• Title/Summary/Keyword: Completion Area

Search Result 330, Processing Time 0.02 seconds

An Analysis of the On-site Improvement Area of Residential Environment Improvement Project in Daegu (대구시 주거환경개선사업 현지개량지구의 실태에 관한 연구)

  • Km, Han-Su;Kim, Cheol-Su
    • Journal of the Korean housing association
    • /
    • v.22 no.2
    • /
    • pp.43-51
    • /
    • 2011
  • This study aims to analyze the on-site improvement area of residential environment improvement project based on research results derived from the on-site and questionnaire survey in case of Daegu. The main findings are as follows. First, residents complain about delay of project completion because a long time has been passed after on-site improvement area was designated. Experts and government officials agree that a new method of development is required. Second, future development should discriminate on-site improvement area according to its level of project completion. The area should be classified into project completion areas and on-going area, and new methods, such as redevelopment, apartment-housing construction method, should be allowed. Third, for better management of on-site improvement area, laws and regulations must be ready and government's will for improvement is crucial.

Study on the Operational Status of the Comprehensive Rural Village Development Project Completion Area - Focused on Sumun, Obong and Mopyeong Areas - (농촌마을종합개발사업 준공 권역의 운영 실태에 관한 고찰 - 수문·오봉·모평권역을 중심으로 -)

  • Yang, Won Sik;Choi, Young-Wan;Kim, Young-Joo
    • Journal of Korean Society of Rural Planning
    • /
    • v.30 no.1
    • /
    • pp.67-79
    • /
    • 2024
  • The Comprehensive Rural Village Development Project, a resident-led bottom-up regional development project, began in 2004. This study investigated difficulties and problems in the operation process after the completion of the project, and future improvement plans, through in-depth interviews with the former and current chairman of the steering committee, steering committee members, and office managers, targeting three regions in Jeollanam-do, 15 years after the completion of the project. As a result of the survey and analysis, it was effective in improving the living environment and characteristics of each village and revitalizing the area. And while there were well-run facilities depending on the type of project, there were also many idle facilities. In the case of communal facilities, there was a high possibility of problems in operation and management when the scale of the new building was large. Conflicts occurred between villages in the process of independently operating the area after the completion of the project. Therefore, it is necessary to provide an S/W project program to prepare for after completion. Local governments need to utilize City and County Capacity Enhancement Projects to support regional leaders to participate in educational programs after completion and provide guidance and supervision for village operations.

The Marital Process of Completion and Marital Satisfaction of Remarried People at Early Old Age (노년 초기 재혼자의 결혼성립 과정과 결혼만족에 관한 연군)

  • Cho Young Ah
    • Journal of the Korean Home Economics Association
    • /
    • v.43 no.5 s.207
    • /
    • pp.15-42
    • /
    • 2005
  • The Purpose of this study was to explore the relation between the marital process of completion and marital satisfaction. The Data was collected by in_depth personal interview. Fifteen respondents who had been remarried for over 5 years were chosen by a researcher independently from a province in South Korea and comprised 8 females(over 55 ages) and 7 males(over 60 ages ). The Results were as fellows: 1. The Remarriage process of completion was an important process for arranging a marriage with a partner. This process was reached through the remarriage motive of the remarried person who was chosen by introduction of a family member or a friend and through meeting with a familiar friend. The factors were remarriage motive, meeting with a spouse, children's response about remarriage, and remarriage decision. 2. The success of the marital process of completion depended on a support from families and friends in order to develop their conjugal relation. Therefore conjugal relation was an important relation in marital satisfaction. Particularly, the parents-child relation, relation between a stepbrother and stepsister, and social support for remarried persons were important relations in their marital satisfaction.

A Study on the Flaw Prevention Countermeasure of Crack in Apartment House Underground Parking Area (아파트 지하주차장의 균열방지 대책 - 현장사례조사를 중심으로 -)

  • Jung Soon-Oh;Suh Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.1 s.9
    • /
    • pp.115-123
    • /
    • 2002
  • Recently all basement floor of apartment site have utilized as parking area to use efficiently space and to ensure lawful parking car figure. And the top of parking area has used as working vehicle's path and materials' carrying area during construction. Thus because crack and leakage status in underground parking area of under construction or completion building generate excessively not only performance of structure is diminished but also flaw repair cost is put in a lot of. And abroad confidence is diminish. So this study is intended to diminish flaw focus on investigation of under construction and completion fields through examine closely cause of crack and leakage status of apartment house underground parking area and prepare countermeasure with respect to design, construction and maintenance.

The Improvement and Completion of Outcome index: A new assessment system for quality of orthodontic treatment

  • Hong, Mihee;Kook, Yoon-Ah;Kim, Myeng-Ki;Lee, Jae-Il;Kim, Hong-Gee;Baek, Seung-Hak
    • The korean journal of orthodontics
    • /
    • v.46 no.4
    • /
    • pp.199-211
    • /
    • 2016
  • Objective: Given the considerable disagreement between the Peer Assessment Rating (PAR) index and the American Board of Orthodontics Cast-Radiograph Evaluation, we aimed to develop a novel assessment system-the Improvement and Completion of Outcome (ICO) index-to evaluate the outcome of orthodontic treatment. Methods: Sixteen criteria from 4 major categories were established to represent the pretreatment malocclusion status, as well as the degree of improvement and level of completion of outcome during/after treatment: dental relationship (arch length discrepancy, irregularity, U1-SN, and IMPA); anteroposterior relationship (overjet, right and left molar position, ANB); vertical relationship (anterior overbite, anterior open-bite, lateral open-bite, SN-MP); and transverse relationship (dental midline discrepancy, chin point deviation, posterior cross-bite, occlusal plane cant). The score for each criterion was defined from 0 or -1 (worst) to 5 (ideal value or normal occlusion) in gradations of 1. The sum of the scores in each category indicates the area and extent of the problems. Improvement and completion percentages were estimated based on the pre- and post-treatment total scores and the maximum total score. If the completion percentage exceeded 80%, treatment outcome was considered successful. Results: Two cases, Class I malocclusion and skeletal Class III malocclusion, are presented to represent the assessment procedure using the ICO index. The difference in the level of improvement and completion of treatment outcome can be clearly explained by using 2 percentage values. Conclusions: Thus, the ICO index enables the evaluation of the quality of orthodontic treatment objectively and consecutively throughout the entire treatment process.

Changes in Sea Bottom Topology with Saemangeurn Project (새만금사업에 따른 해저 지형변화)

  • Choi, Jin-Kyu;Son, Jae-Gwon;Kim, Jeong-Gyun;Song, Ki-Il
    • Journal of Korean Society of Rural Planning
    • /
    • v.8 no.2 s.16
    • /
    • pp.17-26
    • /
    • 2002
  • The purpose of this study was to investigate the changes of the sea bottom topology during construction of Saemangeum seadikes. Sea water depth and bottom topology in the Saemangeum area were measured every year and the surveyed data under construction of Saemangeum seadikes were analyzed and compared to the initial conditions before construction, There was erosion in the overall surveyed areas and the depth of erosion was approximately 53cm compared to the data in 1988. The center sandbanks of Seadike 2 did not show the great changes due to two main channels those were developed in northeast and southeast. The inland sandbanks of Seadike 4 showed the development of great erosion and deposition partially because of the changes in tide direction which developed as a result of the completion of Seadike 3 and the completion of a seadike of the Kunsan-Changhang industrial park at the north of Saemangeumm area.

Airtightness of Light-Frame Wood Houses built in Daejeon and Chungnam Area

  • Jang, Sang-sik;Ha, Been
    • Journal of the Korean Wood Science and Technology
    • /
    • v.45 no.2
    • /
    • pp.147-158
    • /
    • 2017
  • Among the energy consumption in building, the heating energy takes the largest part. Therefore, it is important to minimize the heat energy loss in building for the reduction of overall energy use in construction. The most important points for the minimization of energy loss in building are insulation and airtightness. Especially, in wood houses, airtightness is very important for energy saving as well as increase of durability. However, the researches on airtightness of wood buildings have been started recently and are very deficient especially in Korea. In this study, air leakage properties and airtightness performance were evaluated for light-frame wood houses built in Daejeon and Chungnam area. Total 7 houses were evaluated, among which four houses (Case 1 to Case 4) were in the construction stage before interior finish and the other three houses (Case 5 to Case 7) were after completion of construction work. The tests for airtightness were conducted by pressurization-depressurization method, and the factors included in the measurements includes air leakage rate at 50 Pa (CMH50), air change rate at 50 Pa (ACH50), equivalent leakage area (EqLA) and EqLA per floor area. As a result of this study, key air leakage points in wood houses were found to be the gaps between floor and wall, the holes for wiring and plumbing, the double glasses windows and the entrance doors. The average value of ACH50 for the houses after completion of construction work was $3.5h^{-1}$ that was similar to Europe standard ($3.0h^{-1}$). ACH50 was proportional to EqLA per floor area but inversely proportional to the internal volume, the net floor area and the area of window.

Analysis of Economic Effects of the Land Utilization and Promotion Projects(In the Case of Sinseok Area, Dangjin Districts in Chungnam Province) (농지이용증진사업의 경제효과분석)

  • Park, Jae-Keun;Lim, Jae-Hwan
    • Korean Journal of Agricultural Science
    • /
    • v.25 no.2
    • /
    • pp.293-309
    • /
    • 1998
  • This study is aimed at identifying the decision making criteria as B/C ratio, IRR and NPV based on the expected benefits and costs of the land utilization and promotion projects which have implemented to improve agricultural structure under WTO system. To carry out the objectives of the study, Sinseok project area located at Dangjin district, Chungnam province was selected. Sinseok project area has 306.2 ha of paddy area with 172 farm households. The project area will be operated by the 33 specialized farm households after completion of the project which will have 20 years of economic life. After completion of the project, farm size will be increased from 1.8ha to 9.3ha. Land intensity of the project area will be increased by 10%. Increase of land productivity and cost saving due to the labor saving technology as farm mechanization will be expected. According to the survey results, the annual amount of production cost savings per farm was estimated 3.884million won and increased total farm income was expected about 43.8million won per year. The total expexted project benefits was expected 174million won per year. The project costs to promote land utilization and structural change consisted of handling charges, and direct payment for land movility. The decision making criteria representing economic feasibility of the project such as B/C ratio, NPV and IRR were estimated 2.49, 483million won and 30% respectively when the cut-off rate was taken into account 10%. In conclusion, the land utilization and promotion project proppeled by the Korean Government under the agricultural land law is considered economically feasible from the view points of expected project benefits and costs. Accordingly the project have to be implemented more strongly under the G't financial support considering WTO and UR negociation which were aimed at achieving the free trade and improvement of international competitiveness of farm products.

  • PDF

SEVERAL METHODS OF FABRICATIONS OF INNER CROWN AND OUTER CROWN IN CONSTRUCTION OF KONUS DENTURE (다양한 Konus denture의 내관 및 외관의 제작방법)

  • Chung Jun-Yong
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.40 no.4
    • /
    • pp.406-413
    • /
    • 2002
  • The purpose of this article is the consolidation of several methods in fabrication of Konus denture. It is different Konus denture from traditional Clasped removable partial denture in the procedures of construction. There are multiple procedures of fabrications of inner and outer crowns in the construction of Konus denture. It is important to fabricate the inner crown, the outer crown and the denture framework in construction of Konus denture. Each procedure should be performed exactly. However, there are many procedures in fabrications of them, and thus, the operator and technician bear trial and error. This article consolidate the multiple methods of fabrications of components of Konus denture. The first method is completion of inner crown, outer crown and denture after one impression taking. The second method is the procedures of cementation of inner crown, impression taking of edentulous area, and completion of outer crown and denture. The third method is the procedures or pick up impression taking of inner crown and completion of outer crown and denture on the inner crown of working cast. Each method is acceptable, but operater and technician should be accustomed with their own systemic procedures and minimize the errors in the construction of denture.

Optimization of Multi-Vehicle Delivery using Sweep Algorithm and Common Area Double Reassignment (Sweep해법 및 공동구역 2차 재할당에 의한 복수차량 배송 최적화 연구)

  • Park, Sungmee;Moon, Geeju
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.37 no.1
    • /
    • pp.133-140
    • /
    • 2014
  • An efficient heuristic for two-vehicle-one-depot problems is developed in this research. Vehicle moving speeds are various along hour based time intervals due to traffic jams of rush hours. Two different heuristics are examined. One is that the delivery area assignment is made using Sweep algorithm for two vehicles by splitting the whole area in half to equally divide all delivery points. The other is using common area by leaving unassigned area between the assigned for two vehicles. The common area is reassigned by two stages to balance the completion time of two vehicle's delivery. The heuristic with common area performed better than the other due to various vehicle moving speeds and traffic jams.