A study on the establishment of stress limit values of management monitoring in tunnel (터널 유지관리계측의 응력 관리기준치 설정에 관한 연구)

  • Woo, Jong-Tae
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.1
    • /
    • pp.25-32
    • /
    • 2015
  • This study analyzed a monitoring data, based on the initial limit values of monitoring in subway, of concrete lining stress and reinforcement stress. The data is obtained from 7 sections of the Seoul metropolitan subway line No 6, 7, and 9 in about 5 years. Also, a research is performed to set up the limit values of management monitoring, which will be applied to management monitoring in tunnel, through comparing the limit values of overseas management monitoring data and that of domestic management monitoring data. And the result obtained from comparison shows that the safety phase is 60% of allowable stress, the attention phase is 80% of allowable stress and the precision analysis phase is 100% of allowable stress. Also, we presented a method of management monitoring by the absolute value which can be easily applied in practical affairs.

Numerical Analysis of Concrete Lining and Rockbolt Behavior of the Tunnel Associated with Blast-induced Vibration (발파진동으로 인한 터널 콘크리트 라이닝과 록볼트 거동의 수치해석적 분석)

  • Jeon, Sang-Soo;Jang, Yang-Won
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.9 no.5
    • /
    • pp.69-78
    • /
    • 2009
  • Since the blast vibration induced by explosives of the powder possibly provide damage of the nearby structures adjacent to the tunnel, the stability of the nearby structures should be estimated. In this study, the stability of the tunnel based on the allowable peak particle velocity of the structures as well as allowable stress of the structures presented in the concrete structural design standard was estimated with respect to the stress of the concrete lining and axial force of the rockbolt during the blasting operation at the ground surface of the pre-existing tunnel. The analyses were carried out by using $FLAC^{2D}$ which is one of the programs developed based on the finite difference method. The bending compressive stress and shear stress of the concrete lining and axial force of the rockbolt were rapidly increased when the blasting operation was conducted near the tunnel.

Numerical Analysis of Tunnel Lining under Loosening Load (수치해석을 통한 이완하중에 따른 터널 라이닝의 거동 분석)

  • Park, Jung-Jin;Kim, Yong-Min;Hwang, Taik-Jean;Jeong, Sang-Seom
    • Journal of the Korean Geotechnical Society
    • /
    • v.27 no.7
    • /
    • pp.35-45
    • /
    • 2011
  • Cost effective design and construction are necessary to establish the design concept of tunnel lining. Loosening load acting on the concrete lining is compared with Terzaghi tunnel theory and numerical analysis. It is analyzed under the condition of weathered rock and soil with varying in-situ stress ratio ($K_0$). Based on the result, loosening load calculated by Tcrzaghi tunnel theory is much greater than numerical analysis results. And the load calculated in weathered soil is lager than weathered rock condition. As in-situ stress ratio increases, the stress acting on the tunnel lining decreases in Terzaghi theory rapidly, whereas there is little effect in numerical analysis.

A Safety Analysis of Tunnel Lining for Monitoring (계측에 의한 터널 라이닝의 안전성 분석)

  • Woo, Jong-Tae;Lee, Song
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.6 no.3
    • /
    • pp.103-110
    • /
    • 2002
  • Maintenance monitoring of the tunnel which offers continuous data during and after tunneling has been applying to tunnels in order to meet the maintenance of tunnel and to confirm continuous security of the tunnel after tunneling. But, the maintenance monitoring of tunnel results for long period is not easy to find, and moreover, the rational analysis method on tunnel monitoring has not been established yet. In this study, the relationships between displacement and stress of the tunnel concrete lining using various analysis methods are compared with maintenance monitoring. The tunnel behavior were measured in the subway tunnel passing comparative soft the weathering and analyzed both security and mechanical characteristics of the tunnel concrete lining. Also, analyzed relationship between residual water pressure applied on tunnel design and one obtained by monitoring.

An Experimental Study on the Behaviour of Tunnel Excavated in a Homogeneous Ground by Two-Stage Excavation (균질지반에서 2단계로 굴착되는 터널의 거동특성에 대한 실험적 연구)

  • 김동갑;박승준;이상덕
    • Tunnel and Underground Space
    • /
    • v.14 no.5
    • /
    • pp.345-352
    • /
    • 2004
  • In a shotcrete support system, the cooperation of the ground and the shotcrete lining makes it possible to transfer the shear stress to the shotcrete lining, which is dedicated to form a stable structure. In this study, a homogeneous model ground with constant strength was produced by using gypsum and the tunnel was excavated with a top heading method under the definite initial stress. During the excavation, the stress in the ground around the tunnel and the deformation of shotcrete lining were measured, The tensile stress was generated in tangential direction in the ground near the tunnel and in the shotcrete lining due to tunnel excavation. This shows the unified behavior of the ground and shotcrete lining, which is the most typical characteristic of the shotcrete support. As a result, the rates of in-situ stress during the excavation at a top boundary line was 9% and at top arch heading 15%. It was 48% right after excavating the heading and 94% before cutting the bench.

A Study on the Concrete Lining Behavior due to Tunnel Deterioration (터널 열화로 인한 콘크리트 라이닝의 거동에 관한 연구)

  • Han, Young-Chul;Jeong, Sang-Seom
    • Journal of the Korean Geotechnical Society
    • /
    • v.30 no.4
    • /
    • pp.21-34
    • /
    • 2014
  • This paper studies the time-dependent behaviors of tunnel and surrounding ground due to tunnel deterioration. In the first part, the literature on deterioration characteristics of tunnels was reviewed. In the second part, a numerical analysis was performed to investigate the behavior of concrete lining on the typical section of Korean high-speed rail tunnel (weathered rock) after determination of input variables related to deterioration impact. The result shows that the settlement at the crown of tunnel and surface ground increased up to 7.0% and 30.2% of the total settlements during construction stage, respectively, and the internal convergence reduction of 9.0 mm for concrete linings was generated within 30 years after completion of tunnel construction. Also the loosening height increased up to 2.55 times of tunnel height within 50 years, which is higher than that of Terzaghi's recommendation on ultimate state. Due to this process of extending zones, it is found that additional loads were applied to concrete lining with the axial stress about 3.20~3.66 MPa, which accelerates tunnel deterioration. Finally the quantitative design approach to evaluate time-dependent behavior of lining and surrounding ground due to tunnel deterioration was proposed.

Assessment of long-term behaviour of a shallow tunnel in clay till

  • Wang, Z.;Wong, R.C.K.;Heinz, H.
    • Geomechanics and Engineering
    • /
    • v.2 no.2
    • /
    • pp.107-123
    • /
    • 2010
  • Ground settlements and pore pressure changes were monitored around a shallow tunnel constructed in clay till during the excavation and primary lining installation. The settlements above the tunnel continued to develop for up to 100 days after the primary lining installation. Triaxial compression tests were carried out to estimate the short-term and long-term deformation characteristics of the till. Numerical simulation was conducted to history match the field measurements, and thus, to quantify the settlements induced by ground stress relief, consolidation and creep. It was found that the surface settlements due to ground stress relief, consolidation and creep are 17, 12 and 71% of total settlement (about 44 mm), respectively. In addition, early installation of rigid concrete lining could be an effective means to reduce the settlement due to creep.

Concrete Lining Behaviors of Subway Tunnels according to Temperature Variations (온도변화에 따른 지하철 터널의 콘크리트 라이닝 거동)

  • Yoo, Ji-Hyeung;Lee, Seung-Won;Kim, Dae-Sung
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.6
    • /
    • pp.410-414
    • /
    • 2014
  • In this study, the behavior of urban subway tunnels is measured using instrumentation sensors installed in the lining concrete inside subway tunnels in order to analyze their behavior according to temperature variations. It is observed that the stresses of the concrete lining, tunnel convergence, and cracks change according to the temperature variations. However, the crack deformation differs depending on the size and status of the crack. In addition, this study proposes a correction formula for the lining stress and tunnel convergence through numerical analyses of the concrete lining according to the temperature variations. The results of this research can be used in the tunnel maintenance considering the tunnel behavior depending on the temperature variations in the tunnel.

Development of design charts for concrete lining in a circular shaft (원형수직구 콘크리트라이닝 단면설계도표 개발)

  • Shin, Young-Wan;Kim, Sung-Soo;Kim, Young-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.12 no.2
    • /
    • pp.165-175
    • /
    • 2010
  • Recently, requirement of a long subsea tunnel has increased due to political, economical and social demands such as saving of distribution costs, improvement of traffic convenience, and regional development. Road and railroad tunnel need a shaft for construction and ventilation because of increase of tunnel length. Shaft diameter, lining sectional thickness and rebar quantity have to be determined for design of concrete lining in the shaft. A lot of structural analyses are needed for optimal design of concrete lining considering shaft diameter, load conditions and ground conditions. Design charts are proposed by structural analyses for various conditions in this study. A sectional thickness and rebar quantity can be easily determined using the proposed design charts.

Analysis of Tunnel Lining Behavior under Tunnel Load (이완하중을 받는 터널라이닝의 거동분석)

  • Park, Jung-Jin;Kim, Do-Hyun;Jeong, Sang-Seom
    • Journal of the Korean Geotechnical Society
    • /
    • v.28 no.8
    • /
    • pp.79-88
    • /
    • 2012
  • In this study, the tunnel loads acting on the concrete lining are analyzed by comparing three methods - Terzaghi table, Terzaghi formula and Ground-Lining Interaction (G.L.I) model. The tunnel loads are analyzed by FLAC 2D. And the G.L.I model is analyzed under various rock mass ratings, tunnel depths (20~80m) and in-situ stress ratios ($K_0$=0.5~2.0). Terzaghi's method can be applied only to weathered rocks and soils, and cannot reflect the effect of various tunnel depths and in-situ stress ratio. The proposed G.L.I model can not only be applied to various ground conditions, but also relieves the tunnel loads by up to 30%.