• Title/Summary/Keyword: Channel Tunnel

Search Result 141, Processing Time 0.027 seconds

Stochastic Channel Modeling for Railway Tunnel Scenarios at 25 GHz

  • He, Danping;Ai, Bo;Guan, Ke;Zhong, Zhangdui;Hui, Bing;Kim, Junhyeong;Chung, Heesang;Kim, Ilgyu
    • ETRI Journal
    • /
    • v.40 no.1
    • /
    • pp.39-50
    • /
    • 2018
  • More people prefer using rail traffic for travel or for commuting owing to its convenience and flexibility. The railway scenario has become an important communication scenario in the fifth generation era. The communication system should be designed to support high-data-rate demands with seamless connectivity at a high mobility. In this paper, the channel characteristics are studied and modeled for the railway tunnel scenario with straight and curved route shapes. On the basis of measurements using the "Mobile Hotspot Network" system, a three-dimensional ray tracer (RT) is calibrated and validated for the target scenarios. More channel characteristics are explored via RT simulations at 25.25 GHz with a 500-MHz bandwidth. The key channel parameters are extracted, provided, and incorporated into a 3rd-Generation-Partnership-Project-like stochastic channel generator. The necessary channel information can be practically realized, which can support the link-level and system-level design of the communication system in similar scenarios.

Aerodynamic Characteristics of a Variable-Span Wing Flying Inside a Channel II (Effect of Asymmetric Wing Extensions) (채널 내를 비행하는 가변스팬 날개 공력특성 II (비대칭 날개 펼침))

  • Han, Cheolheui
    • Journal of Aerospace System Engineering
    • /
    • v.10 no.3
    • /
    • pp.39-43
    • /
    • 2016
  • In this paper, a wind-tunnel test is accomplished to investigate the roll characteristics of a variable-span wing flying inside a channel. The factors that affect the roll characteristics of the wing were identified by analyzing the measured data; accordingly, when the wing is flying without both the ground and sidewall effects, the asymmetric wing extension causes the roll moment. Both the ground and the sidewall can increase the roll moment, but when the wing is affected by both the ground and the sidewall, the roll moment does not increase as much as the case where the wing is only affected by the ground. Also, the aerodynamic characteristics of the flying wing inside a channel are the nonlinear function of the wing height and the gap between the wingtip and the sidewall, both of which should be considered in a study of the stability and the flight control of the wing-in-ground effect of the vehicle flying inside a channel.

Channel Doping Effect at Source-Overlapped Gate Tunnel Field-Effect Transistor (소스 영역으로 오버랩된 TFET의 Channel 도핑 변화 특성)

  • Lee, Ju-Chan;Ahn, Tae-Jun;Yu, Yun Seop
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2017.05a
    • /
    • pp.527-528
    • /
    • 2017
  • Current-voltage characteristics of source-overlapped gate tunnel field-effect transistor (SOG-TFET) with different channel doping concentration are proposed. Due to the gaussian doping in which the channel region near the source is highly doped and that far from the source is lightly doped, the ambipolar current was reduced, compared with the uniformly-doped SOG-TFET. On-current is almost similar in P-P-N and P-I-N structure but subthreshold swing (SS) of P-P-N TFET enhanced 5 times higher than those of P-I-N TFET. off-current and ambiploar current of the proposed SOG-TFET decrease 10 times and 100 times than those of the uniformly-doped SOG-TFET.

  • PDF

Experimental Study on the Aerodynamic Characteristics of a High-speed Ground Vehicle Moving in a Channel (채널 내를 운행하는 초고속 지상 운행체의 공력특성에 관한 실험적 연구)

  • Choi, Dong-Soo;Kim, Dong-Hwa;Cho, Jin-Soo
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.32 no.8
    • /
    • pp.72-81
    • /
    • 2004
  • A Wind tunnel test for a high speed ground vehicle was conducted to investigate the aerodynamic interactions between the vehicle and a solid channel. The free stream velocity was 30m/see and Reynolds number per unit length was $3.1{\times}10^5/m$. Experimental devices such as a variable channel ground and guide way were used for the test. As the vehicle was close to the channel ground and guide way, lift was significantly increased, drag was slightly decreased and pitching moments were restricted to augment static stability. Using smoke-wire, flow visualization was made to confirm these results by comparing the channel and non-channel flow characteristics of the vehicle. Under the influence of the channel ground and guide way, the flow beneath the vehicle was not discharged outside wing end plates, which was the major reason of the increase in lift of the vehicle.

Numerical study on the effect of three-dimensional unsteady tunnel entry flow characteristics on the aerodynamic performance of high-speed train (터널진입시 비정상 유동특성이 고속전철의 공력성능에 미치는 영향에 관한 수치해석적 연구)

  • 정수진;김태훈;성기안
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.26 no.5
    • /
    • pp.596-606
    • /
    • 2002
  • The three-dimensional unsteady compressible Euler equation solver with ALE, CFD code, PAM-FLOW based on FEM method has been applied to analyze the flow field around the high speed train which is entering into a channel. From the present study, the pressure and flow transients were calculated and analyzed. The generation of compression wave was observed ahead of train and the high pressure in the gap between the train and the tunnel was also found due to the blockage effects. It was found that abrupt fluctuation in pressure exists in the region from train nose to shoulder of train corresponding to 10% of total length of train during tunnel entry. Computed time history of aerodynamic forces of train during tunnel entry show that drag coefficient rapidly rises and saturates at about non-dimensional time 0.31. The total increase of drag coefficient before and after tunnel entry is about 1.1%. Transient profile of lift force shows similar pattern to drag coefficient except abrupt drop after saturation and lift force in the tunnel increases 0.08% more than that before tunnel entry.

Path Loss and Delay Characteristics According to Various Antennas at 2.45GHz in Subway Tunnel Environment (지하철 터널 환경에서 다양한 안테나에 따른 2.45GHz 대역의 경로손실 및 지연 특성)

  • Kong Min-Han;Park Noh-Joon;Kang Young-Jin;Song Moon-Kyou
    • Journal of the Institute of Electronics Engineers of Korea TC
    • /
    • v.43 no.5 s.347
    • /
    • pp.162-168
    • /
    • 2006
  • Understanding of propagation characteristics is very important for the wireless communication system design and wireless communication service construction. In this paper, propagation characteristics is measured and analyzed at 2.45Ghz frequency band under curved subway tunnel environment. We constituted channel measurement system with sliding correlation and five different kind of antennas. The purpose of five different type of antennas is to compare propagation characteristics according to beam shape of antennas. The path loss under tunnel environment is average $4.38^{\sim}14.41dB$ lower than free space and circular polarization antenna marked smallest path loss. Also, path loss is smallest when the receiver antenna located outside of tunnel in th curved section. 90% of delay components of all antennas measured within 20ns and directional antenna has more wide coherence bandwidth than omni-directional antenna. According to measured result, when we consider path loss and delay characteristics, circular polarization antenna is most suitable under tunnel environment.

Establishment of Maintenance and Monitoring Standards for Shield and TBM Tunnels (Shield 및 TBM 터널의 유지관리계측 관리기준 설정에 관한 연구)

  • Jong-Tae Woo
    • Journal of the Society of Disaster Information
    • /
    • v.20 no.1
    • /
    • pp.1-12
    • /
    • 2024
  • Purpose: The objective of this study was to improve the tunnel maintenance and monitoring technology by establishing the maintenance, management, and monitoring standards for shield and TBM tunnels, which had been applied more in recent years. Method: This study comprehensively analyzed and compared the data and model simulations of Seoul Subway Lines 7 and 9 and Bundang Line, shield and TBM tunnels in South Korea, tunnels in France and Japan, and Channel Tunnel in the UK. Result: This study set maintenance and monitoring standards when there was no design estimate based on numerical analyses such as section design and section analysis regarding the maintenance and monitoring section of shield and TBM tunnels. Conclusion: It is necessary to determine safety by comprehensively considering not only each monitoring item but also the changing trend and correlation of all items and compensation of the tunnel.

A Study on the Loss and Damage Ratio of Railroad Tunnel Maintenance Monitoring Sensor (철도터널 유지관리 계측센서의 손망실율 연구)

  • Woo, Jong-Tae
    • Journal of the Society of Disaster Information
    • /
    • v.14 no.3
    • /
    • pp.262-270
    • /
    • 2018
  • Purpose: This paper investigates and analyzes the loss and damage ratio of maintenance monitoring sensor in metropolitan and high speed railroad tunnel in Korea and abroad. Method: After 5~6 years from the installation, the maintenance monitoring sensor on metropolitan transit tunnels showed the loss and damage ratio from 14.2% to 14.8% in Seoul metro line no. 5, 6, 7, 9, and 13.9% in UK channel tunnel. Based on the result, 15% is thought to be a proper set for the elapsed years, which is 5 years from the installation. Results: The maintenance monitoring sensor on high speed railroad tunnels showed the loss and damage ratio of 60.9% in Ho-Nam high speed railroad on 1 stage after 3 ~ 5 years from the installation, which was approximately 4 times as high as that of Seoul metro line no. 5, 6, 7, 9. Conclusion: Kyung-Bu high speed railroad on 2 stage, after 8~10 years from the installation, showed the loss and damage ratio of 66.8%. Based on the result, it can be inferred that the loss and damage ratio increases drastically after 5~10 years from the installation. Therefore, it is necessary to study on the loss and damage ratio of long term elapsed years, especially more than 10 years from the installation.

Performance Characteristic of satellite Wibro system in the high-speed Railroad Channel Environment

  • Song, Seung-Won;Cho, Hyun-Myung;Lee, Byung-Seub;Shin, Min-Su;Ryu, Joon-Gyu;Chang, Dae-Ig
    • Journal of Satellite, Information and Communications
    • /
    • v.2 no.2
    • /
    • pp.1-9
    • /
    • 2007
  • In this paper, we describe the performance degradation of satellite Wibro system and compensation method in the high-speed railroad channel environment. High-speed railroad channel environment is divided into LOS channel and tunnel. In the LOS channel, signal blocking caused by railroad power feeder structures can be a critical problem which is can be solved with antenna diversity. On the other hand, multi path interference phenomenon, representable by propagation model of Optic Fiber, occurred in the tunnel may be another obstacle. These satellite Wibro system performance degradations in railroad channel environment are addressed and adequate compensation methods are proposed and verified through computer simulation. In addition, the ICI caused by Doppler shift in OFDM system is analyzed with its compensation method.

  • PDF

Analysis of Ground Deformation Deformation using Resistivity Monitoring Technique at a Tunnel Excavation Area (전기비저항 모니터링을 이용한 터널 주변 지반상태 변화 파악)

  • Ahn, Hee-Yoon;Jeong, Jae-Hyeung;Cho, In-Ky;Park, Sam-Gyu;Kim, Ki-Seog;Jung, Lae-Chul
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.93-100
    • /
    • 2007
  • During tunnel excavation, drawdown of groundwater table or discharge from tunnel faces may not only reduce stability of tunnel and work efficiency but cause environmental problems. We have investigated the applicability of electrical resistivity survey for the establishment of the monitoring system for groundwater behavior and detecting flow channel of groundwater during tunnel excavation. The groundwater level was continuously measured at several points for 1 year. Survey was conduted at every 3 months using preinstalled electrical resistivity cables on site. The results show that observed changes in resistivity ratios in the area can be explained with observed changes in groundwater level. Thus, we believed that electrical resistivity analysed together with groundwater data can be applied for the monitoring of groundwater in tunnel area.

  • PDF