Recently, various energy efficiency optimization activities are ongoing globally by integrating conventional grids with ICT (Information and Communication Technology). In this sense, various smart grid projects, which power suppliers and consumers exchange useful informations bilaterally in real time, have been being carried out. The electric vehicle diffusion program is one of the projects and it has been spotlighted because it could resolve green gas problem, fuel economy and tightening environmental regulations. In this paper, the economics of V2G system which consists of electric vehicles and the charging infrastructure is evaluated comparing electric vehicles for V2G with common electric vehicles. Additional benefits of V2G are analyzed in the viewpoint of load leveling, frequency regulation and operation reserve. To find this benefit, electricity sales is modeled mathematically considering depth of discharge, maximum capacity reduction, etc. Benefit and cost analysis methods with the modeling are proposed to decide whether the introduction of V2G systems. Additionally, the methods will contribute to derive the future production and the unit cost of electric vehicle and battery and to get the technical and economic analysis.
본 논문에서는 2개의 컨버터 구조를 갖는 삼상 계통 연계형 UPS에 대하여 연구한다. 삼상UPS시스템은 2개의 능동 전력 보상기 구조로 이루어져 있다. 하나는 직렬형으로 .전원전압과 동상의 전압원으로 동작하여 전원전압의 변동, 왜곡시에도 정현파 전원전류와 고역률을 갖도록 동작한다. 병렬형은 전원전압과 위상을 맞춘 종전의 정현파 전압원으로 동작하여 부하에 안정되고 낮은 THD를 갖는 정현파 전압을 공급한다. 본 논문에서는 직렬형, 병렬형 능동보상기에서 전원전압의 크기에 따라 충전 방법에 대하여 제시한다. 종전의 계통 연계형 UPS는 DC 충전과 출력전압을 동시에 제어하였는데, 2개의 컨버터 구조를 갖는 UPS 시스템에서는 직렬형 보상기도 DC 충전을 할 수 있어 직렬형과 병렬형을 사용한 충전 알고리듬을 연구할 필요가 있다. 따라서 DC link단의 전압을 안정시켜 본래의 직렬형, 병렬형 구조의 보상기의 안정성 향상에 기여할 수가 있다. 제안된 방법의 타당성은 시뮬레이션과 실험 결과를 통하여 입증된다.
상용계통과 연계한 PV 시스템은 인버터의 특성과 더불어 소형, 고 역률, 낮은 고조파 출력, 고 신뢰성, 최대출력 운전, 저비용 등의 장점이 요구된다. 태양광발전시스템의 PV 에너지를 계통과 부하로 전달하기 위해 양방향의 PCS가 요구되어 진다. 본 논문에서는 태양광 발전의 ESS를 고려한 PCS를 제안하여 부하평준화를 통한 전력의 안정적인 공급을 확인하고자 한다. 이를 위해 일사량과 부하량에 따른 5단계의 동작 모드 알고리즘을 제안하고, 충/방전 제어를 위한 제어기를 설계 하였다. 양방향의 효율적인 에너지 전달을 위해 DC-link단에 양방향 컨버터 및 배터리를 연결하고, 연계형 인버터를 통해 DC-link 전압 및 인버터 출력전압을 제어하였다. 제안된 시스템의 타당성을 입증하기 위해 PSIM을 사용한 시뮬레이션을 수행하여 타당성과 안정성을 검토하였으며, 이를 확인하기 위해 3[kW] PCS를 제작하여 실험하였다. 실험결과를 통해 제안된 시스템에 요구되어지는 특성을 검증하였으며 기존 시스템에 비해 강인한 시스템을 구성하였다.
기존 SIDO(Single Inductor Dual Output) boost converter에서는 전력 사용량의 변화에 맞게 부하에 전하를 공급하는 시간을 바꾸게 된다. 이 때 boost converter의 스위칭 주파수가 변해야 할 정도로 어느 한 부하의 전력 사용량이 크게 바뀔 경우, 나머지 부하에 전하를 공급하는 시간도 바뀌게 된다. 이로 인해 크로스 레귤레이션이 일어난다. 따라서 본 논문에서는 어느 한 부하의 전력 사용량의 변화로 스위칭 주파수가 정수 비로 바뀔 때 나머지 부하에 전하를 공급하는 시간도 같은 정수 비로 변화 시킨다. 이 방법을 전하 복사기법(charge copy)이라 하며 이 효과로 인하여 크로스 레귤레이션이 감소한다. 제안하는 방법의 시뮬레이션 결과로 크로스 레귤레이션이 기존의 방법보다 10.42mV/A 만큼 감소하고, 복원 시간은 39.118us 만큼 작아지는 결과를 보였다.
저궤도 인공위성 전력계 시스템의 설계 및 해석을 위한 태양전지 전력조절기의 대신호 안정도해석을 수행한다. 태양전지 전력조절기에서 제어가능한 모든 방법에 따른 태양전지에서 바라본 태양전지 전력조절기의 부하특성을 분류하고, 상태공간해석을 이용하여 태양전지 시스템의 대신호적 안정도를 해석한다. 또한, 본 논문에서는 태양전지 전력조절기의 부하특성을 정전력부하에서 정저항부하로 변환하여 대신호적인 안정도를 확보하는 비선형변환을 제안한다. 제안된 변환기법을 통해 최대전력점 추적제어나 배터리 충전제어 및 전류분배제어가 가능한 병렬 모듈 태양전지 레귤레이터에 적합한 단일 전류 제어기를 구성한다. 제안된 대신호 해석과 저항제어를 검증하기위해, 200W급 태양전지와 100W급 태양전지 전력조절기 두 모듈을 병렬로 구성하여 실험하였다.
피드백 전압 감지 구조는 기존 외부 출력 캐패시터의 제거로 인한 오버슈트 및 언더슈트 현상을 완화하기 위해 제안된다. 기존의 LDO 레귤레이터는 전원 공급 전압의 불균형으로 인해 발생하는 오버슈트 및 언더슈트를 겪는다. 따라서 제안된 LDO는 기존 LDO의 피드백 경로만 유지하면서 새로운 제어 경로를 형성하기 위해 보다 개선된 과도 응답을 갖도록 설계되었다. 새로운 제어 경로는 출력 단계에서 발생하는 오버슈트 및 언더슈트 현상을 감지한다. 이에, 패스 소자의 게이트 노드의 전류를 충방전함으로써 패스 소자의 동작 속도가 향상된다. 피드백 전압 감지 구조가 있는 LDO 레귤레이터는 3.3~4.5V의 입력 전압 범위에서 작동하며 3V의 출력 전압에서 최대 200mA의 부하 전류를 가집니다. 시뮬레이션 결과에 따르면 부하전류가 200mA일 때 언더슈트 조건에서는 73mV, 오버슈트 조건에서는 61mV이다.
This study is conducted to improve efficiency of thermal storage tank. The thermal storage tank was designed to store heat energy that obtained from solar or the others heat sources. However, it has difficulties in storing heat with uniform temperature through the entire tank with respect to vertical direction. This kind of maldistribution of the supplied heat to the storage tank effects on the system performance. In this study is focused on utilization of the thermal stratification to improve thermal comfort for people in the house. To enhance temperature stratification of the tank, a distributor was designed and Installed in the middle of the tank. The distributor is supplies hottest water to the top side of the tank which is very close to inlet of the supply line to the heating load. The hottest water that is accumulated on top side of the tank is firstly supplied to the load with higher temperature. Reminder water takes a little time to warming up until desired supply temperature reached. This kind alternating selection of the supply temperature is improve thermal comfort with moderated system performance.
Karimi, Mohammad Hadi;Zamani, Hassan;Kanzi, Khalil;Farahani, Qasem Vasheghani
Journal of Power Electronics
/
제13권5호
/
pp.877-883
/
2013
This paper discussed a transformer-less shunt static synchronous compensator (STATCOM) with consideration of the following aspects: fast compensation of the reactive power, harmonic cancelation and reducing the unbalancing of the 3-phase source side currents. The STATCOM control algorithm is based on the theory of instantaneous reactive power (P-Q theory). A self charging technique is proposed to regulate the dc capacitor voltage at a desired level with the use of a PI controller. In order to regulate the DC link voltage, an off-line Genetic Algorithm (GA) is used to tune the coefficients of the PI controller. This algorithm arranged these coefficients while considering the importance of three factors in the DC link voltage response: overshoot, settling time and rising time. For this investigation, the entire system including the STATCOM, network, harmonics and unbalancing load are simulated in MATLAB/SIMULINK. After that, a 35KVA STATCOM laboratory setup test including two parallel converter modules is designed and the control algorithm is executed on a TMS320F2812 controller platform.
Transcranial magnetic stimulation requires an electric field composed of dozens of V/m to achieve stimulation. The stimulation system is composed of a stimulation coil to form the electric field by charging and discharging a capacitor in order to save energy, thus requiring high-pressure kV. In particular, it is charged and discharged in capacitor to discharge through stimulation coil within a short period of time (hundreds of seconds) to generate current of numerous kA. A pulse-type magnetic field is formed, and eddy currents within the human body are triggered to achieve stimulation. Numerous pulse forms must be generated to initiate eddy currents for stimulating nerves. This study achieved high internal pressure, a high number of repetitions, and rapid switching of elements, and it implemented numerous control techniques via introduction of the half-bridge parallel load method. In addition it applied a quick, accurate, high-efficiency charge/discharge method for transcranial magnetic stimulation to substitute an inexpensive, readily available, commercial frequency condenser for a previously used, expensive, high-frequency condenser. Furthermore, the pulse repetition rate was altered to control energy density, and grafts compact, one-chip processor with simulation to stably control circuit motion and conduct research on motion and output characteristics.
This paper presents the analysis of connected operation of photo voltaic source and Li energy storage system. The micro-grid has been installed and operated for several years at the campus of USF and has been a role of test bed. Photo voltaic source has been strongly influenced by the location, weather and climate of a installed area and Li battery is connected directly to the photo voltaic source to compensate for the limitations. The Li battery is operated to supply power output to the grid by the charging or discharging mode based on the average power output of the PV source which is calculated from monitored data for several years. The load of the PV and Li battery system is operated as a severe loading condition and the operating characteristics of PV source and Li battery are analyzed in detail. In connected operations of PV and Li battery to power system, the PV and Li battery is operated to supply constant power during only day time or peak time to increase load shedding ratio and efficient usage of generation sources in power system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.