International conference on construction engineering and project management
/
2011.02a
/
pp.550-555
/
2011
Utilizing construction knowledge and experiences in design phase can reduce change orders and improve productivity in construction phase. To do so, information must be made available to the design team in time. Current approaches for effective utilization of constructability knowledge, however, only focus on the formalization of constructability knowledge such as a checklist, which lacks the consideration of the appropriate use at the proper point in time. The inadequate use of constructability knowledge can result in unnecessary reworks. To deal with this problem, the design team needs to know what constructability knowledge is required for specific design activities in the design process. This paper presents a constructability implementation model using the dependency structure matrix (DSM) that focuses on information flows between design activities and constructability knowledge. For this objective, design activities in the design process are modeled in a matrix form based on their dependency. Then, constructability knowledge, which needs to be considered in the design stage, is mapped into activities and incorporated into the matrix, creating Constructability-DSM (C-DSM). Next, the partitioning algorithm is applied to C-DSM for optimal information flow. The Partitioned C-DSM is then analyzed based on the relationship between activities. Finally, the optimal utilization of construction knowledge in the design process is determined by identifying what constructability knowledge is required for each design activity, and how and when it is reflected to design for constructability. Thus, this research can help provide robust control actions to reduce unnecessary iterative cycles in design process for efficient constructability implementation.
The consideration of constructability issues at the design stage can lead to improved construction performance with smooth project delivery and savings in time and money. Empirical studies demonstrate the value obtained by integrating construction knowledge with the building design process, and its benefits for owners, contractors and designers. However, it is still a challenge to implement the concept into current design practice. There is a need for a decision support tool to aid designers in reviewing their design constructability, deploying current technological tools, such as BIM. Such tools are beneficial at the conceptual design stage when there is a room to improve the design significantly with less incurred cost. This research investigates how current process- and object-oriented models can be used to assess design constructability. It proposes a BIM-based model using embedded information within the design environment to conduct the assessment. The modelling framework is demonstrated in four key parts; namely, the conceptual design model, the constructability assessment model, the assessment process model and the decision-making phase. Each is associated with a set of components and functions that contribute towards the targeted constructability assessment outcomes. The proposed framework is the first to combine a numerical assessment system and a rule-based system, allowing for both quantitative and qualitative approaches. The modelling framework and its implementation through a prototype are described in this paper. It is believed that this framework is the first to enable users to transfer their construction knowledge and experience directly into a design platform linked to BIM models. The assessment criteria can be customised by the users who can reflect their own constructability preferences into various specialised profiles that can be added to the constructability assessment model. It also allows for the integration of the assessment process with the design phase, facilitating the optimisation of constructability performance from the early design stage.
International conference on construction engineering and project management
/
2007.03a
/
pp.1-8
/
2007
Construction designs are often produced with insufficient considerations on the constructability aspects. Poor constructability has resulted in delay, cost increase, disputes, safety hazards and inconvenience to the public. Increasingly, there has been a call for more systematic input of construction knowledge in the planning and design processes of modern day's infrastructure development. In some countries, notably the US, the practice of constructability reviews is on the rise, with concomitant benefits. It is advocated that construction plans and designs be subject to constructability reviews as early as possible. It should be made part of the project management strategy driven by the client. This paper outlines the constructability review process and benefits, whilst drawing lessons from a number of case studies.
International conference on construction engineering and project management
/
2015.10a
/
pp.147-149
/
2015
A nuclear power plant construction project normally involves a large construction work of which the total project cost is over 5 trillion Won, Such a large-scale construction project has the risks of schedule delay and quality degradation due to increase in project cost, because designs are changed due to design errors. The reasons for design changes during installation are 1) insufficient engineering capability of the owner, 2) information discontinuance due to the multiple package method, and 3) inefficient constructability review processes. Accordingly, this study proposes, through problem analysis, a method of developing a constructability review system that utilizes constructability review processes and a data-based technology (3D modeling) that are optimized for nuclear power plant construction projects. It also presents a method of establishing a system for reviewing constructability in which constructability review processes and a Database (3D model, Schedule, Design change Items) are linked each other.
Sung-Wook Choi;Young-Woong Song;Yoon-Ki Choi;Dong-Woo Shin;Jae-Youl Chun
International conference on construction engineering and project management
/
2005.10a
/
pp.1150-1153
/
2005
The orders of Design-Build Delivery System (DBDS) in a large and public construction project have been increasing. Single Source Responsibility (SSR) for design and construction, which contributes to quality improvement of design and construction, has been performed. The DBDS performs SSR for design and construction, but, it has not maximized effect because of the dissatisfied alternative analysis procedures which are based on constructability evaluation and the information system in the design step. In this research, Constructability Evaluation Factors (CEFs) that must be evaluated, investigated, and reflected in the basic design step for design-build projects. The CEF proposed and the business process of each conductor has been systematized. To propose constructability evaluation factors, first classify drawing information by the constructability evaluation sphere. CEFs must be proposed to evaluate factors according to interference among work items. Second, applicable CEFs must be classified by preference ranking and weight. Third, the values of constructability factors in accordance with building elements and work items, need to be calculated. Finally, the CEFs proposal will support rational decision making, design cost reduction, and quality improvement through the values for constructability of building elements and work items.
Proceedings of the Korean Institute of Building Construction Conference
/
2018.11a
/
pp.128-129
/
2018
With the increase of tall building construction, efforts for enhancing constructability are required from the pre-construction stage. Therefore, in this study, we proposed an evaluation method of constructability performance by performing construction engineering activities at the design phase. Based on some results of previous studies, we estimated the importance of design factors and categories influencing the constructability in each engineering activity related to temporary work and then presented a method for evaluating the constructability performance of design alternatives.
Korean Journal of Construction Engineering and Management
/
v.15
no.4
/
pp.30-38
/
2014
Achieving high productivity and constructability are very important issues in construction industry. Study on constructability have been conducted actively, and many researches referred that improving constructability can enhance cost, quality, schedule, productivity and so on. However, there are lack of quantitative analysis, since most studies have proved correlation between productivity and constructability using questionaries and by case studies. Also, researches are mostly about specific detail scope of work to improve constructability, thus it is hard to apply constructability factors on various work in construction. In this paper, will deduct general factors affecting on constructability and evaluate effects of factors affecting on each work. Furthermore this paper will verify impact of factors affecting on productivity by multi regression anlaysis using actual data sets of high-rise building construction site.
Journal of the Regional Association of Architectural Institute of Korea
/
v.20
no.6
/
pp.97-104
/
2018
Recently, as the shape and function of high-rise buildings have become more complex, engineering for reflecting the constructability in the design phase has the increasing importance. However, engineering tasks are not performed at the appropriate level and timing in most projects, which leads to inefficient work such as design changes and reworks. Hence, this study investigated the constructability knowledge, design elements, and supporting tools required to conduct engineering tasks related to temporary work at the design phase, and also analyzed the relationship between these factors using the correlation analysis. As a result, when the engineering tasks are applied in the design phase, constructability knowledge related to 'construction method and process' is the most important and the design factor related to 'layout/arrangement' should be considered as the most important factor. Based on the results of this study, the project participants can efficiently use necessary constructability knowledge during the design phase and facilitate effective decision-making and design alternatives for enhancing constructability.
Korean Journal of Construction Engineering and Management
/
v.11
no.2
/
pp.137-146
/
2010
Becoming construction projects larger and more complicated, and utilizing more varied and complex contracting and delivery systems in the industry, integrating information and managing constructability from project inception to completion became the most critical tasks for the successful project management. However, current industry practices of constructability analysis which are too much dependent on field engineers and managers' experiences, are not performed efficiently and also not managed effectively. Then the scope, method, and procedure in performing analysis tasks are not certain as well as not systematic, In addition, due to using 2D based drawings and documents, information required at project phases for the analysis is inconsistent and inaccurate. This study aims to suggest the use of BIM technology and functions for solving various problems of current constructability practices. In particular, constructability analysis tasks performed at design and construction stages are identified and their adaptability, applicability, and benefits of BIM are investigated through interviews on constructability and BIM professionals in the industry.
Proceedings of the Korean Institute of Building Construction Conference
/
2016.10a
/
pp.69-70
/
2016
The constructability of formwork has a significantly influence on the duration and cost in tall building construction. However, current installation and dismantling process are conducted with heuristic approaches due to the absence of reasonable constructability review method. This study proposes a new method to review the constructability of formwork by utilizing 3D printing technology. It is expected that the suggested review method could reduce formwork duration and cost with subjective, but rational manner.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.