• Title/Summary/Keyword: Circuit Breaker failure

Search Result 46, Processing Time 0.035 seconds

A Study on Joule Heating Simulation Method to Prevent Sensitivity Current Trip of Electric Vehicle Charger (전기자동차 충전기의 누전차단기 감도 전류 Trip 방지를 위한 Joule Heating 시뮬레이션 방안연구)

  • Lee, Beoung-Kug;Eo, Ik-soo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.4
    • /
    • pp.150-159
    • /
    • 2021
  • This study aimed to prevent inconvenience to electric vehicle users caused by an interruption of charging by the earth leakage breaker trip that occurs during charging. As a field case study, it was confirmed that during the battery charger failure type, leakage current measurement experiment by vehicle type, and leakage current breaker operation experiment, the internal temperature of the charger rose to more than 60 ℃ in summer, and the earth leakage circuit breaker stopped charging by tripping at 80% of the rated sensitivity current. Through Joule heating modeling, 32A is energized at the reference temperature of 30 ℃ at the initial time t=0 (s). After t=3000 (s), the heat generated around the charging part of the earth leakage breaker increased to 32.4 ℃. The temperature and time factors correlated with the amount of heat generated according to the statistical verification tool with a correlation coefficient of 0.97. Overall, it is possible to prevent the leakage breaker sensitivity current trip due to an increase in temperature inside the charger in summer by performing a Joule heating simulation according to the material of the charging case, the arrangement of the internal wiring, and the dielectric medium when developing the charger device.

The Causes and Analysis of Electrical Fires -focused on Dynamic Characteristics of RCD- (전기화재의 발생원인 및 분석 -누전차단기의 동작특성을 중심으로-)

  • 이상호
    • Fire Science and Engineering
    • /
    • v.17 no.2
    • /
    • pp.1-5
    • /
    • 2003
  • Recently, the occurrences of electrical fire have been suppressed by a residual current protective devices(RCD), a molded case circuit breaker(MCCB) and a fuse in case of an earth leakage, a short circuit and an over current. But it is impossible for the RCD to break the circuit in the case of the conductor fractures, the failure of pressure contacts on connecting points and the momentary short circuit of low voltage wiring. Therefore, it is require to study the constructive problem of the RCD. In this paper, we have tested the operation characteristics of the RCD according to the R load and R-L load in the conductor fractures, the failure of pressure contacts on connecting points and the momentary short circuit of low voltage wiring.

Electric Safety Protection Device of High Speed for Incapable Operation of ELB and MCCB Using the Low Voltage Distribution Line (저압 배전선로의 누전 및 배선용 차단기의 오동작 방지를 위한 고속형 전기안전 보호장치)

  • Kwak, Dong-Kurl;Jung, Do-Young
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.56 no.11
    • /
    • pp.1925-1929
    • /
    • 2007
  • This paper is studied on a novel Electric Safety Protection Device (ESPD) of high speed for incapable operation of Earth Leakage Circuit Breaker (ELB) and Molded_case Circuit Breaker (MCCB) using the low voltage distribution line. The major causes of electrical fire are classified to short circuit fault, overload fault, electric leakage and electric contact failure. The occurrence factor of the fire is electric arc or spark accompanied with electrical faults. Residual Current Protective Device (RCD), that is ELB and MCCB, of high sensitivity type used at low voltage wiring cuts off earth leakage and overload, but the RCD can't cut off electric arc or spark to be a major factor of electrical fire. As the RCDs which are applied low voltage distribution panel are prescribed to rated breaking time about 30[ms] (KS C 4613), the RCDs can't perceive to the periodic electric arc or spark of more short wavelength level. To be improved on such problem, this research development is proposed to a novel ESPD of high speed to trip of distribution line on electric arc or spark due to electrical fire. Some experimental results of the proposed ESPD are confirmed to the validity of the analytical results.

Electromagnetic Transient Program Modeling for Analysis of Switching Over-Voltage on Shunt Reactor (분로리액터 개폐 과전압 해석을 위한 EMTP 모델링)

  • Oh, SeungRyle;Jun, InYoung;Han, KiSun;Kang, JiWon
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.6 no.4
    • /
    • pp.393-397
    • /
    • 2020
  • Shunt reactor, a facility for reactive power compensation, is switched several times a day depending on the load pattern. When the circuitbreaker opens the shunt reactor over-voltage is generated by several factors which degrade the insulating performance of internal parts of the circuit-breaker and cause severe voltage stress on the equipment in the power system. Transient phenomenon occurring during the switching of shunt reactor are available in laboratories that verify the performance of the circuit-breaker by simulating the power system. However, it is difficult to measure the transient phenomenon that occurs during actual operation in actual power system due to many limitations. Therefore, this paper deals with the modeling using EMTP to analyze the reignition and current chopping which causes more severe transient recovery voltage in the small inductive current breaking in actual power systems. In addition, this paper analyzes the main phenomenon that cause circuit-breaker failure in opening shunt reactor using EMTP model.

Incorporating Station Related Aging Failures in Bulk System Reliability Analysis

  • Billinton Roy;Yang Hua
    • KIEE International Transactions on Power Engineering
    • /
    • v.5A no.4
    • /
    • pp.322-330
    • /
    • 2005
  • This paper proposes methods to incorporate station related aging failures in composite system reliability assessment. Aging failures of station components, such as circuit breakers and bus bars, are a major concern in composite power system planning and operation as an increasing number of station components approach the wear-out phase. This paper presents probabilistic models for circuit breakers involving aging failures and relevant evaluation techniques to examine the effects of station related aging outages. The technique developed to incorporate station related aging failures are illustrated by application to a small composite test system. The paper illustrates the effects of circuit breaker aging outages on bulk system reliability evaluation and examines the relative effects of variations in component age. System sensitivity analysis is illustrated by varying selected component parameters. The results show the implications of including component aging failure considerations in the overall analysis of a composite system.

A Study on the Elimination of Temporary overvoltage Due to Ferroresonance at Gas Insulated Switchgear (Gas 색연(絶綠) 개폐장치(開閉裝置)의 철공진(鐵共振) 제어대책(制御對策)에 관한 연구(硏究))

  • Kim, S.K.;Kim, T.S.
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2000.05b
    • /
    • pp.216-221
    • /
    • 2000
  • This paper describes the analysis results on the PT ferroresonance at 154 kV GIS (gas Insulated substation by EMTP(Electro- magnetic Transient Program). We had simulated the PT ferroresonance between a potential transformer(PT) and an open circuit breaker's grading capacitance. The ferroresonance leads to very large power frequency overvoltages on PT bus and subsequent insulation failure. The large power can be supplied to the PT by the high voltage on the opened circuit due to the grading capacitance and equivalent capacitance of the buses during the ferroresonance. The damping circuit connected on the secondary winding were considered in the model. The actual countermeasure include a saturable inductor and a resistor series-mounted, but the 2 ohms of damping resistance was used in the computationl model.

  • PDF

A analysis result on the PT ferroresonance at 154 kV GIS substation (154 kV GIS의 PT 철공진 소손사례와 원인규명)

  • Woo, J.W.;Shim, E.B.;Kim, S.K.
    • Proceedings of the KIEE Conference
    • /
    • 1999.07e
    • /
    • pp.2076-2079
    • /
    • 1999
  • This paper describes the analysis results on the PT ferroresonance at 154 kV GIS (gas Insulated substation by EMTP (Electro-magnetic Transient Program). We had simulated the PT ferroresonance between a potential transformer(PT) and an open circuit breaker's grading capacitance. The ferroresonance leads to very large power frequency overvoltages on PT bus and subsequent insulation failure. The large power can be supplied to the PT by the high voltage on the opened circuit due to the grading capacitance and equivalent capacitance of the buses during the ferroresonance. The damping circuit connected on the secondary winding were considered in the model. The actual countermeasure include a saturable inductor and a resistor series-mounted, but the 2 ohms of damping resistance was used in the computational model.

  • PDF

Development of Arc-horn to be mounted on 154kV Transmission Line Arrester (154kV 송전선로 피뢰기 설치용 아킹혼 개발)

  • Min, Byeong-Wook;Kim, Woo-Kyum;Lee, Buk-Chang;Choi, Han-Yeol;Park, Jae-Ung;Keum, Eui-Yeon
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.335-336
    • /
    • 2008
  • Overhead transmission lines are mainly crossing mountainous area. They are easily affected in weathers like typhoon, strong wind, lightning, heavy rain, or heavy snow. Sometimes these weathers cause transmission line faults. A lightning flashover is most often fault. Nowadays lightning density in KOREA is growing high and lightning flashovers occur more often. A lightning flashover on transmission line is mostly cleared by momentary operation of a circuit breaker, so power failure happens rarely. However, when both circuits trip simultaneously due to the lightning flashovers on double circuit transmission line, short time power failure and voltage drop happen. KEPCO has used transmission line arresters to avoid double circuit simultaneous trip out since 2003. And transmission line arresters cannot be installed with KEPCO's present metal fittings, so various fittings have been used for each transmission line arrester manufacturer. This paper introduces development and standardization of arc-horn and metal fittings for transmission line arrester which can be used for both existing lines and new lines in KEPCO.

  • PDF

Ananalzing fault current and Protective coordination in the underground line (지중배전선로의 고장전류 크기 및 보호협조분석)

  • Cho, Nam-Hun;Ha, Bok-Nam;Lee, Jung-Ho
    • Proceedings of the KIEE Conference
    • /
    • 1998.07c
    • /
    • pp.932-934
    • /
    • 1998
  • Electric power distribution feeders are susceptible to faults caused by a variety of situations such as adverse weather conditions, tree contacts, equipment failure, accidents, etc. Distribution circuit faults result in a number of problems related to the reliability of service and customer power quality. In the past, the permanent interruption of customer service resulting from a blown fuse or a recloser lockout was the only factor which was used to determine service reliability. So we developed KODAS(Korea Distribution Automation System) with successful and had fieid-testing of Distribution Automation System in last three years at Kang-dong Branch Office. In performing the project, KEPRI has gained valuable experience, through dealing with many difficult problem. This paper is depicted about the circuit breaker coordination problems in the Underground for the Distribution Automation Feeder.

  • PDF

Development of electric safety control system for incapable operation of ELB and MCB using the low voltage distribution line (저압 배전선로의 누전 및 배선용 차단기의 오동작 방지를 위한 전기안전 제어장치 개발)

  • Kwak, Dong-Kurl;Shin, Mi-Young;Jung, Do-Young;Kim, Hyo-Jin;Baek, Seong-Hyun;Choi, Byung-Seub
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.371-372
    • /
    • 2007
  • The major causes of electrical fire are classified to short circuit fault, overload fault, electric leakage and electric contact failure. The occurrence factor of the fire is electric arc or spark accompanied with electrical faults. Residual Current Protective Device (RCD), that is Earth Leakage Circuit Breaker(ELB) and Molded_case Circuit Breaker (MCB), of high sensitivity type used at low voltage wiring cuts off earth leakage and overload, but the RCD can't cut off electric arc or spark to be a major factor of electrical fire. As the RCDs which are applied low voltage distribution panel are prescribed to rated breaking time about 30[ms] (KS C 4613), the RCDs can't perceive to the periodic electric arc or spark of more short wavelength level. To be improved on such problem, this research development is proposed to a auxiliary control apparatus for RCD trip on electric arc or spark due to electrical fire. Some experimental results of the proposed apparatus is confirmed to the validity of the analytical results.

  • PDF