• Title/Summary/Keyword: Cloud-BIM

Search Result 60, Processing Time 0.022 seconds

Analysis of overlap ratio for registration accuracy improvement of 3D point cloud data at construction sites (건설현장 3차원 점군 데이터 정합 정확성 향상을 위한 중첩비율 분석)

  • Park, Su-Yeul;Kim, Seok
    • Journal of KIBIM
    • /
    • v.11 no.4
    • /
    • pp.1-9
    • /
    • 2021
  • Comparing to general scanning data, the 3D digital map for large construction sites and complex buildings consists of millions of points. The large construction site needs to be scanned multiple times by drone photogrammetry or terrestrial laser scanner (TLS) survey. The scanned point cloud data are required to be registrated with high resolution and high point density. Unlike the registration of 2D data, the matrix of translation and rotation are used for registration of 3D point cloud data. Archiving high accuracy with 3D point cloud data is not easy due to 3D Cartesian coordinate system. Therefore, in this study, iterative closest point (ICP) registration method for improve accuracy of 3D digital map was employed by different overlap ratio on 3D digital maps. This study conducted the accuracy test using different overlap ratios of two digital maps from 10% to 100%. The results of the accuracy test presented the optimal overlap ratios for an ICP registration method on digital maps.

Guideline of Building Information Modeling(BIM) Service Application Level using Service Level Agreement(SLA) in the Procurement Phase (발주단계에서 SLA를 활용한 BIM 서비스 적용 수준에 관한 연구)

  • Kim, Ji-Yun;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.1
    • /
    • pp.83-90
    • /
    • 2017
  • Recently, BIM has been actively adopted in construction projects and industries, and also integrated with Information and Communications Technology(ICT) such as cloud computing technology, sensor technology, 3D scanning and printing technology etc. However, it is very difficult to efficiently utilize BIM services, technologies and collaborate with each other because of differences of usage and requirements of technologies. Every participant in the same construction project has their own needs, requirements and details of the model in each phase. In order to enhance utilization BIM model, BIM services and technologies required in their project have to be clearly defined in the initial stage of the project. In order to support the owner to define the BIM level, BIM service level and application technologies are identified and guidelines how to define the level and technologies for their project purpose are suggested in this study.

A Study on 3D Indoor mapping for as-built BIM creation by using Graph-based SLAM (준공 BIM 구축을 위한 Graph-based SLAM 기반의 실내공간 3차원 지도화 연구)

  • Jung, Jaehoon;Yoon, Sanghyun;Cyrill, Stachniss;Heo, Joon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.32-42
    • /
    • 2016
  • In Korea, the absence of BIM use in existing civil structures and buildings is driving a demand for as-built BIM. As-built BIMs are often created using laser scanners that provide dense 3D point cloud data. Conventional static laser scanning approaches often suffer from limitations in their operability due to the difficulties in moving the equipment, the selection of scanning location, and the requirement of placing targets or extracting tie points for registration of each scanned point cloud. This paper aims at reducing the manual effort using a kinematic 3D laser scanning system based on graph-based simultaneous localization and mapping (SLAM) for continuous indoor mapping. The robotic platform carries three 2D laser scanners: the front scanner is mounted horizontally to compute the robot's trajectory and to build the SLAM graph; the other two scanners are mounted vertically to scan the profiles of surrounding environments. To reduce the accumulated error in the trajectory of the platform through loop closures, the graph-based SLAM system incorporates AdaBoost loop closure approach, which is particularly suitable for the developed multi-scanner system providing more features than the single-scanner system for training. We implemented the proposed method and evaluated it in two indoor test sites. Our experimental results show that the false positive rate was reduced by 13.6% and 7.9% for the two dataset. Finally, the 2D and 3D mapping results of the two test sites confirmed the effectiveness of the proposed graph-based SLAM.

Performance Evaluation of Denoising Algorithms for the 3D Construction Digital Map (건설현장 적용을 위한 디지털맵 노이즈 제거 알고리즘 성능평가)

  • Park, Su-Yeul;Kim, Seok
    • Journal of KIBIM
    • /
    • v.10 no.4
    • /
    • pp.32-39
    • /
    • 2020
  • In recent years, the construction industry is getting bigger and more complex, so it is becoming difficult to acquire point cloud data for construction equipments and workers. Point cloud data is measured using a drone and MMS(Mobile Mapping System), and the collected point cloud data is used to create a 3D digital map. In particular, the construction site is located at outdoors and there are many irregular terrains, making it difficult to collect point cloud data. For these reasons, adopting a noise reduction algorithm suitable for the characteristics of the construction industry can affect the improvement of the analysis accuracy of digital maps. This is related to various environments and variables of the construction site. Therefore, this study reviewed and analyzed the existing research and techniques on the noise reduction algorithm. And based on the results of literature review, performance evaluation of major noise reduction algorithms was conducted for digital maps of construction sites. As a result of the performance evaluation in this study, the voxel grid algorithm showed relatively less execution time than the statistical outlier removal algorithm. In addition, analysis results in slope, space, and earth walls of the construction site digital map showed that the voxel grid algorithm was relatively superior to the statistical outlier removal algorithm and that the noise removal performance of voxel grid algorithm was superior and the object preservation ability was also superior. In the future, based on the results reviewed through the performance evaluation of the noise reduction algorithm of this study, we will develop a noise reduction algorithm for 3D point cloud data that reflects the characteristics of the construction site.

Definition of 3D Modeling Level of Detail in BIM Regeneration Through Reverse Engineering - Case Study on 3D Modeling Using Terrestrial LiDAR - (역설계를 통해 BIM 구축시에 3D 모델링에 대한 세밀도(LoD) 정립 - 지상 LiDAR 활용한 3D 모델링 연구 중심 -)

  • Chae, Jae-Hyun;Lee, Ji-Yeong
    • Journal of KIBIM
    • /
    • v.7 no.4
    • /
    • pp.8-20
    • /
    • 2017
  • When it comes to set up the BIM through the reverse engineering, the level of detail(LoD) required for finalized outcomes is different from each purpose. Therefore, it is necessary to establish some concrete criteria which describe the definition of LoDs on 3D modeling for the purpose of each reverse engineering. This research shows the criteria of the 1) positional accuracy, 2) generalization level, 3) scale level, 4) scope of description, and 5) the area available for application by classifying LoD from 1 to 6 on 3D modeling for each purpose of reverse engineering. Moreover, through applying those criteria for the 3D point cloud dataset of building made by terrestrial LiDAR, this research finds out the working hour of 3D modeling of reverse engineering by each LoDs according to defined LoD criteria for each level. It is expected that those findings, how those criteria of LoD on reverse engineering are utilized for modeling-workers to decide whether the outcomes can be suitable for their budget, applicable fields or not, would contribute to help them as a basic information.

A Study on the Improvement of Repair and Reinforcement Quantity Take-off in Fire-damaged Area Using 3D Laser Scanning (3D Laser Scanning을 활용한 화재 손상 부위의 보수·보강 물량 산출 방식 개선에 관한 연구)

  • Jeong, Hoi-Jae;Ham, Nam-Hyuk;Lee, Byoung-Do;Park, Kwang-Min;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.9 no.1
    • /
    • pp.11-21
    • /
    • 2019
  • Recently, there is an increase in fire incidents in building structures. Due to this, the importance of fire-damaged buildings' safety diagnosis and evaluation after fire is growing. However, the existing fire-damaged safety diagnosis and evaluation methods are personnel-oriented, so the diagnostic results are intervened by investigators' subjectivity and unquantified. Thus, improper repair and reinforcement can result in secondary damage accidents and economic losses. In order to overcome these limitations, this study proposes using 3D laser scanning technology. The case analysis of fire-damaged building structures was conducted to verify the effectiveness of accuracy and manpowering by comparing the existing method and the proposed method. The proposed method using 3D laser scanning technology to obtain point cloud data of fire-damaged field. The point cloud data and BIM model is combined to inspect the fire-damaged area and depth. From inspection, quantified repair and reinforcement quantity take-off can be acquired. Also, the proposed method saves half of the manpowering within same time period compared to the existing method. Therefore, it seems that using 3D laser scanning technology in fire-damaged safety diagnosis and evaluation will improve in accuracy and saving time and manpowering.

Development of Deep Learning-based Automatic Classification of Architectural Objects in Point Clouds for BIM Application in Renovating Aging Buildings (딥러닝 기반 노후 건축물 리모델링 시 BIM 적용을 위한 포인트 클라우드의 건축 객체 자동 분류 기술 개발)

  • Kim, Tae-Hoon;Gu, Hyeong-Mo;Hong, Soon-Min;Choo, Seoung-Yeon
    • Journal of KIBIM
    • /
    • v.13 no.4
    • /
    • pp.96-105
    • /
    • 2023
  • This study focuses on developing a building object recognition technology for efficient use in the remodeling of buildings constructed without drawings. In the era of the 4th industrial revolution, smart technologies are being developed. This research contributes to the architectural field by introducing a deep learning-based method for automatic object classification and recognition, utilizing point cloud data. We use a TD3D network with voxels, optimizing its performance through adjustments in voxel size and number of blocks. This technology enables the classification of building objects such as walls, floors, and roofs from 3D scanning data, labeling them in polygonal forms to minimize boundary ambiguities. However, challenges in object boundary classifications were observed. The model facilitates the automatic classification of non-building objects, thereby reducing manual effort in data matching processes. It also distinguishes between elements to be demolished or retained during remodeling. The study minimized data set loss space by labeling using the extremities of the x, y, and z coordinates. The research aims to enhance the efficiency of building object classification and improve the quality of architectural plans by reducing manpower and time during remodeling. The study aligns with its goal of developing an efficient classification technology. Future work can extend to creating classified objects using parametric tools with polygon-labeled datasets, offering meaningful numerical analysis for remodeling processes. Continued research in this direction is anticipated to significantly advance the efficiency of building remodeling techniques.

Construction of BIM based Building 3D Spatial Information Using Terrestrial LiDAR (지상 LiDAR를 이용한 BIM 기반 건물의 3D 공간정보 구축 연구)

  • Kim, Kyeong-Min;Lee, Kil-Jae;Cho, Gi-Sung
    • Journal of Cadastre & Land InformatiX
    • /
    • v.46 no.1
    • /
    • pp.23-35
    • /
    • 2016
  • Recently, along with the development of IT, the non-linearity and enlargement in the response to the combination of the building industry and IT have made a wide variety in outer shapes of the buildings. So buildings need a more accurate representation using visually superior three-dimensional space information. Therefore, the study models the shapes of the other buildings in accordance with the heights. Frist of all, we measured the buildings using a Terrestrial LiDAR. Second, we obtained a high-density point cloud date of the buildings. Through this data, we made the BIM model and compared the heights of each floor's outer information layers. And then identified the BIM data status using IFC standards formats. From this data, it proposes a new 3D cadastre and the alternative for the establishment of spatial information.

Economic application of structural health monitoring and internet of things in efficiency of building information modeling

  • Cao, Yan;Miraba, Sepideh;Rafiei, Shervin;Ghabussi, Aria;Bokaei, Fateme;Baharom, Shahrizan;Haramipour, Pedram;Assilzadeh, Hamid
    • Smart Structures and Systems
    • /
    • v.26 no.5
    • /
    • pp.559-573
    • /
    • 2020
  • One of the powerful data management tools is Building Information Modeling (BIM) which operates through obtaining, recalling, sharing, sorting and sorting data and supplying a digital environment of them. Employing SHM, a BIM in monitoring systems, would be an efficient method to address their data management problems and consequently optimize the economic aspects of buildings. The recording of SHM data is an effective way for engineers, facility managers and owners which make the BIM dynamic through the provision of updated information regarding the occurring state and health of different sections of the building. On the other hand, digital transformation is a continuous challenge in construction. In a cloud-based BIM platform, environmental and localization data are integrated which shape the Internet-of-Things (IoT) method. In order to improve work productivity, living comfort, and entertainment, the IoT has been growingly utilized in several products (such as wearables, smart homes). However, investigations confronting the integration of these two technologies (BIM and IoT) remain inadequate and solely focus upon the automatic transmission of sensor information to BIM models. Therefore, in this composition, the use of BIM based on SHM and IOT is reviewed and the economic application is considered.

Applying BIM and GIS to Railway Maintenance Works in Taiwan

  • Liu, Li-Shih;Shr, Jin-Fang
    • International Journal of Aerospace System Engineering
    • /
    • v.2 no.1
    • /
    • pp.18-23
    • /
    • 2015
  • Based on real jobs, this study was carried out the Railway maintenance works in Taiwan. It hopes to use Geographic Information System(GIS) and Building Information Modeling(BIM) for changing the maintenance model from "post-damage repair" to "preventive maintenance". Accordingly, this research will build a Railway Repairing Database that installs all repair data. This database will also connect to GIS so that can be the source of analysis and statistic for repair paln. The main results of research are as follows: I. All data stored on cloud space that raises the ability to manage and plan on repair. II. Simplify the file work and increase the quantity of case data to the manager who can get more reliable source. III. The data offer objective judgment to avoid subjective argument. IV. Add the GIS information to improve the maintenance because of good analisis.