• Title/Summary/Keyword: Concrete road pavement

Search Result 505, Processing Time 0.025 seconds

A Study on the Ecological Pavement using Road Compound (Road Compound 공법을 적용한 환경친화형 포장에 관한 연구)

  • 하상우;최연왕;신화철
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2003.05a
    • /
    • pp.59-64
    • /
    • 2003
  • As the economy of a country develops, the necessity for social overhead capital such as railroad, highway and other transportation infrastructures becomes an utmost issue as the volume of traffic increases. As the standard of living has been raised the needs for ecological road pavement also increase. As a matter of fact, the concrete and asphalt pavement have been constructed without considering the harmony with nature. The Road Compound pavement is constructed with local soils from optimum mixture proportions that did not contaminate the surroundings and represent the ecological pavement.

  • PDF

Drainage concrete pavement work (배수성 콘크리트 포장 공법)

  • 황익현
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1999.10a
    • /
    • pp.861-868
    • /
    • 1999
  • Drainage concrete pavement, unlike water permeable concrete pavement, is to preclude the pavement from overflowing with water, such as rain water, from infiltrating into earth by placing a border in the middle layer which makes water to flow through the surface of the border to the conduit. Drainage concrete pavement enhances car wheel resistance to slippery and wet road surface and imbibes noise caused by friction on the road. Also, by using pigment, it adds to the beauty of the environment. Drainage concrete pavement can be used for sidewalks, roadways, parking lots and expressways.

  • PDF

A Study on the Properties of Roller Compacted Concrete Pavement for Environmental Friendly Bike Road (친환경 자전거도로를 위한 롤러 다짐 콘크리트 포장의 기초물성에 관한 연구)

  • Lee, Chang-Ho;Kang, Jae-Gyu;Park, Cheol-Woo;Lee, Seung-Woo
    • International Journal of Highway Engineering
    • /
    • v.12 no.3
    • /
    • pp.103-111
    • /
    • 2010
  • Recently, usage bicycle has been encouraged to reduce energy consumption and $CO_2$. For this purpose, lots of bike road construction are planned. Typical type of pavement used in bikeroad such as asphalt concrete pavement, portland cement concrete pavement, colored pavement, soil pavement. However, these pavement types may need high construction cost comparing the required capacity of bike road. In this study, roller compacted concrete pavement which are economical and durable, are investigated to use as bike road pavement. The optimum compaction level and mix design of roller compacted concrete pavement are suggested by exploring strength test with various mixture ratio and compaction level, Also durability was examined based on freeze-thaw and scaling test. In addition, the cost and amount of carbon emission during in the construction of roller compacted concrete were evaluated and compare with the cost and carbon emission of typical portland cement concrete.

Introduction of PCC Pavement Sections and Associated Research in KHC Test Road

  • Kim, Ji-Won;Kwon, Soon-Min;Lee, Jae-Hoon;Kim, Do-Wan
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2003.05a
    • /
    • pp.197-203
    • /
    • 2003
  • Korea Highway Corporation(KHC) began the ambitious KHC Test Road construction project from 1997. It is 7.7km long two-lane highway next to the mainline of Jungbu Inland Expressway. The KHC Test Road construction was completed at the December 2002. It is composed of twenty-five PCC test pavement sections. Section design parameters are (1) concrete slab thickness, (2) base type, (3) base thickness (12, 15, and 18cm), and (4) pavement type. Twenty-five PCC test pavement sections contain 1241 sensors to evaluate the behavior of pavement system under traffic load and environmental change. The behavior of pavement systems will be identified by the observation of sensor measurement and pavement distress survey from test pavement sections. The Test Road research outcome will validate the Korean Pavement Design Guide which is develop by on-going funded research from the Ministry of Construction and Transportation.

  • PDF

A Study on Design of High Early Strength Cement and Concrete for Road Way Pavements (신속개방형 콘크리트 도로포장재의 설계를 위한 실험실적 평가 연구)

  • 임채용;엄태선;신국재;이종열;엄주용;조윤호
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.05a
    • /
    • pp.295-300
    • /
    • 2001
  • In road pavements, it is known that cement concrete pavement has superior durability, safety in compared with asphalt concrete pavement. But in reparing pavement cement concrete pavement is not usually applied because of the length of time while the road is interrupted when using Ordinary and Rapid-hardening Portland Cement. And Super High Early Strength Cement and Ultra Super High Early Strength Cement are not favorable for ready mixied concrete because of rapid setting time, high slump loss and other restrictions. We aim to develope specific cement and concrete developing 1 day strength of over 300 kg/$cm^{2}$ to open the road within one day and workable time is maintained over 1 hour that can be used as ready mixed concrete. In this study, we Produced cement using rapid-hardening cement, Hauyne clinker, anhydride gypsum and accelerator and studied on its properties. The concrete strength was over 300 kg/$cm^{2}$ at 1 day and 550 kg/$cm^{2}$ at 28 day and workable time was maintained for over 1 hour.

  • PDF

A Study on Evaluation of High Early Strength Concrete as Pavement Overlay Materials for Early Traffic Opening(2) (신속개방형 콘크리트 도로포장재의 설계를 위한 평가 연구(2))

  • 엄태선;임채용;유재상;이종열;엄주용;조윤호
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.11a
    • /
    • pp.233-238
    • /
    • 2001
  • In road Pavements, it is known that cement concrete pavement has superior durability, safety compared with asphalt pavement. But in repairing pavement, cement concrete pavement is not usually applied because of the length of time while the road is interrupted when using Ordinary and Rapid-hardening Portland Cement. And Super High Early Strength Cement and Ultra Super High Early Strength Cement are not favorable for ready mixed concrete because of rapid setting time, high slump loss and other restrictions. We aim to develope special cement and concrete developing 1 day strength of over 300 kg/$\textrm{cm}^2$ to open the road within one day and workable time is maintained over 1 hour that can be used as ready mixed concrete. In this study, we produced cement using rapid-hardening cement, Hauyne clinker, anhydride gypsum and accelerator and studied on its properties. The comperssive strength was over 400 kg/$\textrm{cm}^2$ and tensile at 1 day and workable time was maintained for over 1 hour.

  • PDF

About Quiet Pavement Technologies in Korean Highway (국내 고속도로의 저소음포장 기술 동향)

  • Mun, Sung-Ho;Hong, Seung-Ho;Cho, Dea-Seung;Kim, Chul-Hwan
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2008.04a
    • /
    • pp.491-495
    • /
    • 2008
  • The effects of vehicles and pavement surface types on noise have been investigated at the Korea Expressway Corporation's Test Road along the southbound side of the Jungbu Inland Expressway, South Korea. The study was conducted in 2005 and 2006 through field measurements at nine surface sections of asphalt concrete and Portland cement concrete pavements using eleven vehicles. For the road noise analysis, the sound power levels (PWLs) of combined noise (e.g., tire/pavement interaction noise and power-train noise together) and tire/pavement interaction noise using various vehicles were calculated based on the novel close proximity (NCPX) and pass-by methods. Then, the characteristics of the PWLs were evaluated according to surface type, vehicle type, and vehicle speed. The results show that the PWLs of vehicles are diversely affected by vehicle speed and the condition of the road surface.

  • PDF

Estimation of Tire-Pavement Noise for Concrete Pavement by using Mean Profile Depth (Mean Profile Depth를 이용한 콘크리트 포장의 타이어-노면소음 산정)

  • Hong, Seong Jae;Hyun, Tak Jib;Lee, Seung Woo;Kim, Hyung Bae;Kwon, Oh Sun
    • International Journal of Highway Engineering
    • /
    • v.15 no.3
    • /
    • pp.9-16
    • /
    • 2013
  • PURPOSES: There is a need to develop a method to incorporate tire-pavement noise in the pavement management system. Tire-pavement noise highly depends on the characteristics of pavement texture. Therefore, estimation of texture characteristics may give useful information to predict tire-pavement noise. This study aimed to find the relationship between tire-pavement noise and MPD(Mean Profile Depth) for concrete pavement. METHODS: MPD and tire-pavement noise were collected on the number of expressway sections including Central Inland Test Road in Korea. Statistical analysis was performed to find the correlationship between MPD and tire-pavement noise. In addition, multiple regression analysis to find the tire-pavement noise based on MPD and type of concrete pavement texture. RESULTS: Linear relationship between MPD and tire-pavement noise is observed for concrete pavement. Furthermore, a forensic equation to estimate tire-pavement noise based on MPD and texture types of concrete pavement is suggested. CONCLUSIONS: Tire-pavement noise on concrete pavement can be predicted based on the consideration of texture type and MPD estimation.

Temperature Reduction of Concrete Pavement Using Glass Bead Materials

  • Pancar, Erhan Burak;Akpinar, Muhammet Vefa
    • International Journal of Concrete Structures and Materials
    • /
    • v.10 no.1
    • /
    • pp.39-46
    • /
    • 2016
  • In this study, different proportions of glass beads used for road marking were added into the concrete samples to reduce the temperature gradient through the concrete pavement thickness. It is well known that decreasing the temperature gradient reduces the risk of thermal cracking and increases the service life of concrete pavement. The extent of alkali-silica reaction (ASR) produced with partial replacement of fine aggregate by glass bead was investigated and compressive strength of concrete samples with different proportion of glass bead in their mix designs were measured in this study. Ideal results were obtained with less than 0.850 mm diameter size glass beads were used (19 % by total weight of aggregate) for C30/37 class concrete. Top and bottom surface temperatures of two different C30/37 strength class concrete slabs with and without glass beads were measured. It was identified that, using glass bead in concrete mix design, reduces the temperature differences between top and bottom surfaces of concrete pavement. The study presented herein provides important results on the necessity of regulating concrete road mix design specifications according to regions and climates to reduce the temperature gradient values which are very important in concrete road design.

A Study on the quality of High Early Strength Concrete as Whitetopping Materials (Whitetopping 포장재의 시험포설 및 시공품질에 대한 평가연구)

  • 임채용;엄태선;유재상;이종열;엄주용;조윤호
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.10a
    • /
    • pp.507-512
    • /
    • 2002
  • In road pavements, it is known that cement concrete pavement has superior durability. But in repairing pavement, cement concrete pavement is not usually applied because of the length of time while the road is interrupted when using Ordinary and Rapid-hardening Portland Cement. And Super High Early Strength Cement and Ultra Super High Early Strength Cement are not favorable for ready mixed concrete because of rapid setting time, high slump loss and other restrictions. We developed special cement developing 1 day strength of over 30.0N/$mm^2$ to open the road within 1 day and workable time is maintained over 1 hour so that it can be used as ready mixed concrete. We performed experimental overlay construction with concrete and evaluated the properties of the fresh and hardened concrete. The flexural strength was over 5.0N/$mm^2$ and the compressive strength was over 30N/$mm^2$ at 1 day. So it is thought that the road can be open to traffic within 1 day after placement.

  • PDF