• Title/Summary/Keyword: Conditions of contract

Search Result 285, Processing Time 0.025 seconds

Terms of arbitration in Franchise Agreements (프랜차이즈 계약에서의 중재조항)

  • 윤선희
    • Journal of Arbitration Studies
    • /
    • v.13 no.2
    • /
    • pp.321-351
    • /
    • 2004
  • According to increase of Franchise Agreements, troubles related to those agreements and trading acts occur frequently. As Franchise system had come from Western countries, franchise agreement troubles tend to international disputes. In fact, those parties entered into a franchise agreement prefer arbitration to lawsuit as a dispute resolution system because arbitration is easy to risk-management for cost and time. The essential conditions for Franchise agreements are as follows ; for Franchise to grant Intellectual Properties to Franchisee, to give an impression of the same company between Franchise and Franchisee, to control and support Franchisee, for Franchisee to be an independent merchant, and to pay Franchiser license fee. Because Franchise Agreement is also based on liberty of contract, Franchise and Franchisee could enter into any kind of agreement. However, Franchiser can make an unfair agreement abusing a position of advantage. This paper check those unfair terms and conditions in Franchise agreement. Once they enter into an agreement, they should fulfil their contract. In case of trouble on performing the contract, both of them have to discuss to solve that trouble faithfully. But, they enter into either lawsuit or arbitration in accordance with agreement when they can't reach a decision in general. Specially, which is the most popular dispute resolution hands in case of Intellectual Property License agreement. General international Franchise Agreements have arbitration terms, but there is other case such as separate Arbitration Agreement if the want, which is separate from Franchise License agreement, so even though Franchise License agreement is invalidated, Arbitration agreement continues to exist, This paper reviews Franchise system and the terms of arbitration in Franchise agreement.

  • PDF

The Validity of Consumer Arbitration Agreement - Focusing on U.S. Cases - (소비자 중재합의의 유효성 - 미국판례를 중심으로 -)

  • PARK, Eunok
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.77
    • /
    • pp.43-67
    • /
    • 2018
  • Arbitration is one of alternative dispute resolution systems which settle a dispute by arbitrators(private persons) based on a contract between contracting parties without a judicial litigation system involved. As a valid arbitration agreement is an essential requirement for commencement of arbitration, the first thing to be determined is whether there is a valid arbitration agreement or not when a dispute is submitted. A consumer arbitration agreement usually exists as an arbitration clause in an adhesive contract between consumers and a seller. When consumers buy a product from a seller, they are requested to agree on a general terms and conditions which are unilaterally drafted by a seller in advance. These terms and conditions are not negotiable because it is an adhesive contract and consumers are placed in "take-it-or-leave-it" position. Therefore, even though there is an arbitration agreement between consumers and a seller, it has to be carefully considered whether it has a legal effect or not. In this respect, a court will examine if an arbitration agreement has procedural unconscionability and substantive unconscionability. Therefore, as U.S is a well-advanced and arbitration-friendly country, this paper analyzes four U.S cases to find out (i) what a court considers, (ii) how a court examines and interprets procedural and substantive unconscionability and (iii) if there has been a change in regard to a court's decision. By doing so, it will provide some suggestions and guidelines for a consumer arbitration in Korea.

  • PDF

A Study on the Status of Contract Managed Hospital Food Services (병원급식 위탁관리의 운영 실태조사)

  • Kim, Jin-Su;Yang, Il-Seon;Kim, Hyeon-A;Park, Mun-Gyeong;Park, Su-Yeon
    • Journal of the Korean Dietetic Association
    • /
    • v.9 no.2
    • /
    • pp.128-137
    • /
    • 2003
  • The purposes of this study were to investigate the current status of contracted hospital food services and to find out the difference in accordance with the number of beds in hospitals. Thirty six hospitals having more than 100beds in Seoul, Inchon and Kyungkido were the subjects of this study. Data was collected through surveys. The survey was conducted during March and April in 2002. The Questionnaires were mailed to the 36 directors of dietetic departments of the hospitals and 36 managers of contracting patient food services. Statistical analysis was completed using SPSS Win(11.0) for descriptive analysis and t-test. The results of the study are summerized as follows; Ⅰ. Hospital perspective : The range covered by contract food service was 63.3% and 36.7% in hospital food services, and medical nutrition services. The patient and employee food services were in 83.3%, and patient food services were in 6.7%. The methods selecting contractors are general, limited, selected and competitive biddings, and private contracts. The responsibility for supervision of contract food services was the dietetic department (51.7%) in most cases. Hospitals having personnel responsible for contracting affairs were in 75.9% of the cases and 24.1% did not have personnel. The biggest reason for contracting was facilitation of personnel management. The most important criteria on selecting food services contractors was the professionality of the contractor. Ⅱ. Contractor's perspective : The cost per meal in the year 2001 was composed of 1,905 won for food cost, 1,081 won for labor cost, 222 won for expenses, 114 won for VAT, 14 won for rent and 146 won for miscellaneous or controllable expense, representing 109 won loss per meal. The profit-and-loss contract cost is higher than the fee-contract cost. The ratios of food cost, labor cost and expenses are higher and the ratios of miscellaneous or controllable expense, VAT, rent and profit are lower in hospitals with more than 400 beds compared with those less than 400 beds. However, no significant differences are present between these two groups of hospitals. The actual contract period was 2.2 years upon initial contract and 1.2 years upon renewal. The initial investment cost was 53 million won and the cost of renovation and repair was 8.5 million won. Significant differences were present between two groups of hospitals. The conditions of employment and number of personnel hired by contractors for contract patient food services were significantly different according to the number of beds.

  • PDF

Valuation of highway O&M contract using real option (실물옵션을 활용한 고속 도로 유지관리 계약의 가치산정)

  • Park, Taeil;Shin, Eun-Young;Lee, Yoo-Sub
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.11
    • /
    • pp.5964-5970
    • /
    • 2013
  • The recent budget planning for highway infrastructure implied that the investments for Operation & Maintenance(O&M) became greater than that for new construction. This circumstance made many stakeholders pay attention to the O&M of road infrastructure and adopt other countries' policies and system for effective management. In other countries, most O&M for road infrastructure have been done by private entities using long-term contract and Korea is about to shift from one year contract to long-term contract. The most important parts for the expansion of the long-term O&M contract for road infrastructure are valuation of the O&M contract based on accurate prediction of O&M costs and instrument for proper risk sharing between contracting parties. Thus, this study provides a methodology to estimate a reasonable O&M contract price and a framework to share contract risk between contracting parties using real option. The analysis results showed that the contract price and ceiling and floor conditions for the 20 year-contract of 20 km-highway project were 45.7, 60 and 42.3 billion won, respectively.

Fresh Produce E-Commerce Supply Chain Coordination Considering Promotional and Freshness-Keeping Efforts

  • Xiaowei Hai;Tian Liao;Chanchan Zhao
    • Journal of Information Processing Systems
    • /
    • v.19 no.4
    • /
    • pp.513-526
    • /
    • 2023
  • Supply chain coordination plays a critical role in improving the enterprise performance and the competitive advantage of fresh e-commerce. This study explores the coordination problem of a two-echelon fresh produce e-commerce supply chain comprising a fresh e-commerce enterprise and a fresh supplier in a novel framework. In this framework, the fresh e-commerce sells fresh produce and provides promotion effort; meanwhile, the fresh supplier deliveries fresh produce and provides freshness-keeping effort. Specifically, the optimal decisions under centralized and decentralized decision-making are compared, and it is found that centralized decision-making is more profitable. Based on this work, we created a cost-sharing and revenue-sharing combination contract. This study demonstrates that this contract effectively coordinates the supply chain and makes both parties achieve Pareto optimization when the parameters meet certain conditions. Finally, the feasibility and validity of the contract are presented through a numerical example.

A study on Insurance Indemnity of Salvage award. (해난구조비의 보험보상에 관한 연구)

  • 이학헌
    • Journal of the Korean Institute of Navigation
    • /
    • v.18 no.2
    • /
    • pp.129-149
    • /
    • 1994
  • Sea casualties may happen in ship, cargo and the others concerned with sea transportation. : the shipo-wer, marine insurer and salvage company have been endeavored to compensate salvage award with some rule and regulation such as Marine Insurance Act, York Antwerp Rules and Average adjustment rules. Once sea casualties happened, the salvage contract is established between the owners, marine insurance and salvage company, the contract are divided into so many kinds of them. In this paper, we have an analysis on the character of the salvage contract whether the characteristic contents of them are in benefit to any party or not. In this connection with these positive or negative character of the contract, it is worthwhile to compare the actual salvage expenses contract with no cure no pay contract. LOF 1990 has been revised recently, which is based on no cure no pay, expecially, the special compensation, safety net clause of LOF 1990 could be understood in the view of the prevention of sea pollution and the preservation of sea circumstances in the world. Salvage has the complicated and quality, because the adjustment of almost salvage charges have been treated through the other sea casualties which is accompanied by and mixed with. Besides of the importance of salvage contracts, we are in need to understand that what the diversified character of salvage charges are. Furthermore the owners should carefully select the insured conditions on Hull Insurance according to the type of his company, operating ocean route, loading cargo and etc. In this paper, we would try to analyze the character of the salvage award such as General Average, Sue and Labour Charges and Particular charges. We would like to propose that the uniformed system of the salvage award. Compensation should be built up for the effective and efficient salvage operation and for reducing the claims and conflicts from the concerned parties. To this end, we could expect that the uniformed system for salvage award compensation will come to be the benefit of all owners, insurers, salvage company.

  • PDF

A Study on the Court's Recognition and Improvement of the Standard Contract Issues in the Media Entertainment Industry (미디어 엔터테인먼트산업의 표준계약서 쟁점 사항에 대한 법원의 인식과 개선방안에 관한 연구)

  • Park, Sung-Soon
    • Journal of Korea Entertainment Industry Association
    • /
    • v.15 no.3
    • /
    • pp.323-335
    • /
    • 2021
  • The purpose of this study is to organize issues of exclusive contracts for celebrities, which have been a major part of the existing industry, in preparation for various contract disputes in the media entertainment industry, and disputes in the media entertainment industry. According to the law case analysis conducted to achieve the purpose of the study, the court judged that the exclusive contract that did not conform to society's conventional wisdom was not effective, and that it was difficult to maintain the contract because it was not a normal contract. In addition, the court believed that unreasonable contracts using unfair trading status and overly long contracts were all reasons for termination. According to the court's judgment, the current standard contract requires about four revisions. First, clarification of contract termination conditions, second, clarification of payment date of revenue allocation, third, diversification of contract periods, and fourth, realistic modification of penalty provisions. Standard contracts have been enacted after several discussions, but there are still many things to revise and supplement. It will not end up with the preparation and use of contracts, but it will be necessary to continuously revise them to suit the industry's situation.

A Study on the Escalation Method for Contract Adjustment Public Construction Project (물가변동에 따른 계약금액 조정방식의 지수조정율 산출에 관한 연구)

  • Bae Kyoung-Tae;Choi Dong-Soo;Hwang Chi Won
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.11a
    • /
    • pp.117-120
    • /
    • 2005
  • The business market of architecture has got a system that controls a deposit according to the price function. This system is written on a law of contract about countries. So the main body of construction has to make a reasonable contract. This study is written about a rate of numerical index on controling a deposit. We tried to fine problems and solutions of labor expenses, instrument costs and material costs which is so big and changable on the construction market Labor expenses are expressed according to the rate of construction scale between direct and indirect cost that applies ability of works. Instrument costs are expressed according to an output method of a unit price annually and a weight allowance of local instrument conditions and use frequence. The last material costs expressed according to a local weight allowance make a decision of the material cost index. They applies locally relative index more than absolute one on what uses the price rate of producers and importations. This solutions are not enough to apply to the real market, so it needs to exam and to be on the market after a feasibility study.

  • PDF

The Analysis of Pine Stumpage Prices Based on Timber Sale Characteristics of the Southern United States

  • Kim, Hojung;Cieszewski, Chris
    • Journal of Forest and Environmental Science
    • /
    • v.31 no.1
    • /
    • pp.38-46
    • /
    • 2015
  • The stumpage price changes were calculated and analyzed from the data collected by Timber Mart-South from 1998 to 2007. We analyzed the relationship between pine sawtimber stumpage prices and timber sale characteristics using hedonic pricing method. Quadratic transformation was employed for sale size and contract length. Stumpage prices increased with sale size, contract length, bid sales, and the number of bidders. The presence of above average or excellent grade, market conditions, and logging conditions also are positively related to stumpage prices.

Optimizing a Construction Schedule Considering Cash-flow (현금 흐름을 고려한 건설일정 최적화에 관한 연구)

  • Lee, Hyung-Guk;Lim, Tae-Kyung;Son, Chang-Baek;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.303-305
    • /
    • 2012
  • This paper presents a system called a Cash-flow based Construction Scheduling Optimization (CfSO). The existing CPM is biased on schedule and cost management. For a profitable and successful project management, the cash-flow which occurred actually by contractual conditions should be considered in the project scheduling. Therefore, this study provides a method to estimate the amount of a cash-flow occurred periodically by integrating the terms of contract into scheduling. The proposed methodology is implemented as a system prototype in Microsoft Excel. CfSO helps a site manager as a decision-maker to establish a optimized project scheduling and decide profitable contractual conditions against a construction owner.

  • PDF