• Title/Summary/Keyword: Commissioning

Search Result 267, Processing Time 0.031 seconds

Safety Case for AREX's E&M System (공항철도 기전시스템의 종합안전대책기술서)

  • Lee, Chang-Hwan;Lim, Sung-Soo;Song, Mi-Ok
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.280-288
    • /
    • 2007
  • This paper is based on the safety case as specified in the E&M system safety management plan established in initially AREX project. The safety case for E&M system is the synthesis of all safety activities throughout the design, manufacturing, installation and commissioning test for E&M system. The safety level of E&M system which is required by E&M contract is assured by accomplishment of safety activities and procedures in accordance with EN standards.

  • PDF

Yeonggwang #1/2 steam condenser leakage repair works (영광 #1/2 복수기 누수부 보수공사)

  • 이상철;공창식
    • Proceedings of the KWS Conference
    • /
    • 2003.05a
    • /
    • pp.117-119
    • /
    • 2003
  • Power plant efficiency and availability depend greatly on condenser performance. However, during commissioning of Yeonggwang #1/2 steam condenser sodium leakage occurred, because of tube to tubesheet only roll expanding. Therefore this report is explaining that pre-test for the shake of improvement reliable repair processes & selected sampling tube re-expansion in-situ applications.

  • PDF

Development of Digital Excitation System for San-cheong Pumped Sorage Power Plant (산청양수 디지털 여자시스템 개발)

  • Ryu, Ho-Seon;Lim, Ick-Hun
    • Proceedings of the KIEE Conference
    • /
    • 2006.07b
    • /
    • pp.956-957
    • /
    • 2006
  • KEPRI developed digital excitation system for San-Cheong pumped storage power plant. This is the very complicated system because of operation connected with SFC(Static Frequency Converter). Many operation modes(stating, regeneration, back to back, line charging, gird connection mode etc) during the commissioning were successfully tested at san-Cheong #2.

  • PDF

A Study of PWM Inverter for Field Control on Large Synchronous Generator (대형 동기 발전기 계자제어를 위한 PWM 인버터에 관한 연구)

  • Ryu, Ho-Seon;Lee, Joo-Hyun;Lim, Ick-Hun
    • Proceedings of the KIEE Conference
    • /
    • 2006.07b
    • /
    • pp.958-959
    • /
    • 2006
  • For the life extension of Jeju thermal power plant, digital PWM excitation system was replaced by KEPRI. This system consist of TMR(Triple Modular Redundant) controller, dual PWM power inverter for field current control and MMI etc. The Performance test during the commissioning verified the reliability of digital PWM excitation system and recently, this system has been operated successfully.

  • PDF

Introduction to Korean involvement in the Large Synoptic Survey Telescope Project

  • Shin, Min-Su
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.41 no.1
    • /
    • pp.75.2-75.2
    • /
    • 2016
  • We introduce Korean involvement in the Large Synoptic Survey Telescope Project and activities organized by a group of Korean astronomers as LSST Korea. The Korea Astronomy and Space Science Institute plans to sign a memorandum of agreement with Large Synoptic Survey Telescope Corporation this year. Although the project will start its commissioning observation around 2020, Korean preparation for the LSST era should be initiated now because of an unprecedented amount of data produced in the LSST. We explain current status of our efforts for the LSST Korea.

  • PDF

Identification on Fatigue Failure of Impeller at Single Stage Feedwater Pumps During Commissioning Operation (단단 주 급수 펌프 임펠러에서 시운전 중 발생한 피로 절손에 관한 규명 연구)

  • Kim, Yeon-Whan;Kim, Kye-Yean;Bae, Chun-Hee;Lee, Young-Shin
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.18 no.9
    • /
    • pp.937-942
    • /
    • 2008
  • This paper presents a case history on failures of impeller and shaft due to pressure pulsation at single stage feed water pumps in 700 MW nuclear power plant during commissioning operation. The pumps had been service and had run for approximately $40{\sim}50$ hours. For the most part, the failures of impeller occurred with the presence of a number of fatigue cracks. All cracks were associated with the deleterious surface layer of impeller by visual and metallurgical examination. On-site testing and analytical approach was performed on the systems to diagnose the problem and develop a solution to reduce the effect of exciting sources. A major concern at high-energy centrifugal pump is the pressure pulsation created from trailing edge of the Impeller blade, flow separation and recirculation at centrifugal pumps of partial load. Pressure pulsation due to the interaction generating between impeller and casing coincided with natural frequencies of the impeller and shaft system during 1ow load operation. It was identified that dynamic stress exceeding the fatigue strength of the material at the thin shroud section due to the hydraulic instability at running condition below BEP.

The Construction Work Completion of the Fuel Test Loop (핵연료 노내조사시험설비 설치공사 완료)

  • Park, Kook-Nam;Lee, Chung-Young;Chi, Dae-Young;Park, Su-Ki;Shim, Bong-Sik;Ahn, Sung-Ho;Kim, Hark-Rho;Lee, Jong-Min
    • Proceedings of the KSME Conference
    • /
    • 2007.05a
    • /
    • pp.291-295
    • /
    • 2007
  • FTL(Fuel Test Loop) is a facility that confirms performance of nuclear fuel at a similar irradiation condition with that of nuclear power plant. FTL consists of In-Pile Test Section (IPS) and Out-Pile System (OPS). FTL construction work began on August, 2006 and ended on March, 2007. During Construction, ensuring the worker's safety was the top priority and installation of the FTL without hampering the integrity of the HANARO was the next one. Task Force Team was organized to do a construction systematically and the communication between members of the task force team was done through the CoP(community of Practice) notice board provided by the Institute. The installation works were done successfully overcoming the difficulties such as on the limited space, on the radiation hazard inside the reactor pool, and finally on the shortening of the shut down period of the HANARO. Without a sweet of the workers of the participating company of HEC(Hyundae Engineering Co, Ltd), HDEC(HyunDai Engineering & Construction Co. Ltd), equipment manufacturer, and the task force team, it is not possible to install the FTL facility within the planned shutdown period. The Commissioning of the FTL is on due to check the function and the performance of the equipment and the overall system as well. The FTL shall start operation with high burn up test fuels in early 2008 if the commissioning and licensing progress on schedule.

  • PDF

A Comparative Study on Management Evaluation and Re-certification System of G-SEED, BREEAM, LEED (국내외 녹색건축인증제의 유지관리 및 재인증 제도에 대한 비교 연구)

  • Hyun, Eun Mi;Kim, Yong Sik
    • KIEAE Journal
    • /
    • v.14 no.1
    • /
    • pp.121-129
    • /
    • 2014
  • As time passes, the aging of the plant building, the building's energy performance degradation than the initial plan does not express a situation could arise. This year, the certification of buildings certified in 2009 has expired for measures such as the situation required. In this study, management of national and international green building certification and re-certification was compared in two ways. First, the evaluation of green building certification system management assessments were compared. Second, the green building certification system for the re-certification analysis. As a result, G-SEED was not reflected life-cycle of building in management assessment and the commissioning of G-SEED is the UK and the U.S and other concepts of evaluation. In addition, the re-certification system is insufficient about substantial energy consumption of buildings. In this study, the revised the management assessments in conjunction with the re-certification system to manage the building is proposed to improve. In addition, the current evaluation of the existing building certification "existing building" and "building the first certified" as it is more efficient to separate the information into assessment was judged. Green building certification system to meet the purpose of management and operation, and disposal phases of the building to promote energy conservation and sustainability in order to the management a systematic and detailed evaluation and re-certification system developed for the revision of the specific items required and future research want to continue.

6MV Photon Beam Commissioning in Varian 2300C/D with BEAM/EGS4 Monte Carlo Code

  • Kim, Sangroh;Jason W. Sohn;Cho, Byung-Chul;Suh, Tae-Suk;Choe, Bo-Yong;Lee, Hyoung-Koo
    • Proceedings of the Korean Society of Medical Physics Conference
    • /
    • 2002.09a
    • /
    • pp.113-115
    • /
    • 2002
  • The Monte Carlo simulation method is a numerical solution to a problem that models objects interacting with other objects or their environment based upon simple object-object or object-environment relationships. In spite of its great accuracy, It was turned away because of long calculation time to simulate a model. But, it is used to simulate a linear accelerator frequently with the advance of computer technology. To simulate linear accelerator in Monte Carlo simulations, there are many parameters needed to input to Monte Carlo code. These data can be supported by a linear accelerator manufacturer. Although the model of a linear accelerator is the same, a different characteristic property can be found. Thus, we performed a commissioning process of 6MV photon beam in Varian 2300C/D model with BEAM/EGS4 Monte Carlo code. The head geometry data were put into BEAM/EGS4 data. The mean energy and energy spread of the electron beam incident on the target were varied to match Monte Carlo simulations to measurements. TLDs (thermoluminescent dosimeter) and radiochromic films were employed to measure the absorbed dose in a water phantom. Beam profile was obtained in 40cm${\times}$40cm field size and Depth dose was in 10cm${\times}$10cm. At first, we compared the depth dose between measurements and Monte Carlo simulations varying the mean energy of an incident electron beam. Then, we compared the beam profile with adjusting the beam radius of the incident electron beam in Monte Carlo simulation. The results were found that the optimal mean energy was 6MV and beam radius of 0.1mm was well matched to measurements.

  • PDF