction is an important element for securing and executing a national budget efficiently. As a general rule, the predetermined cost of construction is estimated at the end of the design of the target structure. Therefore, it seems to be a considerably difficult problem to estimate the approximate cost of construction, only with its basic information of the bridge in the design planning phase and the early design stage where we can not have specific detailed-section of the target structure. In this paper, we present the calculation of construction-cost in the planning phase based on the analysis of factors affecting the cost of construction conducted in the previous study. Beside, to estimate the cost of construction in early design phase, we would like to present the calculation of construction-cost in the early design phase by executing the analysis of data collected from 61 steel box bridges. It was found from the result of study that the estimated cost of construction gained by the calculation of construction-cost in this paper reduces the error between the real cost of construction and that by the existing method of using.

  • PDF

A FUNDAMENTAL STUDY TO DEVELOP STANDARD TECHNOLOGY CRITERIA FOR IT-CONSTRUCTION FUSION TECHNOLOGIES, TO BE APPLIED TO A U-CITY

  • Kyoon-Tai Kim;Jae-Goo Han;Chang-Han Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1352-1358
    • /
    • 2009
  • As the demand for a convergence between construction technologies and IT is on the rise, as seen in the visualization of U-City construction, studies on the ways in which IT in should be utilized in the building and construction field have been continuously and actively performed. However, there has been almost no development of standardized technology criteria relating to the life cycle of a building (planning, design, construction, and maintenance). That is, there are almost no examples of efforts made to combine construction technology and IT in a fundamental way, considering the environment, the facility, its spatial characteristics, engineering, materials, and structure, aspects that are commonly required not only for interior spaces but also for exterior construction of U-City. Despite the fact that a state-of-the-art infrastructure has been built, and the competency of users with the cutting-edge technology, composite studies on technologies, facilities, services and spaces are still lacking, and basic research on the composite operation method including compatibility and linkage between facilities and services within a U-City has been insufficient as well. It is generally known that by fusing IT with construction technologies, the total period of construction taken can be reduced and construction expenses can be curtailed, while construction quality can be improved. For this reason, it is vital to prepare a standardized base to connect cutting-edge IT with the construction technologies. In preparing such a base, the most urgent issue is to develop standardized technology criteria. The ultimate objective of this research is to establish the technological criteria system required to apply construction-IT fused technologies to U-Cities, and to develop the technological criteria for the design, construction and maintenance of the U-Cities. This paper, whose objective is to establish development strategies for construction-IT fused technologies by way of analyzing the criteria for conventional construction projects, the necessity of criteria for construction-IT fused technologies, and the current status of U-Cities' development, is the underlying research for this purpose. The strategies established are expected to be utilized in establishing the system of criteria for construction-IT fused technologies, and to contribute to a knowledge base in the construction-IT field. In addition, based on the strategies established, criteria for construction-IT fused technologies, such as design criteria and construction standards, will be developed, and by applying these criteria and standards, the ultimate objectives of U-Cities, which are the enhancement of urban competitiveness and the satisfaction of residents, will be attained

  • PDF

Analysis of Construction Safety Management and Execution Tasks for Performance Improvement (건설공사 안전관리 및 시공 업무의 중요도 분석에 관한 연구)

  • Kang, Sang-Hun;Kim, Dae Young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.130-131
    • /
    • 2018
  • The main purpose of this study is to analyze the importance of the construction work of apartment buildings. The construction work operation was divided into five major tasks, which include: Schedule Control (P'1 - P5) Construction Management (C'1 - C'5), Environmental Management (E'1 - E'3), and Quality Management. Finally, this study derived major construction execution tasks through correlation between construction work and the original index and t-test.

  • PDF

건설 안전관리 체계의 개선 방안에 관한 연구

  • 김세영;안병수
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2000.05a
    • /
    • pp.9-26
    • /
    • 2000
  • Eventually so as to realize the construction safety, 1 found out the cause of accident and specificities of the construction industry. This study presented to several situations and problems on construction safety. As a result of this study, the below matters must be improved for more effective the construction safety management system. 1. It need to introduce the total construction safety management system. Because there is not effectiveness in the current safety management to the first on the construction field. a. We must consider the safety in the whole parts of the process of the construction and constructors of each part must devide responsibility of the construction safety as a CDM(The Construction Designed Management) used in UK. b. It is desirable to proceed control of safety in the whole parts of the construction to introduce the total safety coordinator that can consult the matters of safety as a law accepted in EU. c. Like management of the construction safety in USA, direction of the construction safety must be made to work exactly by code or manual. d. To improve the organization of the construction safety on the construction field unefficient, it must be introduced safety supervisor, safety coordinator or institutionalization of safety consultant. 2. The law of the construction safety not only have wasteful element but also decrease efficiency by overlapping of regulation, The Ministry of Labour and The Ministry of Construction & Transportation, So laws related with safety must be instituted. a. To realize total safety management, The Ministry of Labour must legislate the basic law about safety management in whole field. b. To legislate the construction safety under one law, and improve efficiency of the overlapping of regulation and the similar law by The Ministry of Construction & Transportation. c. It must be made the law of construction safety that can proper to change of situation in construction. d. The standard of safety must be instituted belong to international level and improved by year. e. We must improve irrational regulation to realize activity of safety self regulating for progress competition in construction industry

  • PDF