• Title/Summary/Keyword: Condition Based Maintenance

Search Result 587, Processing Time 0.027 seconds

Machine Diagnosis and Maintenance Policy Generation Using Adaptive Decision Tree and Shortest Path Problem (적응형 의사결정 트리와 최단 경로법을 이용한 기계 진단 및 보전 정책 수립)

  • 백준걸
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.27 no.2
    • /
    • pp.33-49
    • /
    • 2002
  • CBM (Condition-Based Maintenance) has increasingly drawn attention in industry because of its many benefits. CBM Problem Is characterized as a state-dependent scheduling model that demands simultaneous maintenance actions, each for an attribute that influences on machine condition. This problem is very hard to solve within conventional Markov decision process framework. In this paper, we present an intelligent machine maintenance scheduler, for which a new incremental decision tree learning method as evolutionary system identification model and shortest path problem as schedule generation model are developed. Although our approach does not guarantee an optimal scheduling policy in mathematical viewpoint, we verified through simulation based experiment that the intelligent scheduler is capable of providing good scheduling policy that can be used in practice.

A Study on the Development of Maintenance System for Equipment of LNG-FPSO Ship (LNG-FPSO 선박 장비들의 보전활동 지원시스템 개발에 관한 연구)

  • Lee, Soon-Sup;Kang, Donghoon;Lee, Jong-Hyun;Lee, Seung-Jun
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.22 no.2
    • /
    • pp.233-239
    • /
    • 2016
  • In this paper, a maintenance system is developed for LNG-FPSO topside and hullside equipment based CBM (Condition Based Maintenance) methodology. First, the development system defined the PWBS(Product Work Breakdown Structure) of major equipment of LNG-FPSO. Second, the development system developed the failure analysis, economic evaluation for optimal maintenance plan and database systems that save and manage information about equipment, failure mode, failure rate and failure cause. Finally, the verification of the development system was applied to the inlet system of topside and the pump tower system of hullside and the system was confirmed the effectiveness of CBMS(Condition Based Maintenance System).

The Method on Safety and Maintenance Based Domestic Infrastructure Facilities for Survey of Actual Condition (안전 및 유지관리기반 국내 인프라 실태조사 수행 방안)

  • Lee, Jeong-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.230-231
    • /
    • 2015
  • Recently, although researching and developing of safety and maintenance on domestic infrastructure facilities in KOREA are important, there has been very little research regarding on a comprehensive and integrated survey of actual condition. Therefore this study asserts the necessity of the survey process of actual condition by period planning(short-term, middle-term, long-term). The purpose of this study is to investigate current situation and to suggest the whole process method, and to establish survey process of actual condition on domestic infrastructure facilities.

  • PDF

Developing the Optimal Decision-Making Process through Preventive Maintenance Policy Based on the Reliability Threshold for Leased Equipment (대여장비의 신뢰도 기반 예방보전 정책을 통한 최적 의사결정 과정 개발)

  • Bae, Kiho;Lee, Juhyun;Park, Seonghwan;Ahn, Suneung
    • Journal of Applied Reliability
    • /
    • v.17 no.3
    • /
    • pp.246-255
    • /
    • 2017
  • Purpose: This study proposes the optimal PM (preventive maintenance) policy of leased equipment for lessee's decision-making using two types of reliability condition. Methods: We consider reliability threshold based PM model. Equipment reliability is estimated and used as condition variable. The effect of repair for maintenance is imperfect and represented by age reduction factor. Results: We provide two PM policies. Policy 1 is focused on minimized total cost. This policy guarantees reliability threshold until last maintenance action. Policy 2 focus on maintaining reliability threshold during leased period. The proposed approach provides optimal reliability threshold under number of PM. Through result, we finally construct decision-making process for lessee using reliability threshold and end of reliability. Conclusion: This study provides two PM policy for lessee's decision-making. Through numerical example, we get a result of optimal reliability threshold, number of PM, optimum alternative under lessee's reliability condition.

Comparison of Asset Management Approaches to Optimize Navigable Waterway Infrastructure

  • Oni, Bukola;Madson, Katherine;MacKenzie, Cameron
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.3-10
    • /
    • 2022
  • An estimated investment gap of $176 billion needs to be filled over the next ten years to improve America's inland waterway transportation systems. Many of these infrastructure systems are now beyond their original 50-year design life and are often behind in maintenance due to funding constraints. Therefore, long-term maintenance strategies (i.e., asset management (AM) strategies) are needed to optimize investments across these waterway systems to improve their condition. Two common AM strategies include policy-driven maintenance and performance-driven maintenance. Currently, limited research exists on selecting the optimal AM approach for managing inland waterway transportation assets. Therefore, the goal of this study is to provide a decision model that can be used to select the optimal alternative between the two AM approaches by considering key uncertainties such as asset condition, asset test results, and asset failure. We achieve this goal by addressing the decision problem as a single-criterion problem, which calculates each alternative's expected value and certain equivalence using allocated monetary values to determine the recommended alternative for optimally maintaining navigable waterways. The decision model considers estimated and predicted values based on the current state of the infrastructure. This research concludes that the performance-based approach is the optimal alternative based on the expected value obtained from the analysis. This research sets the stage for further studies on fiscal constraints that will effectively optimize these assets condition.

  • PDF

Case Studies of a Performance-Based Contract for National Highway Pavement Maintenance (성능보증제도를 적용한 일반국도 유지보수공사 시범사업)

  • Lim, Jaekyu;Kim, Yongjoo;Kim, Myeongil;Lee, Jaejun
    • International Journal of Highway Engineering
    • /
    • v.20 no.1
    • /
    • pp.1-8
    • /
    • 2018
  • PURPOSES : Case studies of an asphalt-overlay project with a performance-based contract method were conducted on a national highway in Korea to evaluate the effect of the method on asphalt pavement maintenance. This study evaluated the procedure of the performance-based contract method. METHODS : In this study, an asphalt-pavement maintenance project for a national highway was assessed with a performance-based contract to investigate the advantage of the new contract procedures. This is the first trial applying the performance-based contract to a pavement-rehabilitation project in Korea. In the four case studies, the warranty period of the performance-based contract was designed for seven years. The research team monitored the construction site to compare the normal contract method with the performance-based contract method. The case studies' project sites were investigated after the end of the construction. RESULTS : Based on the limited case studies, the performance-based contract method could extend the service life of the asphalt pavement and reduce the pavement-maintenance budget because the quality control was well managed by the contractors. However, a few construction laws would be necessary to apply the performance-based contract method in the future. CONCLUSIONS : Using the performance-based contract, the construction company made great efforts to guarantee the warranty period and to apply the optimal maintenance method, based on the pavement distress condition. The contractor and the agency would need to understand the new performance-based contract system for it to be activated. Therefore, a proper education program for the performance-based contract system would be needed to educate the stakeholders regarding the procedures and their effects on the pavement management and maintenance.

Development of a 3D-Graphics Based Visualization Application for Reliability-Centered Maintenance (신뢰도 중심 유지보수 기법을 이용한 3차원 기반의 변전소 유지보수 시각화 프로그램 개발)

  • Jung, Hong-Suk;Park, Chang-Hyun;Jang, Gil-Soo
    • Proceedings of the KIEE Conference
    • /
    • 2007.11b
    • /
    • pp.288-290
    • /
    • 2007
  • This paper presents a visualization application using 3D-graphics for effective maintenance of power equipment. The maintenance algorithm implemented in the application is based on Condition-Based Maintenance (CBM) and Reliability -Centered Maintenance (RCM). The main frame of the developed application was made up based on Windows Application Programming Interface (API) and Microsoft Fundamental Classes (MFC). In order to develop the interactive 3D application, the WorldToolKit (WTK) library based on Open GL was used. Also Text-to-Speech (TTS) technology was used to enhance the efficiency of operators. The developed application can help the power system operators to intuitively recognize the present state and maintenance information of the equipment.

  • PDF

Development of a 3D-Graphics Based Visualization Application for power equipments Maintenance (3차원 그래픽을 이용한 설비 유지보수 시각화 프로그램 개발)

  • Jung, Hong-Suk;Park, Chang-Hyun;Jang, Gil-Soo
    • Proceedings of the KIEE Conference
    • /
    • 2006.11a
    • /
    • pp.246-248
    • /
    • 2006
  • This paper presents a visualization application using 3D-graphics for effective maintenance of power equipments. The maintenance algorithm implemented in the application is based on Condition-Based Maintenance (CBM) and Reliability-Centered Maintenance (RCM). The main frame of the developed application was made up based on visual C++ (MFC). In order to develop the interactive 3D application, the WorldToolKit library based on Open GL was used. The developed application can help the power system operators to intuitively recognize the present state and maintenance information of the equipments.

  • PDF

A Study on Condition-based Maintenance Policy using Minimum-Repair Block Replacement (최소수리 블록교체 모형을 활용한 상태기반 보전 정책 연구)

  • Lim, Jun Hyoung;Won, Dong-Yeon;Sim, Hyun Su;Park, Cheol Hong;Koh, Kwan-Ju;Kang, Jun-Gyu;Kim, Yong Soo
    • Journal of Applied Reliability
    • /
    • v.18 no.2
    • /
    • pp.114-121
    • /
    • 2018
  • Purpose: This study proposes a process for evaluating the preventive maintenance policy for a system with degradation characteristics and for calculating the appropriate preventive maintenance cycle using time- and condition-based maintenance. Methods: First, the collected data is divided into the maintenance history lifetime and degradation lifetime, and analysis datasets are extracted through preprocessing. Particle filter algorithm is used to estimate the degradation lifetime from analysis datasets and prior information is obtained using LSE. The suitability and cost of the existing preventive maintenance policy are each evaluated based on the degradation lifetime and by using a minimum repair block replacement model of time-based maintenance. Results: The process is applied to the degradation of the reverse osmosis (RO) membrane in a seawater reverse osmosis (SWRO) plant to evaluate the existing preventive maintenance policy. Conclusion: This method can be used for facilities or systems that undergo degradation, which can be evaluated in terms of cost and time. The method is expected to be used in decision-making for devising the optimal preventive maintenance policy.

Establishment of Preventive Maintenance Planning for Generation Facility Considering Cost (비용을 고려한 발전설비의 예방유지보수 계획 수립)

  • Kim, Hung-Jun;Shin, Jun-Seok;Kim, Jin-O;Kim, Hyung-Chul
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2007.05a
    • /
    • pp.328-333
    • /
    • 2007
  • Traditional maintenance planning is based on a constant maintenance interval for equipment life. In order to consider economic aspect for tm based preventive maintenance, preventive maintenance is desirable to be scheduled by RCM(Reliability-Centered Maintenance) evaluation. The main objective of RCM is to reduce the maintenance cost, by focusing on the most important functions of the system and avoiding or removing maintenance actions that are not strictly necessary. So, Markov state model is utilized considering stochastic state in RCM In this paper, a Markov state model much can be used for scheduling and optimization of maintenance is presented. The deterioration process of system condition is modeled by the stepwise Markov model in detail. Also, because the system is not continuously monitored, the inspection is considered. In case study, simulation results about RCM will be shown using the real historical data of combustion turbine generating unit in Korean power systems.

  • PDF