• Title/Summary/Keyword: Commissioning

Search Result 271, Processing Time 0.022 seconds

Study on the Application of RAMS for Rolling Stock (철도차량 RAMS 적용에 관한 연구)

  • Oh, Ji-Eun;Kang, Chan-Yong;Kim, Chul-Ho
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.206-212
    • /
    • 2004
  • This paper is application of System Assurance(SA) for the rolling stock. As railway systems become more complex, design teams are increasingly under pressure to deliver, design solutions, which integrate both technical and Systems Assurance(SA). Systems Assurance is the application of management methods and analysis techniques to ensure that a design meets Reliability, Availability, Maintainability and Safety (RAMS) criteria. It should be clearly understood that the intent of System Assurance is not just to provide analytical techniques as a metric on performance, but more importantly it should provide a management tool with which to co-ordinate and assure the whole design. System Assurance encompasses the ongoing requirement to consider safety, and RAM through each stage of a Project, from feasibility study through to commissioning and operation. If System Assurance is undertaken properly at feasibility study at the design stages of a Project, the benefits of such analyses can be significant in identifying potential problems early enough for action to be taken before manufacture or installation. At commissioning, RAMS demonstration activities are undertaken to validate the predictive and analytical techniques undertaken during the design.

  • PDF

Characteristics of Pressure Fluctuation and internal noise level for Korean High Speed Train (한국형 고속열차의 최고속도에서 압력변동 하중과 실내소음 특성 분석)

  • Park Choon-Soo;Choi Sung-hoon;Lee The-hyung;Mok Jin-young;Kim Ki-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.338-343
    • /
    • 2005
  • The Korean high speed train(KHST), developed since 1996, is presently undergoing commissioning tests on the high-speed track as well as on the conventional track since 2002. The purpose of the commissioning test is twofold: first to verify the performance of the train-set and equipments, and to demonstrate system reliability. Last December, KHST has reached the maximum speed of 350km/h and a number of data proving the performance of the train has been acquired. Among the data noise level and pressure variation in a cabin are important factors effecting passenger's comfort. Discussed in this paper are interior noise and pressure variation when the train passes tunnels during the 350km/h test.

  • PDF

Commissioning of the Redshift Search Receiver

  • Chung, Ae-Ree;Yun, Min-S.;Narayanan, Gopal;Heyer, Mark;Erickson, Neal A.;Snell, Ronald L.;Irvine, William M.
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.35 no.2
    • /
    • pp.36.1-36.1
    • /
    • 2010
  • The Redshift Search Receiver (RSR) is a sensitive, ultra-wideband spectrometer that is being built at the University of Massachusetts as one of the facility instruments for the 50-m Large Millimeter Telescope (LMT). It consists of four receivers each covering the entire 3 mm window from 74 to 111 GHz instantaneously. The primary goal of the receiver is to detect multiple molecular lines in galaxies at any distance and uniquely determine the redshift, in particular dust-obscured star forming systems at high-z which are not easily accessible. I will present some results from commissioning of the RSR on the Five College Radio Astronomy Observatory 14-m telescope, and discuss the future of the receiver.

  • PDF

Kangjin Substation 80MVA UPFC Commissioning (강진변전소 80MVA UPFC Commissioning)

  • Kim, J.M.;Han, Y.S.;Choi, J.Y.;Kim, S.Y.;Chang, B.H.;Choo, J.B.;Park, C.S.
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.491-493
    • /
    • 2003
  • 전력계통의 유연하고 안정적인 운용을 위한 인버터형 FACTS 기기의 국내 적용에 대한 연구 결과를 토대로 국내 154kV 계통에 적용되는 80MVA급 UPFC pilot plant project가 수행되었다. Project의 결과물로써 80MVA급 UPFC가 강진-장흥 154kV 계통에 제작, 설치되었다. 강진 변전소 UPFC는 각종 성능 시험 및 시운전 절차를 성공적으로 완료하였으며 현재는 병렬 인버터에 의한 강진 모선의 전압 제어 및 직렬인버터에 의한 강진-장흥간의 조류 제어 기능을 수행하며 상용 운전되고 있다.

  • PDF

A Study on Test Working of Signalling System (신호시스템 시운전 시험 연구)

  • 정의진;황종규;이종우
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.157-163
    • /
    • 2000
  • Testing evaluation is a part of process for design, production, evaluation, operation and abolition, and is the process of certifying system performance. The main purpose of testing evaluation is to reduce the risk factor under the determining process. Testing process has the three step such as design qualification, integration and validation test in factory, system integration and commissioning test. Design Qualification is to verify errors on the design process. Integration and validation test in factory is for the H/W and S/W of an equipment and is to verify interface of subsystem, communication protocol and main functions. System integration and commissioning test is a functional test to adjust successful installation of equipment. According to the testing process, briefly consideration for test item, test method and test contents about signalling system is carried out.

  • PDF

Evaluation and countermeasure for Environmental Noise during Plant Commissioning Process in Thermal Power Plant (화력발전소 시운전시 인근에 미치는 소음영향 및 대책)

  • Kim, Yeon-Whan;Koo, Jae-Raeyang;Kim, Hee-Soo;Bae, Yong-Chae;Lee, Hyun
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2001.11b
    • /
    • pp.897-902
    • /
    • 2001
  • This paper describes the evaluation of noise influence for residental and boundary areas in 75MW thermal power plant. It includes the measurements of noise level around the boundary area of the plant, identification of noise propagating path, and discussion on the measures. Noise assessments are carried out based on the ISO 3744, ISO 9613-1 and ISO 9613-2 to predict the noise distribution of specific locations from the noise sources such as power transformers, flash vent-pipe, I.D.fan, and stack. It is identified the vent-pipe of flash tank in thermal power plant as the root cause of the environmental noise during the plant commissioning process.

  • PDF

Proposal on Guideline for Quality Assurance of Radiation Treatment Planning System

  • Oh, Yoonjin;Shin, Dong Oh;Kim, Juhye;Kwon, Nahye;Lee, Soon Sung;Choi, Sang Hyoun;Ahn, Sohyun;Park, Dong-wook;Kim, Dong Wook
    • Progress in Medical Physics
    • /
    • v.28 no.4
    • /
    • pp.197-206
    • /
    • 2017
  • We develop guidelines for the quality assurance of radiation treatment planning systems (TPS) by comparing and reviewing recommendations from major countries and organizations, as well as by analyzing the AAPM, ESTRO, and IAEA TPS quality assurance guidelines. We establish quality assurance items for acceptance testing, commissioning, periodic testing, system management, and security, and propose methods to perform each item within acceptable standards. Acceptance includes tests of hardware and network environments, data transmission, software, and benchmarking as specified by the system supplier, and apply the IAEA classification criteria. Commissioning includes dosimetric and non-dosimetric items for assessing TPS performance by applying the AAPM classification criteria and the latest technical items from the IAEA. Periodic quality assurance tests include daily, weekly, monthly, yearly, and occasional items by applying the AAPM classification criteria. System management and security items include the state and network connectivity of TPS, periodic data backup, and data access security. The guidelines for TPS quality assurance proposed in this study will help to improve the safety and quality of radiotherapy by preventing incidents related to radiotherapy.