• Title/Summary/Keyword: Characteristics of track settlement

Search Result 37, Processing Time 0.029 seconds

Application of Geotextile to ensure the Motor Pouring Ability for Paved Track (포장궤도 모르터 충진성능 확보를 위한 토목섬유의 적용)

  • Lee Ho-Ryong;Park Jong-Kyan;Hwang Seon-Keun;Lee Il-Wha
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.836-841
    • /
    • 2005
  • As gravel roadbed is gradually turn down by repetitive loading of train, lasting work for maintenance and management of track is necessary to reduce the settlement of roadbed and the deterioration of track. Despite of above weak point, gravel roadbed has become a basic structure of roadbed at the present time. But request for new structure of roadbed is recently presented to settle an increased transportation capacity of track, and to solve a shortage of the labor to handle maintenance work of track. Therefore, we begin to research about maintenance-free roadbed like paved track from two years ago. In this study, a series of tests were performed to clarify the characteristics of strength and permeability of concrete specimen, which is the upper part of paved track injected by cement mortar, by type of geotextile and finally to give a basic data for application of geotextile to the lower part of paved track.

  • PDF

An analysis study on earth pressure trends during construction of Gyungbu High Speed Railway using Concrete Track (콘크리트궤도 적용 경부고속철도의 시공 중 토압 경향 분석 연구)

  • Kim, Ki-Hwan;Kim, Dae-Sang;Na, Sung-Hoon;Shin, Ki-Dae
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.671-679
    • /
    • 2010
  • The construction of concrete track for the first time in Korea gives lots of meanings to civil engineering in various aspects. Settlement level needs to be kept minimal for the safety of the track. Concrete track has different structural characteristics comparing to conventional ballast track, so load distribution in concrete track is also different. Since it is the first time to build concrete track, there are very few experience and data available on the subject. Therefore it is important to evaluate how much load is transferred to the ground due to the running vehicle in concrete track and to determine the optimal thickness of layers. In this research, 9 individual earth pressure cells were installed at OOOk930 site in 2nd stage of Kyungbu high speed railway during under construction. The in-situ pressure data were measured at each layers during pump-car and locomotive were moving on the high speed railway surface.

  • PDF

Characteristics of Track and Train Behaviors on High-Speed Railway Bridge/Earthwork Transiton Zone (고속철도 교량/토공 접속부에서의 궤도 및 차량 거동 특성)

  • Lee, Il-Wha;Kang, Yun-Suk;Kim, Eun;Son, Ki-Jun;Park, Chan-Kyoung
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.129-134
    • /
    • 2003
  • It is very important to pay careful attention to construction of bridge/earthwork transition zone for high-speed railway. The transition zone of the railway is the section which roadbed stiffness is suddenly varied. Differences in stiffness have dynamic effects and these increase the forces in the track and the extent of deformation. An abrupt change of stiffness across two adjacent track portions cause irregular settlement of roadbed, track irregularity, lack of girder bending moment and reduction of lateral resistance. Especially on high-speed railway, track irregularity of transition zone cause sincere effect to track stability and train safety. And so continuous maintenance is needed. To verify this effect and to improve transiton zone capacity, In situ test, track irregularity and train acceleration test were performed on high-speed railway bridge/earthwork Transiton Zone.

  • PDF

Characteristics of Behavior of the Soft Roadbed through Long-Term Instrumentation on the Field Test (운행선상의 연약노반 시험부설구간에서의 장기계측을 통한 거동 특성)

  • Lee Jin-Wook;Choi Chan-Yong;Lee Sung-Hyok;Lee Cnang-Youl
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1058-1064
    • /
    • 2004
  • As one of reinforcing methods for soft roadbed, the problems that mud-pumping and settlement occurred by soft roadbed, were investigated, evaluated and analyzed through installing relatively economical and efficient geosynthetics on the selected track-bed for testing. Mock-heang to Dong-ryang on the filed resting sections in the Chung-buk lines were selected as investigating the state of track and prepared field after selecting three of 1,700 spots which often make mud-pumping and requiting maintenance for that. Long curved line radiuses(R) of Mock-heang to Dong-ryang are 500m that were installed with 4 types of geosynthetics layers and one ballast layer. Installed testing cross-section is 200m totally with 40 m between places. Strength or prepared roadbed was measured to investigate the state of roadbed and track with constructing(installing) field testing sections and physical properties of roadbed soils were evaluated and analyzed. Also, mud-pumping, settlement of elastic or plastic sleeper, failure or track, wheel-loads, transverse and earth pressures were measured after installing field testing sections.

  • PDF

Response Analysis of Ground Vibration for Cutting and Embankment Transition Zone Structure (절성토 접속구조별 지반진동 응답특성)

  • Lee, Il-Wha;Yun, Won-Min;Choi, Won-Il;Hwang, In-Hwan;Hwang, Sung-Wook
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.3195-3200
    • /
    • 2011
  • The vibration resulting from railway operation is transmitted through the track and line structure, ground movements to adjacent buildings. As these vibration is growing, there is occurred exaggerated forces and displacements of the track and line structure and it is causing the differential settlement. It is difficult to clarify the dynamic response characteristics of trackbed because of various environmental conditions. However, track irregularity be affected by ununiformed bearing capacity and its dynamic response, study for dynamic response characteristics is required to investigate the cause of track irregularity and countermeasure. This study was intended to evaluate the numerical analysis which exam the response analysis characteristic of ground vibration by shape of cutting and embankment transition zone. The original method of analysis were have to examine variables such as directions, angles, drain conditions, linear conditions. However, In the analysis there were to consider the effect of moving loads according to directions of cutting and embankment transition zone.

  • PDF

Settlement characteristics of rock/soil mixture subgrade of slab track with variation of degree of saturation (포화도 변화에 따른 슬래브궤도 혼합성토 노반의 침하 특성)

  • Park, Seong-Yong;Kim, Dae-Sang
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1506-1512
    • /
    • 2010
  • In this study, model tests were performed to investigate the settlement characteristics of the rock/soil mixture subgrade with the many portion of mudstone due to the cyclic train loading in high-speed railway. Specially, from the tests varying initial degree of saturation, effects of increment of the degree of saturation in the subgrade due to rainfall or elevation of ground water table under cyclic train loading on the deformation characteristics were analyzed. From the results, in the low degree of saturation, settlement converged to some value. However, in the condition of degree of saturation larger than some value, settlement rapidly increased. Therefore, it was found that it is important to maintain the degree of saturation of subgrade below the specific level to prevent the settlement of subgrade.

  • PDF

New Gain Function Based on Attenuation Characteristics of Ballast Track for GPR Analysis (GPR 분석을 위한 자갈궤도 자갈의 감쇄특성을 이용한 이득함수 개발)

  • Shin, Jihoon;Choi, Yeongtae;Jang, SeungYup
    • Journal of the Korean GEO-environmental Society
    • /
    • v.18 no.4
    • /
    • pp.13-21
    • /
    • 2017
  • Ballasted track has been used as track system for more than 100 years. Ballasted track has advantages of low construction cost, flexible maintenance, low noise and vibration, and so on. However, ballasted track leads to continuous settlement which causes maintenance. Recently, increase in speed, traffic volume, and weight of train requires more frequent maintenance. Fouling, well-known phenomenon of accumulation of fine materials due to intrusion of subgrade and breakage of ballast materials, expedites the settlement (i.e., irregular settlement) of track. Ground Penetrating Radar (GPR) can be one of non-destructive tools that can evaluate fouling level of ballast. In this paper, a gain function based on the attenuation characteristics of ballast material is suggested in conjunction with Hilbert transform. Lab box tests and full-scale tests indicate that the suggested method reasonably classifies clean, fouled layers, and subgrade. However, additional study to eliminate effect of sleeper and to include the scattering features of the electromagnetic wave in ballast voids should be required in order to enhance the accuracy.

A Study on Behavioral Characteristics of Track Roadbed according to Steel Pipe Press-in Excavation during Construction of Underground Railway Crossing

  • Kim, Young-Ha;Eum, Ki-Young;Kim, Jae-Wang
    • International Journal of Railway
    • /
    • v.6 no.2
    • /
    • pp.69-77
    • /
    • 2013
  • In this study, numerical analysis and model experiments were conducted to analyze behavioral characteristics acting on the track roadbed with excavation through steel pipe injection, a non-exclusive method of crossing construction under railroad as primary target. In model experiments that simulate injection excavation behaviors with an increase in the depth of soil cover, the upper displacement was measured by construction of the first and the second pipes in order to predict actual behaviors, and the behavior characteristics were verified through numerical analysis. The investigation results showed that surface displacement was smaller under the condition of higher soil cover. In the case of injecting two pipes, when the first pipe was injected, deformation of the surface increased linearly in both settlement and uplift experiments. However, when the second pipe was injected, the amount of change was found to be very small due to the relaxation and plastic zones around the first pipe. In addition, the results of numerical analysis on the same cross section with the model experiment found that the results of investigation into settlement ratio and volume loss were in very good agreement with those obtained by the model experiment.

Long-term Settlement of High Speed Railway Embankment Compacted under Dry/Wet Condition (고속철도 토공구간 쌓기 재료의 다짐함수비 조건에 따른 장기침하 특성)

  • Lee, Sung-Jin;Lee, Il-Wha;Lee, Jin-Uk
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.1268-1277
    • /
    • 2008
  • Recently, the high speed railway comes into the spotlight as the important and convenient traffic infrastructure. In Korea, Kyung-Bu high speed train service began in about 400km section at 2004, and the Ho-Nam high speed railway will be constructed by 2017. The high speed train will run with a design maximum speed of 300-350km/hr. Since the trains are operated at high speed, the differential settlement of subgrade under the rail is able to cause a fatal disaster. Therefore, the differential settlement of the embankment must be controlled with the greatest care. Furthermore, the characteristics and causes of settlements which occurred under construction and post-construction should be investigated. A considerable number of studies have been conducted on the settlement of the natural ground over the past several decades. But little attention has been given to the compression settlement of the embankment. The long-term settlement of compacted fills embankments is greatly influenced by the post-construction wetting. This is called 'hydro collapse' or 'wetting collapse'. This wetting collapse problem for the compressibility of compacted sands, gravels and rockfills, has been recognized by several researchers. For this wetting settlement problem, we showed the test results carried out with 4 fill materials. These tests were performed under the condition that the fill materials were inundated at the first wetting. Subsequently, in this study, we investigated the long-term settlement characteristics of the fill materials under the repeated partial wetting and rising of the ground water table happend by rainfall.

  • PDF

Analytical evaluation of the influence of vertical bridge deformation on HSR longitudinal continuous track geometry

  • Lai, Zhipeng;Jiang, Lizhong;Liu, Xiang;Zhang, Yuntai;Zhou, Tuo
    • Steel and Composite Structures
    • /
    • v.44 no.4
    • /
    • pp.473-488
    • /
    • 2022
  • A high-speed railway (HSR) bridge may undergo long-term deformation due to the degradation of material stiffness, or foundation settlement during its service cycle. In this study, an analytical model is set up to evaluate the influence of this long-term vertical bridge deformation on the track geometry. By analyzing the structural characteristics of the HSR track-bridge system, the energy variational principle is applied to build the energy functionals for major components of the track-bridge system. By further taking into account the interlayer's force balancing requirements, the mapping relationship between the deformation of the track and the one of the bridge is established. In order to consider the different behaviors of the interlayers in compression and tension, an iterative method is introduced to update the mapping relationship. As for the validation of the proposed mapping model, a finite element model is created to compare the numerical results with the analytical results, which show a good agreement. Thereafter, the effects of the interlayer's different properties of tension and compression on the mapping deformations are further evaluated and discussed.