• Title/Summary/Keyword: Change Order Factors

Search Result 1,220, Processing Time 0.03 seconds

Deduction and Management of Change Order Management Factors through Dispute Case Analysis - Focusing on Korean Commercial Arbitration Board Arbitration Case - (설계변경 분쟁 사례분석을 통한 설계변경 관리요인 도출 및 관리방안 - 대한상사중재원 중재 사례 분석 중심 -)

  • Yeon, Heejung;Hyun, Chang-Taek;Lee, Sanghoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.365-366
    • /
    • 2023
  • The purpose of this study is to prevent dispute due to change orders in construction projects and to handle change orders smoothly. For this purpose, this study analyzed arbitration cases caused by change order handled by the Korea Commercial Arbitration Board. Based on this, dispute factors were analyzed and change order management factors and management plans were presented. Change order management factors were derived from responsibility, contract, design, process, construction cost, and schedule management, and a detailed management plan according to the relevant factor was presented.

  • PDF

Design and implementation of quotation management process according to quotation change factors in make-to-order manufacturing environments (수주생산환경에서 견적변경 요인에 따른 견적관리 프로세스의 설계 및 구현)

  • Jeon, Gyu-Hwan;Jang, Gil-Sang;Park, Chang-Kwon
    • The Journal of the Convergence on Culture Technology
    • /
    • v.7 no.4
    • /
    • pp.879-892
    • /
    • 2021
  • In a make-to-order manufacturing environment, the manufacturer's quotation information is important information used as basic information for bidding, receiving orders, and producing products in response to various customer demands. This quotation information is changed according to various factors such as customer demands, changes in product production environment, changes in drawing information of technical partners, and technological improvement of products. Due to this change, various changes occur in the quotation information that the manufacturer is preparing to reflect the customer's requirements. The change of quotation information according to these various change factors puts a lot of burden on the quotation management work from the standpoint of a make-to-order manufacturing company. In particular, the change of quotation information due to the change factors of quotation is inevitable and frequently occurs due to the requirements of the customer in the customer-oriented make-to-order production environment. In this paper, we propose a quotation change process based on the quotation creation process and propose a consistent and efficient quotation change processing method. To this end, the factors causing the change of quotation were defined, and the types of changes for each factor were defined. And it shows the procedure of applying the quotation change process to the quotation management system through the cases of each cause of the quotation change. In addition, in order to show the usefulness of the quotation change factors, the type of quotation change, the quotation change process, and the quotation system management, the proposed quotation change process and function was applied in the integrated quotation management system for the ship engine division of a typical make-to-order manufacturing company 'H'. As a result, it was confirmed that the proposed quotation change process and management system according to the quotation change factors were efficiently performed.

Establishment of Change Order Database for Reducing Change Order in Construction Phase

  • Shin, Hyun-Kyung;Cha, Yongwon;Han, Sangwon;Hyun, Chang-Taek
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.622-624
    • /
    • 2015
  • As uncertain factors are latent in a construction project by nature, a change order occurs frequently. The occurrence of change orders in construction projects conducted during construction phase is known to cause unexpected negative impacts such as cost overrun, schedule delay, quality problem, and claims in the post-process. Thus, an efficient management method is necessary to prevent and minimize change orders during construction phase when they occur frequently. This paper analyzed the causes of change orders and the impact factors that occur during the construction phase of a construction project and suggested a direction for change order database building.

  • PDF

The Comparative Analysis of Life Change Unit Models for Accident Prevention (재해방지를 위한 생활변화단위 모형의 비교 분석)

  • Kang Young-Sig;Yang Sung-Hwan
    • Journal of the Korea Safety Management & Science
    • /
    • v.8 no.1
    • /
    • pp.85-96
    • /
    • 2006
  • The oriental life change unit(LCU) models differ from the western LCU model in human behavior, life style, ideas, culture, and psychology factors. Especially, the cause and effect models by behavior scientific approach method have provided the accident proneness concept through the LCU factors. Therefore this paper describes the analytical results of the oriental LCU model and western LCU model. Especially, the death of parents and death of close friend in Korean LCU model feel more acute stress than the western factors. In the case of Korean LCU models between the unmarried and married workers living in the middle area of Korea, death of parents, change in family member's health, change to different line of work, and change in work hours and condition are significant at the significance level of 5%. The priority of life change factors in these models is approved in the order of death of parents, death of spouse, death of close family member, and death of close friend. Finally, the result of this paper can be easily used in order to minimize the industrial accidents by the job stress with the worker and safety manager in real fields.

Preliminary Study on the Factors Analysis of Change Order-Claim in Design-Build Project (설계시공일괄입찰공사의 설계변경 클레임요인 분석에 관한 기초 연구)

  • Ryu, Hyeok-Jun;Park, Byung-Ju;Yoo, Seung-Kyu;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.129-130
    • /
    • 2012
  • Although the order of Design-Build is being expanded by increasing construction scale and demanding hybrid function, the suitable regulation of the contracts is not settled. Design-Build is way by government because there are big construction of much government leading in contract relation high position occupy. So, case that prebendary's claim institution develops by litigation is very rare. But, recently Design-Build is magnified. So, these dispute factors is becoming visualization gradually. The contract system is needed to be consistent by international standard to deal with the problem. This study suggests the useful solutions in detail concerned with the main factor of change order claim by each Design-Build phases through practical sorting and analysis of the causes of Change Order-Claim.

  • PDF

A Study on Change Orders in Overseas Construction using Feature Selection - Focus on Plant Construction in the Middle East - (Feature Selection을 활용한 해외 건설의 공사변경 관리에 관한 연구 - 중동 플랜트 건설프로젝트를 중심으로 -)

  • Hong, Sunyoung;Yeom, Chunho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.63-71
    • /
    • 2021
  • This paper looks into how to enhance construction project management, focusing on the change order, which is often considered one of the major causes for construction delays, disputes, and claims in the middle east construction. First, this paper categorizes the major causes of change orders. It suggests a detailed classification standard for affecting factors resulting from change orders based on a case study result of an on-going construction project in the Middle East. In particular, this paper presents a method to apply a machine learning-based feature selection to quantify the importance of change order triggers and affecting factors. As a result, the case study identifies six major change order triggers and eight affecting factors. Also, a meaningful relationship between change order triggers and affecting factors by each category is presented. This paper will contribute to setting a clear guideline for change order management for the international plant construction field while helping prevent construction delays and cost run-ups by reducing the time required for change order resolution between project owners and contractors.

Influence of Climate Change on the Lifecycle of Construction Projects at Gaza Strip

  • El-Sawalhi, Nabil;Mahdi, Mahdi
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.2
    • /
    • pp.1-10
    • /
    • 2015
  • There is a high confidence based on scientific evidence that climate is changing over time. Now climate change is considered as one of the challenges facing the construction industry. As no project is risk free and climate change has a strong impact on the different phases of the construction project lifecycle. This research aimed at providing a platform of knowledge for the construction management practitioners about the impacts of climate change on the construction projects lifecycle, identify the most dangerous climate change factors on the construction project lifecycle, and identify the most affected phase by climate change factors through the construction projects lifecycle. The study depended on the opinions of civil engineers who have worked in the construction projects field among the reality of Gaza Strip. Questionnaire tool was adopted as the main research methodology in order to achieve the desired objectives. The questionnaire included 127 factors in order to obtain responses from 88 construction practitioners out of 98 representing 89.79% response rate about the influence of climate change on the generic lifecycle of construction projects. The results deduced that the most significant influence on the construction project lifecycle was related to the extreme weather events, rainfall change, and temperature change respectively. There was a general agreement between the respondents that the most affected phase by temperature, rainfall, and extreme weather events is the execution phase. The results also asserted with a high responses scale on the need to alternative procedures and clear strategies in order to face the climate change within construction industry.

The Development of the Korean Life Change Unit Model for Accident Prevention -Focused on the Unmarried Workers Living in the Middle Area- (재해방지를 위한 한국형 생활변화단위 모형의 개발 -중부지역 거주 미혼 근로자를 중심으로-)

  • 강영식
    • Journal of the Korean Society of Safety
    • /
    • v.18 no.3
    • /
    • pp.126-130
    • /
    • 2003
  • The term stress is currently used to cover a wide variety of phenomena, ranging from physical to social and cultural factors. The term has defined psychological stress as an imbalance between perceived or subjective demand and perceived response capability. The behavior science model has provided the accident proneness through the life change unit factors considering human behavior, life style, ideas, culture, and psychological state. Therefore, this paper presents the Korean life change unit model through statistical testing with the proposed life change unit factors on the unmarried workers living in the middle area. The proposed model can be simply used in real fields in order to minimize the industrial accidents.

Outsourcing of Information Systems Functions : An Empirical Study of A Contingency Model (정보시스템 기능의 아웃소싱 : 상황모델의 실증적 연구)

  • Cheon, Myeon-Jung
    • Asia pacific journal of information systems
    • /
    • v.4 no.2
    • /
    • pp.131-164
    • /
    • 1994
  • A contingency model of outsourcing is developed from the information systems (IS) literature and strategic management literature in order to assess the following question: What factors influence change in the extent to which an organization outsources IS functions? Based on the literature, this study identifies four IS factors-gaps in information quality, IS support quality, IS staff quality, and IS cost effectiveness-and three organizational factors-the gap in financial performance, strategic orientation, and the role of information technology in an organization-that influence the change in degree of outsourcing. These factors are hypothesized to influence the change in the extent of an organization's outsourcing of IS functions. From a mail survey of 188 top IS executives in U.S. companies, the results of analysis of covariance and bivariate correlational and multivariate regression analyses provide the following major findings: (a) This study found support for the proposed research model. (b) The change in the degree of IS outsourcing is determined by gaps in information quality, IS support quality, IS cost effectiveness, and financial performance and by the role of IT among IS and organizational factors.

  • PDF

A Study on the Risk Factors for Successful Enterprise Architecture Implementation (성공적인 전사적 아키텍처 구축을 위한 위험요인에 관한 연구)

  • Park, Byung-Sun;Kim, Hyun-Soo;Yang, Kyung-Sik
    • Journal of Information Technology Services
    • /
    • v.5 no.3
    • /
    • pp.1-23
    • /
    • 2006
  • Today, Organizations should be equipped with flexibility in order to cope with rapidly changing environment in management. By doing so, they are able to grow and obtain their superior competitiveness in highly developed economic arena. Recently, Enterprise Architecture is actively constructed to perform such a change flexibly. In this regard, it is crucial to figure out some risk factors for the organizations that place an order. Besides, it is also important to find out the quality of EA and some risk factors caused by the organizations that receive an order. Lastly, it is absolutely important to verify the relationship between such factors and outcomes of EA. In this aspect, this study will verify risk factors made by the former organizations and investigate the quality of EA and its outcome by proving the said relationship. In doing so, it will suggest an appropriate direction for the companies that will build up or perform EA successfully.