A Study on Construction Evaluation Criteria for Securing the Objectivity in Public Construction (공공공사 시공평가 항목의 객관성 확보를 위한 주요 개선 항목 도출에 관한 연구)

  • Seo, Se Deok;Kim, Ok Kyue;Park, Hyung Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.6
    • /
    • pp.913-921
    • /
    • 2019
  • The government introduced the comprehensive evaluation bidding system with the goal of pursuing the best value and the global standard in 2016. However, for the evaluation criteria on the construction evaluation reflected to the comprehensive evaluation bidding system, the problems of the objectivity insufficiency, the inclusion of multiple subjective evaluation items, and the irrationality of the weight for each evaluation item are continue to be presented. The central office group, the local government, the relevant industry, and the expert group share recognition, but the solution is not derived. Hence, the major evaluation items to be improved were derived with the characteristics analyzed to secure the objectivity of the construction evaluation. For the analysis method, the standard deviation and the Fleiss Kappa analysis method were used by utilizing the characteristics that the construction evaluation criteria consist of all 4-point measures (good, average, insufficient, and poor). According to the result, the 10 evaluation items of the total 25 construction evaluation items were derived as the evaluation items to be improved. It was found in the analysis on the major characteristics of the derived evaluation items that the qualitative evaluation criteria such as 'Very Suitable' and 'Suitable' were commonly included in the detailed evaluation guidelines. Hence, as far as the future construction evaluation standards are concerned, the qualitative evaluation standards are sublated, and the improvement should be made mainly for the quantitative evaluation criteria enabling the objectivity assurance.

Implementation of Fuzzy Comprehensive Evaluation System for Multi-level Decision Making (다층 의사결정을 위한 퍼지 포괄 평가 시스템 구축)

  • Park, Yong Kuk;Lee, Min Goo;Jung, Kyung Kwon;Won, Young-Jin
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.52 no.7
    • /
    • pp.169-177
    • /
    • 2015
  • This paper described a fuzzy comprehensive evaluation method and implemented assessment system for multi-layer decision making. The proposed method is a assessment before bidding through the key questions using fuzzy comprehensive evaluation method and the entropy weights. The key questions are given by the wider investigation of major sports event organizers. The paper carried out evaluation of single factor and fuzzy comprehensive evaluation from low layer to high layer step by step. In order to verify the effectiveness of proposed method, we built the sports event management service platform (SEMSP) for assessment of applicant city. This method represents a unified one of the quantitative results and the qualitative results based on the judgment of experts.

The study on improving the regulation for industrial accident rate level assessment of construction companies (건설업 산업재해발생률 산정·평가기준 개선방안 연구)

  • Park, Yong-Kyu
    • Journal of the Korea Safety Management & Science
    • /
    • v.18 no.3
    • /
    • pp.17-24
    • /
    • 2016
  • The regulation for industrial accident rate level assessment of construction companies was introduced to the construction industry in the Republic of Korea since 1993 and has brought positive outcome on industrial accidents reduction at construction work sites. There were considerable decrease of industrial accident ratio and enforcing of contrators' safety organizations from the beginning of the regulation for industrial accident rate level assessment. In spite of these positive outcomes, there were some negative effects such as contractors' shrinking accident reports to keep good accident ratios since these figures had a great impact on pre-qualification stage of bidding when general contractors were competing for new construction projects. In addition, Comprehensive evaluation bid system, which replaces the lowest price bid system is applied to government-ordered construction projects since 2016. Comprehensive evaluation bid system includes construction company's accident rate as one of the evaluation items and carries out with the industrial accident rate level assessment of construction companies at the same time. The regulations of two systems have been called for improvement to unify these different procedures and standards which have led business stakeholders to confusion for several years. This study aims to devote on lessening shrinking accident reports and to reduce the waste of business stakeholders through changing the regulation for industrial accident rate level assessment.

A Study of Improvement on Accident Rate Index of Construction Industry (건설업 산업재해발생율 평가지표 개선방안)

  • Lee, Miyoung;Oh, Sewook;Lim, Sejong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.108-119
    • /
    • 2016
  • Since the introduction of the converted accident rate in Pre-Qualification(PQ) process in 1992, the safety evaluation system has contributed to a reduction of construction accidents and development of the safety management system in public construction projects. As the comprehensive evaluation method the government plans to introduce includes the indicators 'accident rate' and 'death rate per 10,000 workers', the influences on the safety evaluation in the bidding process would be broader in public sector construction projects. However, the current safety evaluation system is operated by different estimating standards in the bidding process. At this point, a study of improvement on the safety evaluation index is required to review its current conditions and to propose its efficient operating method. Therefore, the purpose of this study is to analyze problems of the current safety evaluation system through the questionnaire survey on the qualified workers in construction safety management and to propose an improvement plan for the problems noticed. Our results suggest the standards of the unified process for the safety evaluation index, the size of construction firms needed for accident rate estimation, and the improvement plan for unreported accidents. The proposed improvement plan enables the reasonable estimation and efficient operation of the safety evaluation index, and further, it would contribute to reducing construction accidents through the activation of voluntary safety management by construction firms.

Deduction on The Problems and Improve The Way of The Successful Bidder Determination Method for Turnkey·Alternative Bid Construction (턴키·대안입찰공사 낙찰자 결정방식의 문제점 및 개선 방안 도출)

  • Park, Hong-Tae;Lee, Yang-kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1881-1891
    • /
    • 2014
  • Full system of turnkey deliberation committee in 2010 was abolished and permanent Deliberation committee was introduced. So far, ordering organization selected the best method suitable for the design and comprehensive evaluation method in the turnkey bid construction. Comprehensive evaluation method have bid price design score coordination, weighted basis, the best design approach fixed amount, five successful bidder decision method in addition. Design deliberation branch committee in the successful bidder decision way configured and operated branch members of special design consultation committee, But main agent changed from committee deliberation pull system to permanent committee deliberation, as well as and The lobby burden was not improved. This similar to the past at the portion of the design deliberation and the way of the design deliberation in the turnkey bid construction. Therefore it is necessary to improve the design deliberation system. In other words, design score and technology competition should be adapted to determine a successful bid. This study suggested the operating system of the design deliberation, the decision method problems of the successful bidder and ways to improve the design deliberation.

A Study for operation results of the comprehensive examination on tendering system in the cultural heritage repair and restoration, focusing on the cause of the decline in the winning bid rate (문화재수리 종합심사낙찰제·종합평가낙찰제 운영결과 및 낙찰률하락 원인 분석)

  • JUNG, Younghun;YUN, Hyundo
    • Korean Journal of Heritage: History & Science
    • /
    • v.55 no.1
    • /
    • pp.111-132
    • /
    • 2022
  • The comprehensive examination on tendering system has been introduced to the Cultural Heritage repair and restoration field since 2016 to remedy the repair issues of South Gate in 2014. The Cultural Heritage Administration tried to attain the high performance of the cultural heritage repair and restoration works securing the proper payment for the repair and restoration works. It is high time to review the operating performance of the comprehensive examination on tendering system (hereinafter referred to as the "CEOTS"), as the system has been run for over 5 years to correspond with its original goal, i.e., "The Proper Payment in return for the High Performance of Repair and Restoration works." This study intends to analyze 114 tenders of CEOTS from 2016 to 2020. As a result of the analysis of 114 tenders, firstly, more than half of bid winners were in the top 20% of repair & restoration capacity disclosure amount list, which mostly fulfilled the goal of 'attaining high performance.' Secondly, as the winning bid rate is decreasing from 86.847% in 2017 to 85.488% in 2020, the goal of 'guarantee of a proper payment' is not achieved yet. Thirdly, the influence of Economic Evaluation section in CEOTS has been grown since the change of scoring system in CEOTS in 2019. This study identifies two reasons why the winning bid rate of CEOTS has decreased. Firstly, it is caused by the fact that 'the group that got more than 1st place' and 'the first place group' that are more than half of the total bidders have the decreasing bidding rate trend as the years go by. Secondly, the exclusion rate of 'the group that got more than 1st place' is higher than the exclusion rate of 'the group that got less than 1st place', which means the expected winning rate would be lowered. It is proposed that the revision of CEOTS code is needed, i.e. easing the strict rule concerning the exclusion rate as well as setting up the lower bidding limit to prevent the excessive decreasing winning bid rate.

Orders Status Analysis on the Successful Bidder Decision Method of Turnkey Alternative Tendering Construction (턴키·대안입찰공사 낙찰자 결정방식에 의한 수주현황 분석)

  • Park, Hong-Tae;Lee, Yang-Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.771-780
    • /
    • 2013
  • Inspection system which was performed in the past selected the final winning bidder by separating Pre-Qualification, the basic design evaluation and price evaluation. However, turnkey and alternative bidding construction has selected way to determine the successful bidder as the best design and the most low cost method, comprehensive evaluation method (bid price adjustment, design score adjustments, weights standard), the best design and the fixed amount method from january 1, 2010 to the present. Due to these institutional problems, orders institutions were often a way to determine the successful bidder to apply differently for identical or similar construction. Therefore this study winning bidder selection criteria through analysis of construction the number and construction order performance, order performance by work division and institutional orders, the weights bidder order performance and orders status of turnkey alternative tendering construction to civil part performed in domestic.

Ripple Effect Analysis of Construction Standard Unit Price in Public Construction (공공건설공사 표준시장단가 적용 파급효과 분석)

  • Jin, Zheng-Xun;Baek, Seung-Ho;Lee, Ju-Hyun
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.6_3
    • /
    • pp.1207-1219
    • /
    • 2022
  • 「Act On Contracts To Which The State Is A Party」 stipulates that the "Construction Standard Production Rate" and "Construction Standard Unit Price" be used as the criteria for determining the estimated price of construction works performed by public institutions. In this regard, issues such as the application scope of the Construction Standard Unit Price, and the effect of budget reduction continue. However, due to the lack of quantitative data on the actual application of Construction Standard Unit Price, it is difficult to objectively evaluate various issues. In order to prepare data for objective evaluation of the Construction Standard Unit Price, this study analyzed the ripple effect of applying the Construction Standard Unit Price based on the bill of quantity. As a result of the analysis, the Construction Standard Unit Price ripple effect in the civil engineering part was 9.2%, and it was analyzed that there was a ripple effect of about 1.9% based on the civil engineering direct cost. In the construction part, the ripple effect was analyzed to be relatively high at 17%, but it was found to have a ripple effect of about 3% in the construction direct cost. Based on the total direct cost, the ripple effect was calculated as 2.2%. Based on the analysis results, it is possible to evaluate the effect of applying the Standard Market Unit Price, and it is expected to be used as basic data to solve issues. As a future study, it is necessary to additionally analyze the ripple effect by Standard Market Unit Price application range (over 10 billion, over 20 billion won, etc.) and delivery system type (comprehensive evaluation, qualification examination, technical bidding, etc.). In addition, it is necessary to study the appropriate ripple effect of the Standard Market Unit Price.