• Title/Summary/Keyword: Component Procurement Planning

Search Result 6, Processing Time 0.024 seconds

Component Procurement Planning with Demand Uncertainty Under Assemble-to-Order Environments (불확실한 수요를 갖는 주문 조립 환경에서의 부품 조달 계획에 관한 연구)

  • Lee, Geun-Cheol;Kim, Jung-Ug;Hong, Jung Man
    • Korean Management Science Review
    • /
    • v.29 no.3
    • /
    • pp.121-134
    • /
    • 2012
  • In this study, we consider a component procurement planning problem where the procurement amounts of components are determined under assemble-to-order systems with demand uncertainty. In the problem, procurement amount of each component is decided before the demands of finished products are known and after the demands are identified the assembly amounts of the finished products are decided. In this study, the objective function of the problem is minimizing the total costs which are composed of purchase and inventory costs of the components and the backorder costs of the finished products. We assume that the uncertain demand information is given as multiple scenarios of the demands, and we propose procurement planning methods based on stochastic models which considering the multiple demand scenarios. To evaluate the performances of the proposed methods, computational experiments were carried out on the proposed methods as well as benchmarks including a method based on deterministic mathematical model and a heuristic. From the results of the computational tests, the superiorities of the proposed methods were shown.

A Study on Optimal Lead Time Selection Measures of the Construction Materials (건설자재의 적정 리드타임 산정에 관한 연구)

  • Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.1
    • /
    • pp.105-110
    • /
    • 2004
  • Resource procurement is an important management area because cost of resource covers 40% of total construction project cost and resource delivery has direct relationship with project performance. Integration of cost provides various potentials for effective and efficient project control. This study investigates the usefulness of time in resource procurement management focused on materials. These days, construction projects have characterized manufacture because of industrialization and component. Therefore, application of systematic resource planning has been requested in the construction. There are many companies conducting procurement of resource on the web by applying MRP, ERP etc. in the construction. However, in applying them in the construction yet, there is obstruction. MRP has the character doing its function under accurate cost prediction of resource. But prediction of resource is difficult in industry mechanism of the construction. If accurate cost prediction of resource is possible in the construction, it will be expected to reduce cost of procurement of resource substantially by applying successful resource planning model in the manufacture. On the basis of recent current, the purpose of study is to present procurement of resource system that period observance of construction and minimization of stock is possible by reflecting accurate lead-time to apply proactive thought to be able to cope with alteration of construction schedule efficiently in analyzing resource planning of the construction site.

Design and Implementation of Secure E-Procurement System based on XML (XML기반의 안전한 E-Procurement 시스템 설계 및 구현)

  • Moon, Tae-Soo;Song, You-Jin
    • The KIPS Transactions:PartD
    • /
    • v.9D no.6
    • /
    • pp.1043-1054
    • /
    • 2002
  • This paper intends to suggest a XML-based secure E-Procurement system using Unified Modeling Language(UML), as an application system for domestic automobile industry. Applying UML methodology, which is Component-based Development (CBD), we analyzed the workflow on procurement operation of automobile industry and implemented a prototype of efficient E-Procurement system for automobile industry, by developing XML/EDI and XML signature. Also, on this paper, object-oriented CBD is employed to minimize the risk of life cycle and reuse software as mentioned to limitation of information engineering methodology. It enables the interoperability with ERP (Enterprise Resource Planning) as corporate legacy system. This system proposes a solution to apply analysis and design of workflow, component development, interoperability with corporate information system, and XML signature for integrity and authentication of electronic documents in other system so far.

Design and Implementation of Component-Based XML/EDI System (컴포넌트기반의 XML/EDI 시스템 설계 및 구현)

  • 문태수;김호진
    • The Journal of Information Systems
    • /
    • v.12 no.1
    • /
    • pp.87-116
    • /
    • 2003
  • One of the important applications for business-to-business electronic commerce is in procurement and inventory management using electronic data interchange(EDI). Using online catalogs and approved supplier lists, firms can easily create requisitions and purchasing documents. The emerging trend in EDI technology is changed from VAN(Value Added Network) based EDI to XML based EDI. This paper intends to suggest a component-based XML/EDI system using Unified Modeling Language(UML), as an application system for automobile part industry. Applying component based XML/EDI systems designed with UML methodology, we analyzed the workflow and the document on procurement process between trading partners and implemented a prototype of efficient XML/EDI system, as a surrogate of existing VAN/EDI. The result of applying object-oriented CBD(Component Based Development) technique is to minimize the risk of life cycle and facilitate the reuse of software as mentioned to limitation of information engineering methodology. It enables the interoperability with corporate legacy systems such as ERP(Enterprise Resource Planning), SCM(Supply Chain Management). This system proposes a solution to apply analysis phase and design phase in implementation of XML/EDI system. The implementation of XML/EDI system using CBD shows the ease of use in software reuse and the interoperability with corporate internal information system. The purchasing department with XML/EDI system can electronically communicate purchase orders, delivery schedules to external suppliers and interoperate with other application systems.

  • PDF

Critical Barriers to the Practice of Effective Cost Planning in the Ghanaian Construction Industry

  • Kissi, Ernest;Adjei-Kumi, Theophilus;Badu, Edward
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.2
    • /
    • pp.8-15
    • /
    • 2016
  • Cost planning practices in the construction industry worldwide has gained much popularity in recent times due to economic recession and stringent measures that various procurement laws prescribe in most developed and developing countries. Nevertheless, these practices in developing countries such as Ghana are constrained with the existence of critical barriers that render them non-effective and hence, accounting for the numerous abandonment of both private and public projects. Consequently, this study was enunciated with the aim to examine the critical barriers to the practice of effective cost planning in the Ghanaian construction industry. Through an in-depth literature review and a pilot survey, questionnaires were designed and administered to quantity surveyors. Data generated from the field survey was subjected to principal component analysis. The findings of the study revealed weak cost planning knowledge base, poor cost databases and understanding, inadequate designs and planning and external conditions are the major barriers to cost planning practices in the Ghanaian construction industry. The need for this study cannot be doubted since it provides an insight for experts in the construction industry on the barriers of the practice of cost planning in the industry. The awareness of these barriers will therefore facilitate efficient and effective efforts to resolve them. A future study is thereby proposed by this study to explore effective cost planning practices in the Ghanaian construction industry that will ensure private and public stakeholders get value for their money invested.

A Study on SCM Improvement Plan using the Internet of Things (사물인터넷을 활용한 SCM 고도화 방안에 대한 연구)

  • Kim, MinJune;KIM, YoungKil
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2018.05a
    • /
    • pp.553-554
    • /
    • 2018
  • Supply Chain Management (SCM) is the overall process (component procurement, production planning, delivery, inventory control, etc.). It is the process from the supplier to the consumer until the raw material becomes the finished product. Basically, traditional supply chain management is primarily aimed at cost reduction and efficiency. However, considering only cost reduction and efficiency, it is not easy apply the center of 4th industry to Smart Factory. In this study, I propose a form of supply chain management network. It can be satisfy the security by using block chain and automatic control of each element by adding the internet of things.

  • PDF