본 논문에서는 제주 스마트그리드 실증단지 계통에 연계될 전류형 HVDC 상세 모델을 이용하여 계통에 외란이 발생할 경우에 일어날 수 있는 Commutation Failure를 고려한 HVDC 고장영향을 분석한 내용에 대해 기술하고 있다. 전류형 HVDC 시스템의 Commutation Failure 기본원리를 정리하고, 계통의 3상 지락고장을 가정하여 이론적인 전압감소 시점에 대해 설명하였고, 이를 통해 3상 지락고장시 리액턴스(계통 임피던스 + HVDC 부가설비 리액턴스) 값 변동에 따른 Commutation Failure 지속시간을 Multiple Transient Simulation 방법을 통해 확인하였다. 도출된 결과를 통해 리액턴스 값이 작을수록 Commutation Failure 진행 시간을 줄일 수 있음을 보여주였다.
This paper deals with commutation failure of the line-commutated converter high voltage direct current (LCC HVDC) system caused by a three phase fault in the ac power system. An analytic calculation method is proposed to estimate the maximum permissible voltage drop at the LCC HVDC station on various operating point and to assess the area of vulnerability for commutation failure (AOV-CF) in the power system based on the residual phase voltage equation. The concept is extended to multi-infeed HVDC power system as the area of severity for simultaneous commutation failure (AOS-CF). In addition, this paper presents the implementation of a shunt compensator applying to the proposed method. An analysis and simulation have been performed with the IEEE 57 bus sample power system and the Jeju island power system in Korea.
Commutation failures can deteriorate the availability of high-voltage direct current (HVDC) links and may lead to outage of the HVDC system. Most commutation failures are caused by voltage reduction due to ac system faults on inverter side. The commutation failure process can be divided into two stages. The first stage, from the occurrence to the clearing of faults, is called 'Deterioration Stage'. The second stage, from the faults clearing to restoring the power system stability, is called 'Recovery Stage'. Based on the analysis of the commutation failure process, this paper proposes a direct-current fuzzy controller including prevention and recovery controller. The prevention controller reduces the direct current to prevent Commutation failures in the 'Deterioration Stage' according to the variation of ac voltage. The recovery controller magnifies the direct current to speed up the recovery of power system in the 'Recovery Stage', based on the recovery of direct voltage. The validity of this proposed fuzzy controller is further proved by simulation with CIGRE HVDC benchmark model in PSCAD/EMTDC. The results show the commutation failures can be mitigated by the proposed direct-current fuzzy controller.
A hybrid HVDC system that is composed of line commutated converter (LCC) at the rectifier side and voltage source converter (VSC) in series with LCC at the inverter side is studied in this paper. The start-up strategy, DC fault ride-through capability, and fault recovery strategy for the hybrid HVDC system are proposed. The steady state and dynamic performances under start-up, AC fault, and DC fault scenarios are analyzed based on a bipolar hybrid HVDC system. Furthermore, the immunity of the LCC inverter in hybrid HVDC to commutation failure is investigated. The simulation results in PSCAD/EMTDC show that the hybrid HVDC system exhibits favorable steady state and dynamic performances, in particular, low susceptibility to commutation failure, excellent DC fault ride-through, and fast fault recovery capability. Results also indicate that the hybrid HVDC system can be a good alternative for large-capacity power transmission over a long distance byoverhead line.
The Transactions of the Korean Institute of Electrical Engineers B
/
v.50
no.10
/
pp.521-529
/
2001
This paper deals with the commutation failures of HVCD system. Commutation failures are caused by AC voltage distrotions at inverter side and cause the HVDC system oscillations. In this paper, in order to know a correct incidence and onset of the failures, theoretical analysis, the simulation and the investigation at actual system are carried out and the dynamic performace simulations are performed by PSCAD/EMTDC. Finally, the condition that the failure could be generated and how to reduce the failures are analyzed.
Commutation failure can be considered as the severest abnormal operation of thyristor HVDC converter. During the failure, power conversion from DC to AC is stopped until the AC voltage get recovered. The process of thyristor converter is subscribed at normal and abnormal state, respectively. The detection and the protection for Cheju HVDC are explained by computer simulation results.
The most difficult problem encountered in the DC Chopper is the improvement in it's output waveforms and the commutation failure. Thus, this paper deals with the Load Insensitive DC Chopper that produces a quasi-pure square wave over the entire load range, and doesn't fail the commutation. The authors compared voltage and current waveforms from the laboratory model with those from the computer simulation, and it's characteristics is discussed.
Proceedings of the Korean Society for Noise and Vibration Engineering Conference
/
2008.04a
/
pp.869-873
/
2008
Optimization method for the open loop commutation time intervals in HDD spindle start-up control is presented in this paper. A hard disk drive(HDD) uses a sensorless brushless DC motor(BLDC) for the platter rotation. Because there is no direct sensor for the rotor position, open loop commutations after sensing the rotor position at a standstill using inductive sensing method are performed to speed up the rotor up to a certain speed where the zero crossings of the back electromotive force(EMF) are measurable. Therefore successful open loop commutations are necessary for the stable start-up control of the spindle motors. Random neighborhood search(RNS) algorithm is introduced as a optimization technic in this paper. Rotor speed and its standard deviation are used as a cost function and commutation intervals obtained from the spindle motion equation are used as initial parameter values for the RNS. With the help of the proposed method optimized open loop commutation time intervals for the very low start-up current are acquired and tested. The experimental results shows that the proposed method can decrease the start-up failure rate of a HDD spindle motor.
The Transactions of the Korean Institute of Electrical Engineers
/
v.35
no.8
/
pp.353-362
/
1986
This paper shows that 6 pulse converter instead of 12 pulse converter can be used for the control of Superconducting Magnet Energy Storage(SMES) to improve the stability and to suppress the voltage fluctuation of power system. In order to prevent the commutation failure, when 6 pulse converter used for simultaneous control of real power and reactive power is asymmetrically controlled, stable control region has been presented by analyzing the commutation phenomena at critical points which distinguish the stable control region from the unstrol control region. Harmonic components of line current and output voltage have been calculated. Finally, computer simulation of power system stabilization has been presented to show the effectiveness of the proposed method. According to the computation results, SMES controlled by the 6 pulse converter is an effective measure in reducing the oscillation and the transient instability of the power system.
Journal of Advanced Marine Engineering and Technology
/
v.13
no.1
/
pp.57-68
/
1989
This paper treats the analytical and experimental studies on the improvement of commutating circuit for the speed control of DC motor. A simple circuit composed of R, L and C elements is proposed here for switching off power SCR carrying the load current. The real important in this chopper circuit is to determine the reasonable values of commutating circuit constants. In this paper, the reasonable values of the commutating circuit constants are basically determined on a view point of commutating performances in the given circuit model and must satisfy the following conditions. The first, the peak commutating current should be larger than the anticipated maximum load current. The second, the circuit turn-off time (tc) must be longer than the SCR turn-off time (tq). The third, the resistor should be enough large to permit the current to be neglected in the analysis of the commutation circuit, as well as be enough small to permit to charge the capacity voltage (Ec) to the half the value of source voltage (E) before the next communication cycle is initiated. The last, the period of chopping signal must be the least possible multiple of the damping vibration period of commutating circuit. The improved chopper circuit used in the experiment under unloaded condition was composed to meet the reasonable conditions mentioned above, and a successful commuting performance was achieved without failure. Several types of microprocessor having a different value of CPU speed individually have been applied to the experiment under the loaded conditions. Also it shows that the faster the speed of CPU is, the more stable the commutation turns out.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.