• Title/Summary/Keyword: Component Cost Analysis

Search Result 314, Processing Time 0.033 seconds

System model reduction by weighted component cost analysis

  • Kim, Jae-Hoon;Skelton, Robert-E.
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1993.10b
    • /
    • pp.524-529
    • /
    • 1993
  • Component Cost Analysis considers any given system driven by a white noise process as an interconnection of different components, and assigns a metric called "component cost" to each component. These component costs measure the contribution of each component to a predefined quadratic cost function. One possible use of component costs is for model reduction by deleting those components that have the smallest component cost. The theory of Component Cost Analysis is extended to include finite-bandwidth colored noises. The results also apply when actuators have dynamics of their own. When the dynamics of this input are added to the plant, which is to be reduced by CCA, the algorithm for model reduction process will be called Weighted Component Cost Analysis (WCCA). Closed-form analytical expressions of component costs for continuous time case, are also derived for a mechanical system described by its modal data. This is very useful to compute the modal costs of very high order systems beyond Lyapunov solvable dimension. A numerical example for NASA's MINIMAST system is presented.presented.

  • PDF

Stochastic System Reduction and Control via Component Cost Analysis (구성요소치 해석을 이용한 확률계의 축소와 제어)

  • Chae, Kyo-Soon;Lee, Dong-Hee;Park, Sung-Man;Yeo, Un-Kyung;Cho, Yun-Hyun;Heo, Hoon
    • Proceedings of the KSME Conference
    • /
    • 2007.05a
    • /
    • pp.921-926
    • /
    • 2007
  • A dynamic system under random disturbance is considered in the study. In order to control the system efficiently, proper reduction of system dimension is indispensible in design stage. The reduction method using component cost analysis in conjunction with stochastic analysis is proposed for the control of a system. System response is obtained in terms of dynamic moment equation via Fokker-Plank-Kolmogorov(F-P-K) equation. The dynamic moment response of the system under random disturbance are reduced by using of deterministic version of component cost analysis. The reduced system via proposed "stochastic component cost analysis" is successfully implemented for dynamic response and shows remarkable control performance effectively utilizing "stochastic controller" in physical time domain.

  • PDF

Analysis of Levelized Cost of Electricity for Type of Stationary Fuel Cells (발전용 연료전지 형식에 따른 균등화 발전비용 분석)

  • DONGKEUN LEE;TORRES PINEDA ISRAEL;YONGGYUN BAE;YOUNGSANG KIM;KOOKYOUNG AHN;SUNYOUP LEE
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.33 no.6
    • /
    • pp.643-659
    • /
    • 2022
  • For the economic analysis of fuel cells, levelized cost of electricity was calculated according to the type, capacity, and annual production of the fuel cells. The cost of every component was calculated through the system component breakdown. The direct cost of the system included stack cost, component cost, assembly, test, and conditioning cost, and profit markup cost were added. The effect of capacity and annual production was analyzed by fuel cell type. Sensitivity analysis was performed according to stack life, capital cost, project period, and fuel cost. As a result, it was derived how much the economic efficiency of the fuel cell improves as the capacity increases and the annual production increases.

Component-based Requirements Analysis for the GPS Applications (GPS 애플리케이션에 대한 컴포넌트 기반의 요구사항 분석)

  • Lee, Sang Young;Lee, Yoon Hyeon
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.8 no.2
    • /
    • pp.177-188
    • /
    • 2012
  • GIS provides the various analyzing and displaying using diverse spatial data have supported the powerful functionality and friendly user-interface. But, early GIS software is developed as package tool, it have many difficulties with reducing the cost of developing GPS application and satisfying the various user requirements. At present, the developed GPS applications across multiple domains, despite the common features are built separately for each domain in terms of software engineering development followed out waste of time and money expenditure. However, common features between GPS applications, if deployed as a component assembly and reuse components in terms of enabling the two kinds of component-based development can bring out the beneficial results. In this paper, we described the Analysis and design of GPS ApplicationsS based on Component. Each GPS component is composed of many objects accomplish the atomic service processing and cooperate with each other. And, GPS components meets the qualifications of thc low cost of developing GPS application because of the reusability and re-composition.

Relative Cost Modeling for Main Component Systems fo Parallel Hybrid Electric Vehicle (병렬 하이브리드 전기자동차의 주요 구성시스템에 대한 상대적 가격 모델링)

  • Kim, Pill-Soo;Kim,Yong
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.48 no.6
    • /
    • pp.294-300
    • /
    • 1999
  • There is a growing interest in hybrid electric vehicles due to environmental concerns. Recent efforts are directed toward developing an improved main component systems for the hybrid electric vehicle applications. Soon after the introduction of electric starter for internal combustion engine early this century, despite being energy efficient and nonpolluting, electric vehicle lost the battle completly to internal combustion engine due to its limited range and inferior performance. Hybrid Electric vehicles offer the most promising solutions to reduce the emission of vehicles. This paper describes a method for cost reduction estimation of parallel hybrid electric vehicle. We used a cost reduction structure that consisted of five major subsystems (three-type and two-type motor) for parallel hybrid electric vehicle. Especially, we estimated the potential for cost reductions in parallel hybrid electric vehicle as a function of time using the learning curve. Also, we estimated the potentials of cost by depreciation.

  • PDF

자동차엔진의 품질보증데이터 분석

  • Uk, Baek-Jae
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2004.07a
    • /
    • pp.183-190
    • /
    • 2004
  • Found important components in terms of frequency in the assembly (but not in terms of money). Component 39*** was most important. The failure mode was N69(no light on warning signal the cause of the failure was C15(bad connection). Formed a population for each component. Performed reliability and warranty cost analyses At the component level. At the subsystem level. At the system level. **They don'l trust the warranty cost analysis.** Reliability improvement. Among all the subsystems front \ulcorner subsystem is most vulnerable (among other things due to the large number of components in it), especially components 39*** and 28***.

  • PDF

Analysis of Size and Economic Sensitivities according to Changes in Component Replacing Costs of Renewable Hybrid Generation System (신재생복합발전시스템의 각 구성품 교체비용변화에 따른 용량 및 경제성 민감도 분석)

  • Lim, Jong Hwan
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.39 no.1
    • /
    • pp.71-78
    • /
    • 2015
  • This paper presents a method for analyzing the size and economic sensitivity of a new renewable hybrid generation system according to changes in the component replacement costs based on HOMER (Hybrid Optimization Model for Electric Renewables). The design of a hybrid system can be optimized by reducing the size of a sensitive component based on sensitivity analysis using the change in cost of a component. Sensitivity analysis can also provide information on what combinations are necessary for the optimal hybrid system. As an example, sensitivity analysis was performed on the residential load provided by HOMER, and the effects of component replacement costs on the system size and cost were quantitatively analyzed.

Cost analysis on renewable warranty policies subject to imperfect strategies using inter-failure intervals

  • Park, Minjae
    • International Journal of Reliability and Applications
    • /
    • v.14 no.1
    • /
    • pp.41-54
    • /
    • 2013
  • In this paper, cost analysis is conducted using inter-failure interval under renewable warranty subject to imperfect repair for multi-component system. One way to model the imperfect repair is to use the quasi-renewal process (Wang and Pham 1996). Two alternative quasi-renewal processes were suggested by Park and Pham (2010) using quasi-renewal process; first is an altered quasi-renewal process with random variable parameter and second is a mixed quasi-renewal process considering replacement service and repair service, simultaneously. In this study, we use the altered and mixed quasi-renewal processes and develop the warranty cost model to obtain the expected value of warranty cost and to help company make important decisions regarding the warranty policy. Numerical examples are used to demonstrate the applicability of the methodology derived in the paper.

  • PDF

Quantity Surveyors' Perception of Cost Impact Factors in Hong Kong Civil Engineering Projects

  • Chiu, Wai Yee Betty;Lau, Hat Lan Ellen
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.3
    • /
    • pp.1-9
    • /
    • 2015
  • Project cost is an important concern in any construction project. Although there has been a lot of studies on factors affecting the cost of construction projects, there seems no consensus as what cost factors have direct influence on the cost of civil engineering projects. This study therefore aims to bridge the current knowledge gap by examining quantity surveyors' perception of the factor structure among nineteen costing attributes identified based on literature review. Questionnaire was used to elicit responses from quantity surveyors working in the Hong Kong construction industry. Principal component analysis is conducted to extract the factor structure of the cost attributes and the attributes are grouped into three factor components, namely the contract management factor, the project management factor and the monetary value factor. Understanding these cost impact factors could be crucial in managing civil engineering projects, since it allows the project stakeholders and quantity surveyors to take precautionary steps to identify the cost management problems and areas for improvement and could even help to avoid cost deviations in engineering projects.

A Study on Effort Estimation Model in Software Development Using Component Tools (컴포넌트 개발 툴을 사용한 소프트웨어 개발 노력도에 관한 연구)

  • 서정석;김승렬
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.5 no.3
    • /
    • pp.18-29
    • /
    • 2000
  • This study presents a cost of efforts estimation model under the environment of developing a software using component software package tools. The approach taken was to drive from variety of sources in an attempt to identify the most significant factors. These sources ranged from already existing cost models like COTS integration cost and COCOMO models to information gathered in a data collection survey. Once the candidate drivers had been identified, the next step was to interview with the experts who had been experienced more than 5 years in component development area to identify the most significant driving factors. From those selected drivers, I established the Cost Estimation Model which is suitable for the developing a software using component software package tools by applying the general from of the well-know COCOMO software cost estimation model. To established the best fit in Korean Software industry, I used Regression statistical analysis with 31 data collections.

  • PDF