• Title/Summary/Keyword: Commissioning

Search Result 269, Processing Time 0.026 seconds

The Study of the Aternative Boadcasting System: in the Case of the Channel 4 in Britain (대안적 방송제작시스템 연구 : 영국 채널4의 외주제작시스템을 중심으로)

  • Eun, Hye-Chung
    • Korean journal of communication and information
    • /
    • v.17
    • /
    • pp.85-111
    • /
    • 2001
  • In this article, Channel 4 in Britain is the main theme since its alternative broadcasting system can shed the light to the Korean case. Korea is getting into the era of multimedia and including webcastings there are over thousands channels are available. However the infra-structure fur the broadcasting contents never seems to be matured to match its need. Instead Korean production system is rather vertically integrated into the Networks(KBS, MBC and SBS) which oligopolise the broadcasting in terms of supply. Even though 'Program Quota Regulation' has been established under the new Broadcasting Art(1999), the old habits die hard and still the independent producers have the unfair relationships with the Networks. Under this circumstance, Channel 4 can be the good example to show how well the alternative system can serve to the diversity of broadcasting and the taste of the minority. Channel 4 took almost 20 years to establish since there were enormous amount of debates about its public missions, ideal broadcasting system, whom it should serve for, etc. between all the social sectors including the independent producers. The social agreement was reached on the point that the new broadcaster should not produce but publish and it is called the 'publishing broadcaster'. In this sense, it can be managed effectively with comparatively little fund and at the same time, it can always have all different sorts of contents as well as genres very freely through 'commissioning process' or buying programs from even the most innovative producers. The 'commissioning process' is one of the key points which makes the Channel 4 so unique. The commissioning process is literally open to anybody, in particular, to the small scale producers with much innovative ideas. Channel 4 will support financially as well as with facilities and human resource to produce the program once after their program idea is accepted by the commissioning editor. Even better side of Channel 4 is about their financial success. From the beginning, the 'funding formula' helped in great deal to make the Channel 4 doing all sorts of innovative experiments. The history of 'funding formula' and its contribution are explained in the article, too. With all this effort, the article is hoped to bring discussion about the alternative broadcasting system which might help to prepare the new era of broadcasting.

  • PDF

Acceptance Testing and Commissioning of Robotic Intensity-Modulated Radiation Therapy M6 System Equipped with InCiseTM2 Multileaf Collimator

  • Yoon, Jeongmin;Park, Kwangwoo;Kim, Jin Sung;Kim, Yong Bae;Lee, Ho
    • Progress in Medical Physics
    • /
    • v.29 no.1
    • /
    • pp.8-15
    • /
    • 2018
  • This work reports the acceptance testing and commissioning experience of the Robotic Intensity-Modulated Radiation Therapy (IMRT) M6 system with a newly released $InCise^{TM}2$ Multileaf Collimator (MLC) installed at the Yonsei Cancer Center. Acceptance testing included a mechanical interdigitation test, leaf positional accuracy, leakage check, and End-to-End (E2E) tests. Beam data measurements included tissue-phantom ratios (TPRs), off-center ratios (OCRs), output factors collected at 11 field sizes (the smallest field size was $7.6mm{\times}7.7mm$ and largest field size was $115.0mm{\times}100.1mm$ at 800 mm source-to-axis distance), and open beam profiles. The beam model was verified by checking patient-specific quality assurance (QA) in four fiducial-inserted phantoms, using 10 intracranial and extracranial patient plans. All measurements for acceptance testing satisfied manufacturing specifications. Mean leaf position offsets using the Garden Fence test were found to be $0.01{\pm}0.06mm$ and $0.07{\pm}0.05mm$ for X1 and X2 leaf banks, respectively. Maximum and average leaf leakages were 0.20% and 0.18%, respectively. E2E tests for five tracking modes showed 0.26 mm (6D Skull), 0.3 mm (Fiducial), 0.26 mm (Xsight Spine), 0.62 mm (Xsight Lung), and 0.6 mm (Synchrony). TPRs, OCRs, output factors, and open beams measured under various conditions agreed with composite data provided from the manufacturer to within 2%. Patient-specific QA results were evaluated in two ways. Point dose measurements with an ion chamber were all within the 5% absolute-dose agreement, and relative-dose measurements using an array ion chamber detector all satisfied the 3%/3 mm gamma criterion for more than 90% of the measurement points. The Robotic IMRT M6 system equipped with the $InCise^{TM}2$ MLC was proven to be accurate and reliable.

Simulation Methods Development for a Plant Unit Master Control Logic Using Simulink in MATLAB (매트랩 시뮬링크를 이용한 플랜트 유닛마스터 제어로직 시뮬레이션 기법 개발)

  • Yoon, Changsun;Hong, Yeon-Chan
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.2
    • /
    • pp.324-334
    • /
    • 2017
  • The simulators for a plant unit master control (UMC) developed by domestic or overseas researchers have been developed for operator-training purposes. UMC simulators normally constructed at the end of the plant construction, despite the UMC logics, should be simulated to pre-check many signal interfaces within the power generation systems. Because of the differences in construction schedule, it is difficult for logic designers or commissioning engineers to simulate the UMC logic during the design or commissioning stage. In this background, this paper proposes a simulation method that can be used easily by plant logic designers or operators in the MATLAB Simulink programming environment. The core of the UMC is realized with a unique simulation algorithm based on mathematical analysis and functional blocks combination. In addition, an integer-based configuration was proposed to realize the plant target value control for the equipment in the logic. With these simulation methods, functions, e.g., load distribution, high-low limitations, frequency compensation, etc. were simulated. The results showed that the plant UMC logic can be simulated in Simulink without a plant simulator. The various functions proposed in this paper can provide useful information about Simulink-based simulation design for plant logic designers or commissioning engineers during the power plant construction period.

OVERVIEW OF KSTAR INTEGRATED CONTROL SYSTEM

  • Park, Mi-Kyung;Kim, Kuk-Hee;Lee, Tae-Gu;Kim, Myung-Kyu;Hong, Jae-Sic;Baek, Sul-Hee;Lee, Sang-Il;Park, Jin-Seop;Chu, Yong;Kim, Young-Ok;Hahn, Sang-Hee;Oh, Yeong-Kook;Bak, Joo-Shik
    • Nuclear Engineering and Technology
    • /
    • v.40 no.6
    • /
    • pp.451-458
    • /
    • 2008
  • After more than 10 years construction, KSTAR (Korea Superconducting Tokamak Advanced Research) had finally completed its assembly in June 2007, and then achieved the goal of first-plasma in July 2008 through the four month's commissioning. KSTAR was constructed with fully superconducting magnets with material of $Nb_3Sn$ and NbTi, and their operation temperatures are maintained below 4.5K by the help of Helium Refrigerator System. During the first-plasma operation, plasmas of maximum current of 133kA and maximum pulse width of 865ms were obtained. The KSTAR Integrated Control System (KICS) has successfully fulfilled its missions of surveillance, device operation, machine protection interlock, and data acquisition and management. These and more were all KSTAR commissioning requirements. For reliable and safe operation of KSTAR, 17 local control systems were developed. Those systems must be integrated into the logically single control system, and operate regardless of their platforms and location installed. In order to meet these requirements, KICS was developed as a network-based distributed system and adopted a new framework, named as EPICS (Experimental Physics and Industrial Control System). Also, KICS has some features in KSTAR operation. It performs not only 24 hour continuous plant operation, but the shot-based real-time feedback control by exchanging the initiatives of operation between a central controller and a plasma control system in accordance with the operation sequence. For the diagnosis and analysis of plasma, 11 types of diagnostic system were implemented in KSTAR, and the acquired data from them were archived using MDSpius (Model Driven System), which is widely used in data management of fusion control systems. This paper will cover the design and implementation of the KSTAR integrated control system and the data management and visualization systems. Commissioning results will be introduced in brief.

Monte Carlo Algorithm-Based Dosimetric Comparison between Commissioning Beam Data across Two Elekta Linear Accelerators with AgilityTM MLC System

  • Geum Bong Yu;Chang Heon Choi;Jung-in Kim;Jin Dong Cho;Euntaek Yoon;Hyung Jin Choun;Jihye Choi;Soyeon Kim;Yongsik Kim;Do Hoon Oh;Hwajung Lee;Lee Yoo;Minsoo Chun
    • Progress in Medical Physics
    • /
    • v.33 no.4
    • /
    • pp.150-157
    • /
    • 2022
  • Purpose: Elekta synergy® was commissioned in the Seoul National University Veterinary Medical Teaching Hospital. Recently, Chung-Ang University Gwang Myeong Hospital commissioned Elekta Versa HDTM. The beam characteristics of both machines are similar because of the same AgilityTM MLC Model. We compared measured beam data calculated using the Elekta treatment planning system, Monaco®, for each institute. Methods: Beam of the commissioning Elekta linear accelerator were measured in two independent institutes. After installing the beam model based on the measured beam data into the Monaco®, Monte Carlo (MC) simulation data were generated, mimicking the beam data in a virtual water phantom. Measured beam data were compared with the calculated data, and their similarity was quantitatively evaluated by the gamma analysis. Results: We compared the percent depth dose (PDD) and off-axis profiles of 6 MV photon and 6 MeV electron beams with MC calculation. With a 3%/3 mm gamma criterion, the photon PDD and profiles showed 100% gamma passing rates except for one inplane profile at 10 cm depth from VMTH. Gamma analysis of the measured photon beam off-axis profiles between the two institutes showed 100% agreement. The electron beams also indicated 100% agreement in PDD distributions. However, the gamma passing rates of the off-axis profiles were 91%-100% with a 3%/3 mm gamma criterion. Conclusions: The beam and their comparison with MC calculation for each institute showed good performance. Although the measuring tools were orthogonal, no significant difference was found.

Korea Pathfinder Lunar Orbiter (KPLO) Operation: From Design to Initial Results

  • Moon-Jin Jeon;Young-Ho Cho;Eunhyeuk Kim;Dong-Gyu Kim;Young-Joo Song;SeungBum Hong;Jonghee Bae;Jun Bang;Jo Ryeong Yim;Dae-Kwan Kim
    • Journal of Astronomy and Space Sciences
    • /
    • v.41 no.1
    • /
    • pp.43-60
    • /
    • 2024
  • Korea Pathfinder Lunar Orbiter (KPLO) is South Korea's first space exploration mission, developed by the Korea Aerospace Research Institute. It aims to develop technologies for lunar exploration, explore lunar science, and test new technologies. KPLO was launched on August 5, 2022, by a Falcon-9 launch vehicle from cape canaveral space force station (CCSFS) in the United States and placed on a ballistic lunar transfer (BLT) trajectory. A total of four trajectory correction maneuvers were performed during the approximately 4.5-month trans-lunar cruise phase to reach the Moon. Starting with the first lunar orbit insertion (LOI) maneuver on December 16, the spacecraft performed a total of three maneuvers before arriving at the lunar mission orbit, at an altitude of 100 kilometers, on December 27, 2022. After entering lunar orbit, the commissioning phase validated the operation of the mission mode, in which the payload is oriented toward the center of the Moon. After completing about one month of commissioning, normal mission operations began, and each payload successfully performed its planned mission. All of the spacecraft operations that KPLO performs from launch to normal operations were designed through the system operations design process. This includes operations that are automatically initiated post-separation from the launch vehicle, as well as those in lunar transfer orbit and lunar mission orbit. Key operational procedures such as the spacecraft's initial checkout, trajectory correction maneuvers, LOI, and commissioning were developed during the early operation preparation phase. These procedures were executed effectively during both the early and normal operation phases. The successful execution of these operations confirms the robust verification of the system operation.

Recent Developments at the Large Binocular Telescope Observatory, GMT's forerunner

  • Veillet, Christian
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.40 no.1
    • /
    • pp.70.3-70.3
    • /
    • 2015
  • After a short description of the telescope, we will report on the recent developments in three main areas: - Commissioning of the last of LBT's first generation instruments, now well underway, - Adaptive Optics (AO) and ground-layer AO progress and planned upgrades, - Interferometry first science results. We will also explore the future of the facility as it moves to full operation and strive to be the first of the ELTs in the decade-long window in which GMT, TMT, and E-ELT break ground and start taking shape.

  • PDF

Nonlinear self-tuning control incorporating cautious estimation

  • James, D.J.G.;Burnham, K.J.
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1996.10a
    • /
    • pp.227-230
    • /
    • 1996
  • The paper highlights the need for cautious least squares estimation when dealing with industrial applications of bilinear self-tuning control and indicates in qualitative terms the benefits of the approach over linear self-tuning control schemes. The cautious least squares algorithm is described and the use of cautious self-tuning in the context of both commissioning and implementation discussed.

  • PDF

Application of developed DCS to test furnace (국산 개발 DCS의 시험 연소로 적용)

  • 김은기;변승현;이찬주
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1997.10a
    • /
    • pp.840-843
    • /
    • 1997
  • We applied a DCS which was developed in Korea to test furnace. Test furnace is a pilot-scale plant made for finding combustion in firing coal. In this paper, we describe control system which was implemented in test furnace in detail. Finally, we describe the fire box temperature control loop, and show fire box temperature control result during commissioning stage using implemented control system.

4th Generation Light Source: X-ray Free Electron Laser (4세대 방사광: 엑스선 자유전자레이저)

  • Han, Jang-Hui
    • Vacuum Magazine
    • /
    • v.3 no.4
    • /
    • pp.4-7
    • /
    • 2016
  • An X-ray Free Electron laser facility (PAL-XFEL) has been built in Pohang Accelerator Laboratory to provide X-ray FEL radiations for photon users. The machine consists of a 10 GeV normalconducting S-band linear accelerator and two undulator beamlines. The hard and soft X-ray beamlines will provide FEL radiations with wavelengths of 0.6 to 0.1 nm and 4.5 to 1 nm, respectively. Beam commissioning of PAL-XFEL is ongoing and user service will start in 2017. In this report, the PAL-XFEL layout and the working principle are discussed.