• Title/Summary/Keyword: Claim Factor

Search Result 69, Processing Time 0.03 seconds

A empirical study on the Employee's Workplace Satisfaction for Insurance Claim adjusting company (손해사정회사 종업원의 직장만족 결정요인 연구)

  • Kim, Jaetae;Yoo, kyungjin;Choi, Youngjin;Kim, Jongwon
    • Journal of the Society of Disaster Information
    • /
    • v.11 no.2
    • /
    • pp.245-252
    • /
    • 2015
  • Employee's workplace satisfaction of claim adjusting company, who assesses the loss of catastrophe, have a direct influence on the loss evaluation job. Eventually their satisfaction would affect the compensation satisfaction of victims, therefore it is one of important factors for victims's compensation satisfaction. This paper analyzes empirically the determinants of employee's satisfaction to their firm for a claim adjusting company. As a result of the empirical research, it is found that the statistically significant determinant are the psychological factor, the organizational factor, and the individual factor. Among the significant factors, the psychological factor has the biggest positive factor. And the organizational factor and the individual factor is next with similar positive measurement. But the cognitive factor is not statistically significant. A claim adjusting company may use the research result for the improvement of employee's workplace satisfaction.

A Study of Analyzing Claim Factor on the Reconstruction Projects (재건축 사업의 클레임 요인 분석에 대한 연구)

  • Shin, Yoon-Kyung;Choi, Hyun-Sang;Lee, Kyung-Ha;Cho, Sung;Pack, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.231-234
    • /
    • 2009
  • Because a procedure is complicated and various related parties participate in the redevelopment and reconstruction project, is can be extended to diverse claims when the relation with the related parties is smoothly adjusted. In particular, the association must give up many rights of invisible parts because they are short of professionalism about the business. Accordingly, the study is to analyze claim factor based on case of Supreme Court.

  • PDF

A Study on Analyzing Effect of Claim Factoy to Prevent Claim in Early Stage for Construction Project - Focusing on Turn-Key Project - (건설 프로젝트 초기단계에서의 클레임 방지를 위한 클레임 요인 영향도 분석에 관한 연구 - 턴키공사 사레 중심으로 -)

  • Yoon Jun-Seon;Seo Choon-Taek
    • Journal of Arbitration Studies
    • /
    • v.15 no.1
    • /
    • pp.95-112
    • /
    • 2005
  • In the inner turn key constructions the problems of uniform types are repeatedly occurred, and, especially, many problems happen up to the stage of pre-construction(from a bid to a contract) owing to the specialties of the turn key constructions. So the claim factors of the Korean turn key constructions were abstracted in antecedent paper. When the technicians meeting the interior turn key constructions for the first time and working here now are well acquainted with only these factors, many claims will be prevented. By analysing the degree of claims by claims factors through the questionnaires to the experts about the abstracted factors and surveying the amount of the claims through the case studies, what factors exerted how much of influence on the claims was tested and analyzed. Studying and Managing the factors affecting the claims much led the technicians in charge of internal turn key constructions to the prevention and the proper solution of the site claims.

  • PDF

A Study of Analyzing Claim Factor and Making Strategies to Prevent Claim in Early Stage for Architectural Turn-key Project - Focusing on Domestic Project - (건축턴키공사 초기 단계에서의 클레임 방지를 위한 클레임요인 분석 및 대응방안에 관한 연구 - 국내공사 사례중심으로 -)

  • Yoon Jun-Seon;Yoo Byoung-Eok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.1 s.19
    • /
    • pp.93-99
    • /
    • 2006
  • In the inner turn key constructions the problems of uniform types are repeatedly occurred, and, especially, many problems happen up to the stage of pre-construction(from a bid to a contract) owing to the specialties of the turn key constructions. So the claim factors of the Korean turn key constructions were abstracted through the literature searches, the site document examinations, the case studies and the interviews with the experts. When the technicians meeting the interior turn key constructions for the first time and working here now are well acquainted with only these factors, many claims will be prevented. By analysing the degree of claims by claims factors through the questionnaires to the experts about the abstracted factors and surveying the amount of the claims through the case studies, what factors exerted how much of influence on the claims was tested and analyzed. Proposing the response devices to the factors affecting the claims much led the technicians in charge of internal turn key constructions to the prevention and the proper solution of the site claims.

Preliminary Study on the Factors Analysis of Change Order-Claim in Design-Build Project (설계시공일괄입찰공사의 설계변경 클레임요인 분석에 관한 기초 연구)

  • Ryu, Hyeok-Jun;Park, Byung-Ju;Yoo, Seung-Kyu;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.129-130
    • /
    • 2012
  • Although the order of Design-Build is being expanded by increasing construction scale and demanding hybrid function, the suitable regulation of the contracts is not settled. Design-Build is way by government because there are big construction of much government leading in contract relation high position occupy. So, case that prebendary's claim institution develops by litigation is very rare. But, recently Design-Build is magnified. So, these dispute factors is becoming visualization gradually. The contract system is needed to be consistent by international standard to deal with the problem. This study suggests the useful solutions in detail concerned with the main factor of change order claim by each Design-Build phases through practical sorting and analysis of the causes of Change Order-Claim.

  • PDF

A Sduty of Analyzing Claim Factor and Making Strategies to Prevent Claim in Bidding and Contracting Stage for Architectural Turn-Key Project (건축턴키공사 입찰.계약 단계에서의 클레임 예방을 위한 클레임요인 분석 및 대응방안에 관한 연구 - 국내대형건축턴키공사 사례중심으로 -)

  • 윤준선;백준홍
    • Journal of Arbitration Studies
    • /
    • v.13 no.2
    • /
    • pp.353-376
    • /
    • 2004
  • In the inner turn key constructions the problems of uniform types are repeatedly occurred, and, especially, many problems happen up to the stage of pre-construction(from a bid to a contract) owing to the specialties of the turn key constructions. So the claim factors of the Korean turn key constructions were abstracted through the literature searches, the site document examinations, the case studies and the interviews with the experts. When the technicians meeting the interior turn key constructions for the first time and working here now are well acquainted with only these factors, many claims will be prevented. By analysing the degree of claims by claims factors through the questionnaires to the experts about the abstracted factors and surveying the amount of the claims through the case studies, what factors exerted how much of influence on the claims was tested and analyzed. Proposing the response devices to the factors affecting the claims much led the technicians in charge of internal turn key constructions to the prevention and the proper solution of the site claims.

  • PDF

A Study on the Analysis of Change Order - Claim in Design-Build (설계시공 일괄입찰공사에서 설계변경 클레임요인의 분석에 관한 연구)

  • Lee, Sang-Beom;Hwang, Jae-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.301-304
    • /
    • 2006
  • The insistence of rights and interests in contract is being generalized by opening in construction market which is following F.T.A, internationally. Conditions of contract in construction have different specialities compared with other industries. Different conditions of contract should be established because of a specific character that is different from each construction, such as work, environment, circumference conditions. Although the order of Turn-key is being expanded by increasing construction scale and demanding hybrid function, the suitable regulations of contract are not settled. As a result, various factors of claim is occurring in Change Order-Claim, because they just obey a part of guide-line. This study suggests useful solutions in detail concerned with the main factor of Change Order-Claim by each D/B phases through practical sorting and analysis of the causes of Change Order-Claim.

  • PDF

Main Issues on the Insurer's Duty of Payment of Insurance Claim in English Insurance Law -Focused on the Revised Provisions in Insurance Act 2015 - (영국 보험법 상 보험자의 보험금지급의무와 관련한 주요 쟁점 - 2015년 보험법 상 개정내용을 중심으로 -)

  • SHIN, Gun-Hoon;LEE, Byung-Mun
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.76
    • /
    • pp.125-145
    • /
    • 2017
  • Where an insurer has unreasonably refused to pay a claim or paid it after unreasonably delay, the existing law in England does not provide a remedy for the insured. Accordingly, the insured is not entitled to damages for any loss suffered as a result of the insurer's unreasonable delay. This legal position differs from the law in Scotland and most major common law jurisdictions. LC thought that the legal position in England is anomalous and out of step with general contractual principles. LC considered that a policyholder should have a remedy where an insurer has acted unreasonably in delaying or refusing payment of claim, and, therefore, recommended a statutory implied term in every insurance that the insurer will pay sums due within a reasonable time and breach of that term should give rise to contractual remedies, including damages. More detailed recommendations of LC are as followings. First, it should be an implied term of every insurance contract that, where an insured makes a claim under the contract, the insurer must pay sums due within a reasonable time. Secondly, a reasonable time should always include a reasonable time for investigating and assessing a claim. Although a reasonable time will depend on all the relevant circumstances, for example, the following things may need to be taken into account, that is, (1) the type of insurance, (2) the size and complexity of the claim, (3) compliance with any relevant statutory rules or guidance, and (4) factors outside the insurer's control. Thirdly, if the insurer can show that it had reasonable grounds for disputing the claim(whether as to pay or not, or the amount payable), the insurer does not breach the obligation to pay within a reasonable time merely by failing to pay the claim while the dispute is continuing. In those circumstances, the conduct of the insurer in handling the dispute may be a relevant factor in deciding whether the obligation was breached and, if so, when. Fourthly, Normal contractual remedies for breach of contract should be available for breach of the implied term to pay sums due within a reasonable time. Finally, In non-consumer insurance contracts, the insurer should be permitted to exclude or limit its liability for breach of the obligation to pay sums due within a reasonable time, unless such breach was deliberate or reckless, and such an insurer's right to contract out will be subject to satisfying the transparency requirements.

  • PDF

An Analysis of Single PPM Quality Innovation's Status using Covariance Structure Model (공분산구조모델에 의한 싱글 PPM 품질혁신 운동 추진현황 분석)

  • Koo, Il-Seob;Kim, Tae-Sung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.28 no.4
    • /
    • pp.102-108
    • /
    • 2005
  • Single PPM Quality Innovation Movement is originally developed quality program in Korea for supplier's quality level-up since 1995. The quality target is below the 10ppm(parts per million) in outgoing quality and delivered goods plus field claim. Recently 1,053 companies is received Single PPM Quality Certification from government. This quality program is to realized the anticipated results not only duality level's increasing, but also company's confidence, competitiveness. We were able to obtain participations of 75 questionnaire, and derived statistics by means of SPSS/PC version 10.0. In this study, we find the bottleneck factor for promotion and upgrade S-PPM, and suggest a way out of difficulties.

A study on the credibility estimation model for the indurance experience rate-making (보험 경험요율산정을 위한 신뢰도 추정모형 연구)

  • 강정혁;양원섭
    • Korean Management Science Review
    • /
    • v.11 no.3
    • /
    • pp.153-167
    • /
    • 1994
  • Credibility theory has provided with a useful tool the assignment of weighting factor that reflects the credibility of the observed individual and collective experience to secure fair experience rate-,making. We review credibility models which can effectively estimate risk premiums using credibility theory, and suggest an empirical Bayed model based on the collective statistics to estimate the structural parameters. To illustrate the use of evolutionary models, the models are applied to the actual data, such as loss ratio, claim frequencies and severity, in the Korean automobile insurance. Also the possibilities of generalizations and applications of empirical models are discussed.

  • PDF