A dust injection system was developed for the lime calcining rotary kiln for the coke dust from the coke dry quenching(CDQ) facility to be used as a fuel. The CDQ dust was injected with the gaseous fuel through the hole in the burner. In order to prevent the spot heating large particles should be removed from dust and dust should be injected as fast as possible so that particle combustion lasts as long as possible without precipitation. This is especially necessary when dust is burned together with gaseous fuel because the gaseous fuel can not go so far and in addition dust combustion aggravates hot spot heating. In this research a rotation drum screen was used to remove particles with diameter larger than 4mm and dust injection speed was 40m/sec. And the burner was adjusted not to use swirl that hinders flame go far away. With these measures scale generation iside the kiln could be reduced to be negligible and in addition NOx emission could be reduced from 150ppm to 20ppm. The fuel reduction was about 85Mcal/T-lime.
마이크로파 가열 공정에 의하여 스테인레스강 제조시의 발생하는 분진의 환원거동올 환원제로서 코크스와 목탄을 이용하여 조사하였다. 원래 상태의 펠릿 분진과 환원제로서, 펠릿을 만든 분진을 마이크로파 가열오븐 내에서 $1000^{\circ}C$까지 가열하여 환원시켰다. 코크스에 비하여 목탄의 경우가 더 높은 환원율율을 나타내었다. 마이크로파 오븐에서 500W와 700W의 사용한 경우 유사한 환원율을 나타냈으며 200분 이내에 급속하게 환원되였다. 환원정도는 Fe>Ni>Cr로 감소되었다.
EAF dust 처리를 위해 RAPID system으로 명명된 Extended Arc Plasma Furnace 공정개발의 기초자료를 확보하기 위해서 EAF dust 처리공정의 초기반응 단계에서 코크스에 의한 EAF dust의 고욘열적거동을 조사하였다. 실험조건은 반응기내의 온도를 1000, 1100, 1200 및 130$0^{\circ}C$로 변화시키고, 각각의 반응온도에 대해서 반응시간이 3, 5, 8 및 12분인 경우에 석회석의 소성, EAF dust 자체의 열분해, EAF dust 혼합시료의 환원 및 휘발거동을 파악하였다. RAPID system에서 EAF dust의 용융 및 환원에 적합한 탄소환원 당량 180%와 염기도 1.7를 고려하여 혼합시료(EAF dust: 코크스 : 석회석=80:10:10 wt%)를 제조하였으며, 각 시료의 크기는 약 0.1mm 이하로써 입도분포는 200 mesh 이하가 80%를 나타내고 있다. 석회석의 소성은 $1100^{\circ}C$이상에서 3분이내에 완결되었으며, EAF dust 자체를 열분해시켰을 경우 $1300^{\circ}C$ 및 12분인 경우에 약 14%의 무게감량이 일어났고, 일부 입자들의 부분적인 소결 및 용융현상이 관찰되었다. EAF dust 혼합시료는 초기 반응단계에서 반응온도 및 반응시간이 증가함에 따라서 무게 감량폭이 더 증가하였으며, $1300^{\circ}C$ 및 12분인 경우에 46%이 무게감량이 일어났다 이와 같이 EAF dust의 휘발 및 환원 거동에 관련된 무게감량 정보는 공정내에서 EAF dust의 처리시간을 결정하여 주고 궁극적으로 대용량의 전기로 분진처리 공정 설계시 전기로 분진의 처리량을 결정하는 주요인자중의 하나로써 사용될 수 있다.
대한전자공학회 2001년도 The 6th International Symposium of East Asian Resources Recycling Technology
/
pp.393-397
/
2001
The innovatory process, that is the direct separation and recovery of the iron and zinc metals contained in the high temperature exhaust gas generated from the electric arc furnace fer the inn scrap melting and/or the dust treatment, has been proposed. This proposed process consists of the moving coke bed filter that is directly connected to the electric furnace, and the following heavy metal condenser. The exhaust gas passes through the filter and the condenser right after exhausting from the electric furnace. The moving coke bed filter is being controlled at about 1000℃ and collects iron and slag components contained in the high temperature exhaust gas. Heavy metals such as zinc and lead pass through the filter as vapor. Based on the thermodynamic considerations, the iron oxide and the zinc oxide are reduced in the filter. The solution loss reaction rate is comparatively low at about 1000℃ in the coke bed filter by the analysis using the mathematical simulation model. The heavy metal condenser is installed in the position after the coke bed filter, and rapidly cools the gas from about 1000℃ to 450℃ by a full of the cooling medium like the solid ceramic ball in addition to the cooling from the wall. The zinc and lead vapor condense and separate f개m the gas in a liquid state. The investigation of the characteristics of the exhaust gas of the commercial electric arc furnace, the fundamental experiments of the laboratory scale and the bench scale ensured the formation of this proposed process. A small-scale pilot plant examination is carrying out at present to confirm the formation of the process. It is certain that the dust generation of the electric arc furnace is extremely decreased, and it can save the energy consumption of usual dust treatment processes by the realization of this process.
대한전자공학회 2001년도 The 6th International Symposium of East Asian Resources Recycling Technology
/
pp.370-374
/
2001
The degree of iron recovery from dust agglomerates was investigated experimentally to determine the optimum mixing ratio of coke in cold bonded pellet(CBP) which is fed into electric arc furnace(EAE) in the minimill plant. From the XRD analysis for EAF dust, magnetite(Fe$_3$O$_4$) and franklinite(ZnFe$_2$O$_4$) was identified as major components. Maximum iron recovery was obtained for the solid carbon content of approximately 18 weight percent. From plant trials of CBP composed of this optimal mixing condition, it was observed that electric power consumption and sulfur content increased with increasing the quantity of CBP.
A pilot-scale pulse-jet bagfilter was designed, built and tested for the effects of four operating conditions (filtration velocity, inlet dust concentration, pulse pressure, and pulse interval time) on the total system pressure drop, using coke dust from a steel mill factory. Two models were used to predict the total pressure drop according to the operating conditions. These model parameters were estimated from the 180 experimental data points. The empirical model (EM) with filtration velocity, areal density, inlet dust concentration, pulse interval time and pulse pressure shows the best correlation coefficient (R=0.971) between experimental data and model predictions. The empirical model was used as it showed higher correlation coefficient (R=0.971) compared to that of the Multivariate linear regression(MLR) (R=0.961). The minimum pulse pressure predicted by empirical model (EM) was 5kg/$cm^2$.
In this study, using coke dust from ironwork, the pulse pressure on a pulse air jet bag filter was investigated considering the influence of the pressure loss due to filtration velocity and pressure intervals. The research on the optimal pulse pressure prediction of a pulse air jet type bag filter using coke dust showed the following results. Pressure loss volatility produced by the pulse pressure under low dust concentration(0.5, $1g/m^3$) and low face velocity(1.25 m/min) was less than $10mmH_2O$. This suggests that the pulse pressure has a low impact on the pressure loss. In contrast, pressure loss volatility under high dust concentration($3g/m^3$) and high face velocity(1.75 m/min) was $25mmH_2O$. Therefore, pulse pressure with high dust concentration and high face velocity has a strong influence on the pressure loss volatility, compared to the condition of low dust concentration and low face velocity. The optimal pulse pressure of inlet dust concentration($0.5g/m^3$) was $6kg/cm^2$ under the same face velocity(1.75 m/min). As concentration increased from 1 to $2g/m^3$, the pulse pressure gradually reached $5kg/cm^2$ thus indicating that the pulse pressure($5kg/cm^2$) is pertinent at a high concentration($3g/m^3$). The pulse intervals: 20, 25 and 30 sec, which are relatively longer than 10 and 15 sec, corresponded to high pressure loss volatility produced by the pulse pressure. Furthermore, low pressure loss volatility was noted at $5kg/cm^2$ of the overall pulse pressure.
The new empirical static model was constructed on the basis of dimension analysis to predict the pressure drop according to the operating conditions. The empirical static model consists of the initial pressure drop term (${\Delta}P_{initial}$) and the dust mass number term($N_{dust}=\frac{{\omega}_0{\nu}_f}{P_{pulse}t}$), and two parameters (dust deposit resistance and exponent of dust mass number) have been estimated from experimental data. The optimum injection distance was identified in the 64 experimental data at the fixed filtration velocity and pulse pressure. The dust deposit resistance ($K_d$), one of the empirical static model parameters got the minimum value at d=0.11m, at which the total pressure drop was minimized. The exponent of dust mass number was interpreted as the elasticity of pressure drop to the dust mass number. The elasticity of the unimodal behavior had also a maximum value at d=0.11m, at which the pressure drop increased most rapidly with the dust mass number. Additionally, the correlation coefficient for the new empirical static model was 0.914.
폴리에스터와 스테인레스스틸섬유를 재료로 제조된 제전사여과포에 대한 물리화학적 특성시험 및 여과포성능 기초시험을 수행하였다. 실험용먼지로 제철.제강, 시멘트제조, 열공급시설 및 폐기물공정에서 채취된 먼지를 처리하여 사용하였다. 제전사여과포의 물리화학적 특성 실험에서는 산성분위기하에서 인장강도 및 초기탄성계수변화를 조사하였고, Automated Permporometer를 이용하여 평균흐름세공압력, 기포점 세공지름, 평균흐름세공지름 및 세공크기분포를 구하였다. 또한 벤처규모의 여과포 기초성능 시험장치를 이용하여 먼지부하에 따른 압력손실, 먼지통과율 및 여과포성능 평가지표를 산출하였다. 산성가스 및 분위기하에서 제전사여과포의 인장강도는 온도 및 노출시간과 깊은 관련이 있었다. 압력손실은 여과속도와 먼지부하가 증가함에 따라 증가하였으며 증가형태는 먼지의 종류에 따라 달랐다. 먼지 통과율은 먼지종류에 관계없이 먼지부하의 증가에 따라 급격히 감소하는 경향을 나타내었다. 여과포성능지표는 먼지 포집 초기에는 증가했다가 급격히 감소하여 일정하게 유지되었다.
전기로 제강분진 중에는 아연(Zn), 납(Pb)등과 같은 유가금속들이, 다양한 화합물(산화물 또는 염화물 등)의 형태로 다량 함유되어 있다. 전기로 제강분진 내에 함유되어 있는 이들 유용금속원소들을, 가장 효율적이며 안정적으로 회수할 수 있는 대표적인 방법으로서는 Rotary Kiln Process가 있다. Rotary Kiln Process는 전기로 제강분진에 환원제(Coke, 무연탄)와 석회석(염기도 제어용)을 첨가하여 성형한 후에 가열함으로서, 아연성분을 조산화아연(Crude Zinc Oxide : 60% Zn)의 형태로 회수하는 방법으로 오래전에 이미 상용화되었으며, 지금도 공정 및 설비의 단점을 개선하기 위한 연구개발을 지속적으로 수행하고 있다. 현재 국내에서도 전기로 제강분진을 재활용하여 조산화아연을 생산하는 다수의 상용화공장들이 가동되고 있다. 조산화아연 중에는, 아연성분 외에도 다양한 기타의 성분원소들(Pb, Cd, Sn, In, Fe, Cl, F 등)이 산화물, 염화물, 알칼리 화합물 등의 형태로 함께 혼재되어 있다. 그러므로 조산화아연을 건식 또는 습식아연제련용 원료로서 그대로 사용하게 되면 조산화아연에 함유된 이들 불순물 성분들이 미치는 악영향으로 인하여, 아연제련과정에서 많은 문제점들이 발생하므로. 따라서 이들 불순물 성분원소들을 가능하면 모두 제거하기 위한 건식 또는 습식정제공정이 추가로 필요하다. 따라서 본 연구에서는 조산화아연의 건식휘발 정제공정에서 발생되어 백필터에 포집된 아연(Zn) 및 납(Pb)을 함유한 2차분진(2nd Dust)으로부터 아연(Zn)과 납(Pb)을 효율적으로 분리하고, 더욱 부가가치를 높이기 위하여 Zn-cementation법으로 이들 성분원소들을 금속탄산염의 형태로 분리회수할 수 있는 공정기술에 대하여 기초적인 연구를 수행하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.