• Title/Summary/Keyword: Collapse accident case

Search Result 22, Processing Time 0.023 seconds

A Study on the Bending Collapse at the Open Cross-Section Members with Experiment and Analysis (열린 단면 부재의 굽힘 붕괴 실험 및 해석에 관한 연구)

  • 이승철;강신유
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.21 no.4
    • /
    • pp.132-139
    • /
    • 2004
  • The open section members have been used as the members of vehicle such as automotives, airplanes and trains. When vehicles are crashed, these members have absorption of the energy and it is necessary for retainment of the survival space, and as the result, the prediction for the displacement of members in this case of the crash of vehicles is very important. The displacements of members in this case of the crash of automotives show combined aspect of both axial collapse and bending collapse. In the rollover accident when bending collapse happen, the collapse of each members is progressed by the plastic hinge which made from bending moment, and therefore the research for the behavior of members under bending moment after collapse is necessary to determine the internal energy which the members can absorb and the deformed shapes of the members on the step of design. In this paper, the characteristics of bending collapse at the members of the open cross-section were studied with experiment and numerical analysis. We made a comparative studied of the result of the experiment, and changed the axis according to the parallel-axis theorem.

A Study on Engineering Characteristics of Weak Rock Ground happened TBM Jaming accident in Tunnelling (TBM 터널 굴진시 Jamming이 발생되는 지반의 공학적 특성에 대한 연구)

  • Yu, Gil-Hwan
    • Journal of the Korea Construction Safety Engineering Association
    • /
    • s.45
    • /
    • pp.60-70
    • /
    • 2008
  • Mechanized tunnelling by TBMs has been extensively adopted for last two decades. Nevertheless, only few case histories have been reported. Unlike NATM tunnels, the case histories of the weak zone have been seldom reported for the mechanized tunnelling, even in the other countries. In this study, a collapse of TBM tunnel occurred in the severely altered weak rock zones between volcaniclastic rocks and granitic rocks was briefly described. A systematic geotechnical investigation, which was performed to examine the cause of the collapse, was carried out at the site and then characteristics of the rocks in the zones were evaluated. Moreover, This study propose a guide line of estimateing the possibility of collapse in TBM tunnels through comparing experimental results with surveying results of general rocks.

  • PDF

The illegal case and Improvement of Excavation (흙막이 굴착공사의 부실 사례 및 개선방향)

  • Choi, Jung-Bum;Shin, Seung-Mock
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.643-650
    • /
    • 2009
  • The necessary consequence by the rapid economic growth in large-scale urban excavation is increasing. If the site is the congested in downtown, the scale of excavation will get the large-scale and the extreme depth. We have achieved a high level technology internationally by the design and construction of underground excavation since 1980's. But the accidents during excavation are frequently occurring. So, this demage instigates the human life loss as well as economical loss. The recent accident is come about the damage for public facilities such as the railroad, subway and etc. in addition to the loss of life and property. For these reasons, the recent accident is being caused the damage of copious social overhead capital. The reasons of collapse during excavation can be classified roughly into the administrative part(sanction, permission), the investigation and design, the construction and management and etc. In this study the close check for the cases of the recent collapse is performed and the improvement course for the prevention of collapse is found.

  • PDF

Argumentation Analysis for 119 First aid Service and Policy (119 구급업무의 정책논쟁분석)

  • 우성천
    • Journal of Korean Institute of Fire Science & Engineering
    • /
    • v.1 no.2
    • /
    • pp.28-41
    • /
    • 2000
  • Since a few years ago, great disasters have often took place in domestic and abroad, such as Sampoong Department store collapse, Sea-land disaster accident, Incheon Hof fire accidents. Whenever a lot of accidents occurred such as fire, gas explosion, traffic accident, mountain accident, various disease, people required 119 first aid service. As the result, even for the last year, average 2,608 person per day were temporary treated and carried to near hospital by 119 system. But first-aid team or first grade EMT(emergency medical technician) that should provide high quality service and save important lives, might have negatively treated or made their duty only for simple transfer, when they were imminent of emergency case in every kinds of accident spot. Because they worried about medical dispute for "task restriction for EMT" decided by medical laws or rules of first aid. So it was proposed that "task restriction for EMT" should be mitigated or released in the possible range on this occasion.

  • PDF

Plastic Collapse Solution for API 5L X65 Natural Gas Linepipe (천연가스 수송용 API 5L X65 배관에 대한 소성붕괴해)

  • Kim Woo-sik;Shim Do-jun;Choi Jae-boong;Baek Jong-hyun
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.28 no.10
    • /
    • pp.1483-1491
    • /
    • 2004
  • To assess the integrity of the pipeline is the most important problem to be solved first of all for prevention of any fracture accident of the pipeline. As a result of exerting such efforts, a number of plastic collapse assessment equations have been suggested, however, the scope of using or applying such assessment equations has not been exactly defined. In this study, the case that a surface crack existed in the circumferential direction in the external side of the natural gas pipeline and a bending load was applied to the pipeline was analytically identified as the most critical condition, and a plastic collapse assessment equation fur it was suggested. The flow stress of the API X65 linepipe was defined through the experiment conducted on SENT specimens. Also, a local assessing criterion of a 3-dimensional crack behavior considering not only the crack depth but also the crack length was suggested. Finally, a plastic collapse assessment equation for the API X65 linepipe was developed by performing the 3-dimensional finite element analysis.

Development of Emergency Restoration Scenarios for Railway Accident using Analytic Network Process (네트워크분석적 의사결정기법을 이용한 철도사고 임시복구시나리오 개발)

  • Sung, Deok-Yong;Park, Yong-Gul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.5D
    • /
    • pp.727-737
    • /
    • 2011
  • The emergency restoration scenarios for efficient railway accident management and restoration were developed. The emergency restoration procedures defined by the worst case of emergency restoration and the important events was proposed based on questionnaires from specialists and the result of survey. Via these studies, the railway accident in the tunnel could be the worst case among all railway accident types. Therefore, educations for a restoration team in confined area condition should be planned and performed to recover the worst case accident. In order for the emergency restoration, when a railway accident is occurred, the restoration should be performed in orders of handing collapse of facilities, burying track, and derailment of vehicle in tunnel based on the statistical analysis. The result of priorities were established by the period of restoration. The standard operation system for efficient railway accident management was developed by synthesizing the worst case for rapid emergency restoration, and important events for the standard operation procedures according to each emergency restoration type. Through this study, the restoration operation system of railway accident are recommended. This paper suggests to develop emergency restoration scenarios for the efficient railway accident management and recovery system. The study results will contribute not only for insuring punctuality, but also for minimizing delays from accidents. Therefore, emergency restoration scenarios will play a major role in the SOP for the damage limitation and the prevention of accident spread.

Proposal of Construction System to prevent Dongbari Collapse by applying IT Convergence Technology (IT 융합기술을 적용한 동바리 붕괴사고 방지를 위한 건설공사 시스템 제안)

  • Jeon, Kyong-Deck;Shin, Seung-Jung
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.20 no.5
    • /
    • pp.113-120
    • /
    • 2020
  • Safety accidents, called industrial accidents in construction work, are causing a lot of casualties, property damage and social controversy in the event of an accident, causing the construction to lose public confidence. The risk of safety accidents at construction sites may continue to increase as the construction of high-rise, large-scale, and multi-purpose complex buildings has increased in recent years. In particular, the most frequently constructed apartment construction among reinforced concrete buildings is designed and constructed with a wall-like structure with no beams for each floor, while the lower floors are made of lamen with columns and beams. As a result, the transfer beam or transfer slab to withstand the upper load is installed on the upper part of the Ramen structure, so the system Dongbari, which is installed as a temporary material during concrete laying construction, may collapse at any time during plowing and curing. The purpose of this study is to apply IT convergence technology to prevent the collapse of the system Dongbari during concrete installation, and to apply many of the variables that may occur during construction on a case-by-case basis to check the stability of the system Dongbari and to propose a model of the anti-conducting prediction system.

A Study on the Crisis Management Standard Manual for Large-scale Human Accident at Workplace for Efficiency of Disaster Response (재난대응 효율화를 위한 사업장 대규모 인적사고 위기관리 표준매뉴얼 개정방안 연구)

  • Woo Sub Shim;Sang Beam Kim
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.3
    • /
    • pp.656-664
    • /
    • 2023
  • Purpose: The Ministry of Employment and Labor manages disasters based on the standard manual for risk management of large-scale human accidents in workplaces when large-scale disasters such as fires and collapses occur in workplaces. We are going to check the standard manual currently in operation and suggest improvement plans for the insufficient items. Method: Accordingly, the standard manual was checked together with internal and external experts in the disaster management manual and disaster management staff at headquarters and local government offices, and items to be improved were identified with priority. Result: In case of a collapse accident, it is necessary for the Ministry of Public Administration and Security to accurately present the selection criteria in order to eliminate the controversy over the selection of the disaster management department. In addition, it seems necessary to supplement the details of the disaster safety communication network operation and evacuation guidelines. Conclusion: In the future, in order to improve the disaster management system that meets the public's eye level, it is expected to prepare a standard manual for risk management of large-scale human accidents in workplaces that guarantees the lives and safety of workers through the collection of opinions from experts in the relevant field, disaster management personnel, and the general public.

Delayed Bronchoplasty in Complete Transection of Left Main Bronchus after Blunt Trauma (외상성 좌측주기관지 절단환자의 지연수술 치험)

  • 김명천;이재영;조규식;박주철;유세영
    • Journal of Chest Surgery
    • /
    • v.31 no.2
    • /
    • pp.182-185
    • /
    • 1998
  • Recently, The non-penetrating injury of bronchus has been increased, especially by traffic accident. Early diagnosis and primary repair of bronchial injury not only restore normal lung function but also avoid the difficulties and complications associated with delayed diagnosis and repair. This report describes about a case of total collapse and consolidation of left lung with the complete transection of nearly bifurcated portion of left main bronchus , lasted for 2weeks after traffic accident. This was diagnosed by fiberbronchoscopy and 3-D chest computed tomography(CT). She underwent the sleeve resection and end to end anastomosis, and postoperative PEEP for 2 days, suctioning twice by fiberbronchoscopy, continue postural drainge and physiotherapy were applied. She had almost full expansion of the left lung at discharge.

  • PDF

A Experimental Study on Performance Improvement Factors of Used V4 Steel Pipe Support (재사용 V4 강재 파이프 서포트의 성능향상 요인에 관한 실험적 연구)

  • Choi, Myeongki;Park, Jongkeun
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.3
    • /
    • pp.43-48
    • /
    • 2020
  • It is considered that most of reusable pipe supports, which are used as formwork support posting at construction sites, do not meet the performance standard. Due to the use of reusable pipe supports that do not meet such performance standard the potential risk of collapse accident is increasing. Therefore, this study identifies the status of compliance with performance standard, and presents the requirements for improving quality control to prevent the collapse of pipe supports reused at the construction site. First, if the female thread of the product with no clearance and new support pin with the diameter of 12mm are replaced at the same time for use, it is considered that the performance will be improved. Second, as the quality performance during use can be improved in the case of larger thickness of inner diameter compared to the case of larger thickness of outer diameter, it is necessary to increase the inner pipe thickness greatly than the current thickness. Based on the results of this study, it is expected that the performance the reusable pipe support (V4) can be improved, if the diameter of the support pin is 12mm, the female thread has a small clearance, and the inner tube thickness is 2.3 ~ 2.7mm. In addition, it is considered that other performance improvement factors included in the study results could be used as important data for improving the performance of reusable pipe support.