• Title/Summary/Keyword: Conceptual Construction

Search Result 402, Processing Time 0.025 seconds

A Study on the Key Factors Influencing the Reliability of Conceptual cost estimates in Building Construction Projects (건축 프로젝트 개산견적 신뢰도에 영향을 미치는 주요 인자에 관한 연구)

  • An, Sung-Hoon;Park, U-Yeol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.4
    • /
    • pp.53-59
    • /
    • 2008
  • Cost estimates are very important to their decision-making in the early stages of a construction project. So Clients have wanted not only to know the results of conceptual cost estimates but also to assess their quality Conceptual cost estimates process is very complex process, so the results of cost estimates are influenced by various factors. So the purpose of this study is to reveal the key factors which influence the reliability of conceptual cost estimates in building construction projects. The analytic hierarchy process is used to determine the relative important weights of elements influencing the conceptual cost estimates. And factor analysis is used to reveal the key factors from the elements that influence the conceptual cost estimates. The results showed that the key factors is an experience level, available data level, level of will for winning the bid, difficulty level of conceptual cost estimate, uncertainty level.

Case Frames of the Old English Impersnal Cnstruction: Conceptual Semantic Analysis

  • Jun, Jong-Sup
    • Language and Information
    • /
    • v.9 no.2
    • /
    • pp.107-126
    • /
    • 2005
  • The impersonal or psyc-predicate construction in Old English (=OE) poses a special challenge for most case theories in generative linguistics. In the OE impersonal construction, the experiencer argument is marked by dative, accusative, or nominative, whereas the theme is marked by nominative, genitive, or accusative, or by a PP. The combinations of possible cases for experiencer and theme are not random, bringing about daunting complexity for possible and impossible case frames. In this paper, I develop a conceptual semantic case theory (a la Jackendoff 1990, 1997, 2002; Yip, Maling, and Jackendoff 1987) to provide a unified account for the complicated case frames of the OE impersonal construction. In the conceptual semantic case theory, syntax and semantics have their own independent case assignment principles. For impersonal verbs in OE, I propose that UG leave an option of determining either syntactic or semantic case to lexical items. This proposal opens a new window for the OE impersonal construction, in that it naturally explains both possible and impossible case frames of the construction.

  • PDF

Development of the Selection of Optimal Conceptual Design for the Noise-reduced Aluminum System Form

  • Hong, Jong Hyun;Yeom, Dong Jun;Seo, Jung Hoon;Kim, Young Suk
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.708-709
    • /
    • 2015
  • In Korea, a series of noise-reduced aluminum forms are being recently used in apartment housing construction. However, their complicated and time-consuming work processes, and the noise which is still generated due to the inherent property of aluminum when especially installing and dismantling them are have been pointed out as a problem to be certainly solved for increasing their practical use in construction sites. The primary objectives of this study are to propose a conceptual design of a newly designed noise-reduced aluminum form in which the noise can be enormously decreased during form works. The conceptual design in this study improved problems of conventional system aluminum forms, and, later, a system aluminum form developed based on this conceptual design will be able to ensure noise-reduction and safety as well as excellent applicability.

  • PDF

A CONCEPTUAL FRAMEWORK FOR CONCURRENT CONSTRUCTION PLANNING

  • Euysup Shim;Kenneth Reinschmidt
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.440-448
    • /
    • 2009
  • Concurrent construction (or overlapping) is an alternative project delivery process to reduce time-tomarket such that the owner can get higher profits; the increased profits due to shortened project duration would exceed the loss of profits from the increased cost, if any. For more effective concurrent construction, a new conceptual framework for concurrent construction planning is suggested. With multiple work methods available in each activity, the performance of overlapping between two activities in terms of cost is affected by the compatibility between work methods selected and the benefit to the project owner is determined by internal rate of return (RoR). The impact of the compatibility between work methods and the conceptual framework are explained by a hypothetical case study.

  • PDF

A Conceptual Design of Around View Monitoring System for Construction Equipment

  • Yeom, Dong Jun;Seo, Jung Hoon;Hong, Jong Hyun;Kim, Young Suk
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.662-663
    • /
    • 2015
  • Despite the improvement of productivity and cost, the operating of such equipments yet has been recognized as a 3D business which is a low wage and poor working environment business field. Accordingly, the number of such operators has been decreasing by time. Especially, construction equipment demands higher controlling skills and occasionally involved in critical accidents. Therefore, this study aims to suggest a conceptual design for an construction equipment Around View Monitoring system that visually assists the operator for more efficient operating. It is expected that the application of such technology for a construction equipment highly improves the productivity and work quality, moreover, prevents disastrous accidents that occur to labors.

  • PDF

Development of Reliability for Conceptual Cost Estimates in Construction Projects (건축프로젝트 개산견적 신뢰도 향상 방안)

  • An, Sung-Hoon;Kang, Kyung-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.175-180
    • /
    • 2006
  • Total conceptual cost estimates and the assessment of the reliability of these estimates are critical in the early stages of a building construction project. The purpose of this study is to propose the method to clients or estimators for improving the reliability of conceptual cost estimates by evaluating the reliability of conceptual cost estimates. The data from 83 building construction projects were collected for this study. The results showed that the proposed method can propose alternatives to clients or estimators for improving the reliability of conceptual cost estimates with the process of evaluation, review and feedback. This process can assist clients in their evaluation of the reliability of the estimated cost and the probability of exceeding the target cost, and in their re-estimation after dealing with the elements that influence the conceptual cost estimate badly.

  • PDF

A Study on the process for Managing the Reliability of Conceptual cost estimates in Building Projects (건축 프로젝트 개산견적 신뢰도 관리 프로세스에 관한 연구)

  • An, Sung-Hoon;Kim, Dae-Won;Park, U-Yeol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.2
    • /
    • pp.133-138
    • /
    • 2010
  • Conceptual cost is estimated with insufficient information at an early stage of a building construction project, resulting in an inevitable gap between conceptual estimated cost and real constructed cost. For a project to be successful, this gap must be managed to be lower than a reliable level. Therefore, the purpose of this study is to propose a structural process for managing the reliability of conceptual cost estimates at an early stage of a building construction project. In researching this study, conceptual cost estimate experts were interviewed,and a risk management process was studied. Reliability assessment and a review process for improving the quality of conceptual cost estimate and the planning strategy of reliability management based on previous similar projects were added to the present estimate process. The proposed reliability management process will improve the chances of a successful project, by helping to decrease the risk of conceptual estimated cost.

A RESEARCH ANALYSIS ON EFFECTIVE LEARNING IN INTERNATIONAL CONSTRUCTION JOINT VENTURES

  • L.T. Zhang;W.F. Wong;Charles Y.J. Cheah
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.450-458
    • /
    • 2007
  • This paper presents the results of a statistical analysis and its research findings focusing on the learning aspect in the process of international joint ventures (IJVs). The contents of this paper is derived from a sample of 96 field cases based on a proposed conceptual model of effective learning for international construction joint ventures (ICJVs). The paper presents a brief review on the conceptual model with hypotheses and summarized the key results of statistical analysis including factor and multiple regression analysis for the testing of the validity of the proposed conceptual model and its associated research hypotheses. Among other research findings, the research confirms that ICJVs provides an excellent platform of in-action learning for construction organization and suggests that good outcomes in learning could be reaped by a company who has a clear learning intent from the beginning and subsequently take corresponding learning actions during the full process of the joint venture.

  • PDF

Concepts on Motion of Earth and Moon to Spatial Ability, Visual-Perception-Recall Ability, Learning Styles (공간능력, 시지각 회상 능력, 학습양식에 따른 지구와 달의 운동 개념)

  • 김봉섭;정진우;양일호;정지숙
    • Journal of Korean Elementary Science Education
    • /
    • v.17 no.2
    • /
    • pp.103-111
    • /
    • 1998
  • The purpose of this study was to investigate the relationship among spatial ability, learning styles, visual-perception- recall abiltiy, and the conceptual construction of the earth and moon's motion. Four paper-and-pencil tests were used to measure students' cognitive variables. Spatial ability was measured by Spatial Visualization Test, visual-perception-recall ability was measured by Rey's Figure which also have used to test visual- perception-recall ability of right-temporal lobes, and VVT were used to investigate students' learning styles. further, the test of concept construction was consisted of 15 items about the earth and moon's motion developed by researcher One hundred and twenty-seven 6th-, one hundred and sixteen 7th-, eighty-seven 9th-grade, ninety-three college students were participated in the investigation of the effects of age and learning style on conceptual construction. In the analysis of students' performances, spatial ability, visual-perception-recall ability, and conceptual achievement showed an increasing pattern with grading. In addition, visual learner's conceptual achievement showed a significantly higher score on conceptual test than verbal learner's(p<0.05). The results of the present study supported tile hypothesis that learning styles would differently influence to learning atmospheric concepts by students'learning styles. This study also indicated to be considered the students' spatial ability in learning atmospheric concepts.

  • PDF

A Conceptual Design and Feasibility Analyses of an Automated Pothole Patching Machine (도로면 포트홀 유지보수 자동화 장비의 개념디자인 및 경제적 타당성 분석에 관한 연구)

  • Yeom, Dong Jun;Yoo, Hyun Seok;Kim, Young Suk
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.4
    • /
    • pp.65-74
    • /
    • 2018
  • The primary objective of this study is to develop a conceptual design of automated pothole patching machine that improves the conventional work in safety, quality, and productivity. For this, the following research works are conducted sequentially; 1)literature review, 2)selection of element technology for conceptual design, 3)deduction of work process and conceptual design, 4)life cycle cost analysis of the conceptual design. As a result, X-Y table telescopic manipulator, pothole patching end effector, realtime pothole recognizer, 3D pothole volume profiler, automated pothole patching machine controller are selected as core technologies. Furthermore, a conceptual design and working process of an automated pothole patching machine are developed based on the core technologies. According to the life cycle cost analysis result, the cost of the automated method was 38.3% less than that of the conventional method, and the economic efficiency was also superior(ROR 77.1%, Break-even Point 23.8month). It is expected that the application range and impact on the construction industry will be enormous due to the increasing trend of road maintenance market.