• Title/Summary/Keyword: Conflict Management

검색결과 1,141건 처리시간 0.031초

Improving Product Quality through Conflict Management: A Study of Hong Kong ODM Suppliers

  • Lam, Ping-Kit;Chin, Kwai-Sang
    • International Journal of Quality Innovation
    • /
    • 제5권2호
    • /
    • pp.70-78
    • /
    • 2004
  • Client-supplier collaboration in new product development (NPD) has been a strategy in response to fierce global competition. Traditionally, Hong Kong suppliers collaborate with worldwide clients through original equipment manufacturing (OEM) arrangement in which suppliers manufacture products according to clients' design. In recent years, a growing number of Hong Kong suppliers have transformed to original design manufacturing (ODM) in which they are assigned a design responsibility other than manufacturing products. The ODM arrangement necessitates a close interaction between clients and suppliers, which brings about intense conflict. Conflict has been recognized as an important factor affecting NPD performance including product quality. This paper studies the conflict handling practices of Hong Kong ODM suppliers based on 87 survey data. The results show that the suppliers frequently adopt effective conflict handling practices by which they can develop products of good quality through better design decisions. The results also suggest that the use of ineffective conflict handling behaviors, particularly avoiding, should be reduced for better product quality.

Cultural Aspect of Conflict Behaviour in Construction -A Case Study from Turkey

  • Babaoglu, F.Fusun Ertan;Giritli, Heyecan
    • Journal of Construction Engineering and Project Management
    • /
    • 제7권2호
    • /
    • pp.45-53
    • /
    • 2017
  • Although much research has been conducted to identify the influence of culture on conflict management and resolution behaviours in organizational settings, no study has been done yet in the construction industry particularly in considering the influence of individual level individualistic and collectivistic values. Despite the key role of self-construal in explaining or predicting behaviour in interpersonal conflict, it has not received enough attention in construction management. Reflecting this necessity, the objective of this exploratory study was to establish, through the application of the Rahim Organizational Inventory (ROC II) instrument, how the cultural values of professionals of construction businesses relate to the application of different conflict-handling styles through self-construal. Data were collected using questionnaire surveys from construction professionals working in contracting firms. The findings illustrate the importance of self-construal type as an individual-level cultural variable in explaining the differences in the style of handling interpersonal conflict in the context of the construction industry.

도시재생사업의 갈등 양상에 관한 연구 (안양 명학마을 도시재생사업을 사례로) (A Study on the Conflict Aspects of Urban Regeneration Project (Case study of Anyang Myunghag Village))

  • 문채
    • 한국콘텐츠학회논문지
    • /
    • 제21권11호
    • /
    • pp.165-178
    • /
    • 2021
  • 2017년도부터 시작된 도시재생뉴딜사업은 중요한 도시정비수단이 되고 있다. 안양 명학마을 도시재생사업은 2017년도에 선정된 사업으로서 2021년 현재 4년차 사업이 진행되고 있는데, 그동안 사업추진과정에서 많은 갈등이 발생하였으며, 앞으로도 갈등 발생이 예상되고 있다. 본 연구는 이러한 명학마을 도시재생사업을 대상으로 하여 .어떠한 갈등이 어떠한 형태로 발생하고 각각의 단계에서 어떠한 해결방안을 통해 갈등을 해결하였는지를 밝히는 것을 연구의 목적으로 하였다. 그리고 이를 통해 명학마을 도시재생사업에서 발생한 갈등 양상의 특성(①도시재생사업에서의 지속적인 갈등의 발생, ②다양한 갈등 주체 및 내용으로 구성, ③갈등관련 조직의 역할 미비, ④갈등발생 및 해결에서의 주민 소통의 중요성)과 향후 도시재생사업에서 갈등관리를 위한 시사점(①지속적인 갈등관리 방안 마련, ②갈등관리 조직의 조기 구성과 역할 강화, ③갈등관리를 위한 주민과의 소통, ④사업추진단계별 맞춤형 갈등관리)을 제시하였다.

조직간 정보시스템 통합을 위한 갈등관리모형: 은행업종의 인수.합병을 중심으로 (A Study on Conflict Management Model for IS Integration: Focusing on Banking Industry under M&A)

  • 김상훈;최점기
    • 한국IT서비스학회지
    • /
    • 제5권1호
    • /
    • pp.83-95
    • /
    • 2006
  • The main objectives of this study are (1) to identify the conflict types in IS integration process with respect to M&A, (2) to propose the ways to manage the origin of conflict to be expected, and (3) to develop the conflict management model which establishes the relationship among the M&A strategy, the IS integration strategy and change management process that influence the source of conflict. In order to achieve these research objectives, this study focuses on banking industry under M&A with the viewpoint of change management instead of existing technology-oriented IS integration strategy. The findings of this study are thought not only to be useful as a practical guideline in carrying out IS integration project under M&A but also to provide significant basis for constructing the theoretical framework of effective IS integration strategy.

Analyzing Characteristics of Construction Complaints with Construction Project Type

  • Lee, Ju-Hui;Lee, Changjun;Yun, Sungmin
    • 한국건설관리학회논문집
    • /
    • 제24권3호
    • /
    • pp.52-61
    • /
    • 2023
  • Conflicts in a construction project not only make negative impacts on project performance such as schedule delay or cost overrun but also require social cost to resolve the conflicts. Although the conflict needs a preemptive management because a conflict usually begins with a complaint, existing studies have focused on conflict resolution after it occurs. This study identifies and categorizes complaints which mainly appear in the construction projects. Those complaints were evaluated and quantified in terms of occurrence frequency and potential to conflict through a questionnaire survey with industry experts. Using the survey results, this study examines the characteristic of complaints in linear project and clustered project, and analyzes what kind of complaints occur by project type. As the results, this study derives the complaints with high potential to the conflicts that should be managed first during managing a construction project in each project type.

주한 외국인 근로자 갈등방안에 관한 연구 -대전.충남지역 중소기업을 중심으로- (A Study on the Conflict plan of the foreign worker in Korea)

  • 김정범
    • 경영과정보연구
    • /
    • 제2권
    • /
    • pp.355-390
    • /
    • 1998
  • The purpose of this study was to determine the conflict plan of the foreign worker in Korea. The concrete purpose of this study as follows : First, To Analyze Conflict factor of job according to the foreign worker conflict. Second, To present rethinking plan of job and efficiency management foreign worker in Korea. The Subject of this study were consisted of 308 foreign worker form 408 small and medium business in taejon city, Chung-Nam. Conflict factor of job was measured according to questionare used in precedent study. Statistical treatment were the mean, Standard, Deviation, One-way ANOVA analysis. The conclusions of the paper research were as follows. First, Foreign worker showed occasionally lower degree conflict of job. Second, Woman foreign worker had higher conflict of job than man foreign worker in wage, working condition, human relation, communication. Third, The foreign worker is short In Job-experience. therefore, efficiency management of job was fall. Fourth, The relationships between Korea-worker and foreign-worker were conflict in communication, human relation. Fifth, The relationships between Korea-worker and foreign-worker were conflict wage-discrimination. Sixth, The more education-level had lower conflict. Seventh, According to cultural characteristic had different.

  • PDF

항만분야 공공갈등 관리방안 도출에 관한 연구 (A Study on Derivation of Public Conflict Management Countermeasure in the Port Sector)

  • 김가현;김세원;이혜령
    • 한국항해항만학회지
    • /
    • 제47권4호
    • /
    • pp.246-255
    • /
    • 2023
  • 항만분야에서 발생하는 공공갈등은 추가적인 사회적 비용 유발과 함께 항만 인프라 적기 공급을 지연시켜 지역산업 및 국가 경쟁력에 부정적 영향을 미칠 수 있다. 점차 항만분야의 갈등관리 중요성이 커지고 있음에도 불구하고 아직까지 체계적인 갈등관리방안은 부재한 상황이다. 이에 본 연구에서는 현재 항만분야 갈등관리체계의 한계점을 고찰하고 항만분야 정책 담당자, 갈등관리 전문가지방청 및 항만공사의 개발·계획 담당자, 해양수산부 갈등관리 종합시책 관련 담당자, 갈등관리 전문가 및 업계전문가를 대상으로 델파이 조사를 수행하여 항만분야에서 발생하는 갈등을 진단할 수 있는 기준, 갈등발생원인, 사전적 관리방안과 사후적 해소방안을 도출했다. 델파이 조사 결과, 갈등 발생의 가장 큰 원인은 '이해관계자 의견수렴 및 협의, 소통 수단 부재'로 나타났다. 사전적 갈등관리방안은 '구체적 사안 결정 전, 지역 의견 수렴과 발전방향을 논의하기 위한 공론화 절차 진행'이, 사후적 갈등해소방안으로는 '갈등원인 조사, 대안 마련 과정에 현지 주민 및 객관적 인사 등을 포함시켜 신뢰성을 확보하는 것'이 가장 중요한 것으로 도출되었다. 나아가 본 연구에서는 도출된 결과를 바탕으로 항만개발사업 단계별 갈등관리기법을 제시했으며 이는 현재까지 국무조정실의 「공공기관 갈등관리 매뉴얼(2016)」에는 포함되어 있지 않은 항만분야를 반영하는데 유용한 참고자료로 활용될 수 있을 것으로 생각된다.

조직갈등 관리: 인지맵 기반 접근 (Organizational Conflict Management: Cognitive Map Approach)

  • 곽기영;김영걸
    • 경영과학
    • /
    • 제15권2호
    • /
    • pp.161-175
    • /
    • 1998
  • As organizations have come to be more complex and diverse, management has come to spend an increasing proportion of its time and efforts in handling organization conflict. Moreover, organizational conflict problems are often not recognized until the balance of interests is destroyed or a radical organizational change such as BPR takes place. Once an organizational conflict arises, however, it reduces corporate synergy seriously, leading to organizational ineffectiveness. Therefore, it is important to identify the cause of organizational conflict in advance and resolve it based on the proper diagnosis as early as possible lest it should undermine the organizational effectiveness. We propose a method that facilitates diagnosing potential organizational conflict and determining appropriate strategy to the conflict, based on the analysis of cognitive maps. To support the application of the method in the real world context, a computerized tool is introduced. The working procedures of the method and the features of the tool are illustrated with their application to the real case of the cable TV home shopping company.

  • PDF

Conflict Avoidance in Construction Projects: Six 'C' Rescue Factors

  • Acharya Nirmal Kumar;Lee Young-Dai;Kim Sa-Myeong
    • 한국건설관리학회논문집
    • /
    • 제6권6호
    • /
    • pp.193-204
    • /
    • 2005
  • Conflict is aroused when different people having different interest work together for fulfilling same the objectives. As the construction field is large, complex, volatile and requires tremendous capital, there are always greater challenges and possibility of risks of conflicts. Poor management practices in construction site and trying to protect risks and threats by contracting parties are the cited sources of the construction conflicts. The best management practice is to resolve the problems before these cultivate as conflicts. This paper has identified six dispute avoidance factors-Convince, Coordination, Consideration, Compromise, Consolation and Coercion. Six 'C' factors described in this paper are the mantra (formula) to execute a conflict free construction project. The conflict avoidance factors have been verified through a successfully executed project called TEVT development project (Technical Education and Vocational Training) during 1993-1998 in Nepal. The results show that the six 'C' factors 'C' considered during the implementation of the project, construction conflicts would be controlled or minimized effectively.

도시재생사업의 갈등 최소화를 위한 경로분석 (Path-Analysis for Minimize a Conflict on Urban Regeneration Project)

  • 김가람;유정호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 1부
    • /
    • pp.181-184
    • /
    • 2011
  • The earlier studies which are related to conflict management for urban regeneration project were based on limited case-studies on a specific phase. In addition, those studies did not considered a multidisciplinary approach for critical factor of conflict occurrence. In this reason, to establish a practical management or a policy is limited. In this paper, 'Good communication and information sharing' and 'Cooperativeness of stakeholders on project' are defined by critical factors for minimization of conflict between stakeholders. Furthermore we analysis the influence of those factors to minimization of conflict using path-analysis. This paper contributes to increase the efficiency of conflict management through understanding influence of each factors.

  • PDF