The main objectives of this study are (1) to identify the conflict types in IS integration process with respect to M&A, (2) to propose the ways to manage the origin of conflict to be expected, and (3) to develop the conflict management model which establishes the relationship among the M&A strategy, the IS integration strategy and change management process that influence the source of conflict. In order to achieve these research objectives, this study focuses on banking industry under M&A with the viewpoint of change management instead of existing technology-oriented IS integration strategy. The findings of this study are thought not only to be useful as a practical guideline in carrying out IS integration project under M&A but also to provide significant basis for constructing the theoretical framework of effective IS integration strategy.
TUNG, Chu Hoi;MEMON, Shoeb Ahmed;JAVED, Arshad Ali
국제학술발표논문집
/
The 8th International Conference on Construction Engineering and Project Management
/
pp.323-330
/
2020
Project delays, cost overruns, and disputes are becoming a norm for the construction industry in Hong Kong. Researchers argue that the inability of traditional contracts to manage risk and associated changes are perhaps the main points of contention. The Institution of Civil Engineers published a new engineering contract (NEC), NEC4 Suite of Contracts in this to facilitate better risk management through collaborative culture in construction projects. NEC aims to increase the chances of project success thought its flexible nature of contracts, 'simple' and 'clearly written' documents and provision for the incentive by adopting a better management approach. This paper focuses on traditional and NEC contracts to compare risk management and change management aspects. Through literature review and preliminary interviews with three industry professionals, the paper is exploring how a change in traditional contracts can recuperate from disaster. Our interviewees in this work have extensive experience in traditional as well as in NEC contracts. The results suggest a proactive risk management provisions in NEC contracts does make a difference to avoid later escalation of issues. Whereas, management of change helps streamline all identified issues through a structured process without going in mediation or litigation. NEC, with its new approach to collaborative working, allows partners to be vigilant, yet gratifying in the project process.
Process incapability index which is intended to evaluate the process capability by measuring process incapability provides more detailed information by dividing information about the process mean and variance. But when the target value is not consistent with the center of specification, it is very difficult to evaluate the process capability accurately. Thus it is necessary to improve the existing process incapability index. The improved process incapability index can identify the variation of the process faster than other process capability indices when applied firstly, to the precision process which can be affected sensitively by the change of the process, secondly, to the ordinary process where cost difference from the change of process is noticeable. By using subindices such as inaccuracy index and imprecision index, it is easier for quality manager to find where the cause of the variation of process is, and to take necessary action in advance.
대규모로 진행되는 도시환경정비사업의 경우, 다수의 참여주체의 요구 및 내/외부적인 요인에 의하여 사업의 환경, 주체, 법규, 계획 등이 빈번히 변화되는 특성을 지닌다. 이처럼 대규모로 진행되는 도시환경정비사업에서는 다수의 변화의 가능성을 가지고 있는 만큼, 전체 사업의 업무프로세를 기반으로 변화요인을 정의하여 사업추진단계별로 발생 가능한 변화요인을 사전에 인지하고 체계적으로 관리할 수 있는 방안이 필요한 실정이다. 따라서 본 연구에서는 도시환경정비사업과 같이 다수의 변화 가능성이 내재된 사업의 체계적인 변화관리를 위하여, 업무프로세스를 기반으로 주요 변화관리 요인을 도출하였다. 또한 ANP방법론을 활용하여 도출된 변화요인들에 대한 외적, 내적 특성을 반영함으로써 사업 추진단계별 특성화된 주요 변화요인들의 중요도를 정량적으로 제시하였다.
건설기업은 내 외부의 경영환경이 글로벌화 되고 수주경쟁이 치열해 짐에 따라 기업 운영 효율성 증대와 수익성 증대를 위한 경영체제에 대한 노력이 요구된다. 1990년 이후 건설기업은 프로세스 중심의 내 외부 업무구조를 개선하기 위하여 BPR, 6시그마, PI, 워크플로우 관리, BPM 등 다양한 시도가 있었으며 기업내부에서 개선된 기능을 일부 획득 했으나 일회성 사업에 머물렀으며 변화에 대한 업무 프로세스 민첩성의 제공은 미비하였다. 또한 최근의 BPM 적용과 실용화 방안에 대해서는 타 산업분야의 이론과 방법론에 국한되어 있으며, 건설기업의 BPM 적용을 위한 도입 시도는 일부기업에서만 개념적 이론적 접근 및 검토단계에 머무르고 있다(B사, H사, 2007년 기준). 따라서 본 연구에서는 건설기업의 경영 패러다임의 변화를 반영하고 건설기업의 업무 프로세스 경영 모델의 도입현황과 개선요구사항을 분석하고자 한다. 또한 건설기업의 BPM 도입을 위하여, 지속 가능한 업무 프로세스 경영 모델의 구축방안을 제시함으로서 건설기업 BPM의 발전방향을 제시하고자 한다.
This paper proposes a change process model for organization development in health care organizations and provide an OD case exemplar of nursing service unit at Virtual Hospital. This case exemplar was written in a narrative form rather than in an argumentative form as an embodiment of organization development process as is viewed from the cultural/interpretive perspective rather than from the technical/rational one. This case exemplar illustrates the change process which consists of four interrelated components: change intervention, organizational target variables, individual organizational member, and organizational outcomes. It also demonstrates the applicability of the narrative rationality which involves narrative probability and narrative fidelity to the story where the learning organization, shared governance, and empowerment are fully emplotted and enlivened. The implications for organization development in health care organizations are discussed.
Software development organizations are globalizing their development activities increasingly due to strategic and economic gains. Global software development (GSD) is an intricate concept, and various challenges are associated with it, specifically related to the software requirement change management Process (RCM). This research aims to identify humans' related success factors (HSFs) and human-related challenges (HCHs) that could influence the RCM process in GSD organizations and propose a theoretical framework of the identified factors concerning RCM process implementation. The Systematic Literature Review (SLR) method was adopted to investigate the HSFs and HCHs. Using the SLR approach, a total of 10 SFs and 10 CHs were identified. The study also reported the critical success factors (HCSFs) and critical challenges (HCCHs) for RCM process implementation following the factors having a frequency 50% as critical. Our results reveal that five out of ten HSFs and 4 out of ten HCHs are critical for RCM process implementation in GSD. Finally, we have developed a theoretical framework based on the identified factors that indicated a relationship among the identified factors and the implementation of the RCM process in the context of GSD. We believe that the results of this research can help tackle the complications associated with the RCM in GSD environment, which is vigorous to the success and progression of GSD organizations.
Purposes: This study was performed to understand the recognition about accreditation motives, support within the hospital and accreditation survey process for the hospitals that participated in the accreditation program and to find out whether these factors are related to hospital management performances, so that the study can suggest plans for activation and development of the accreditation program. Methodology: This study was performed targeting 98 hospitals answered th the survey among 189 acute care hospitals that acquired accreditation from December 2010 to February 2014. For data analysis, frequency analysis, ${\chi}^2$-test, reliability analysis, ANOVA, Kruskal-Wallis H test and multiple regression analysis with SPSS 21.0 were used. Findings: The hospitals that had staff in charge of patient safety had bigger hospital culture change than those that didn't have(p<.05). In addition, the hospital culture change was bigger as internal motives were bigger, and as CEO's will was bigger(p<.05). Meanwhile, as maintenance rate of internal management after accreditation was higher, and as CEO's will was bigger, process improvement level was higher(p<.05). The quality improvement and patient satisfaction level were higher as CEO's will was bigger, and as suitability of survey process was recognized to be high(p<.05). As a result of analyzing the factors that affect hospital management performances with hospital culture change, process improvement and quality improvement combined, as internal management maintenance rate was higher, as CEO's will was bigger, and as suitability of survey process was higher, performances were higher(p<.05). Practical Implications: Hospitals need to reinforce internal motives to improve internal competences such as the whole system maintenance opportunity and staff training. In addition, the will of hospital director is most important, and if there is hospital director's interest in quality improvement and improvement intention definitely, employees voluntarily participate in and cooperate with the accreditation program, so that prompt medical service provision and high quality of medical services can be guaranteed, leading to hospitals' management performances.
This is to constitute strategic system and strategies for building family-friendly cultural change in workplace. For purpose, the reason and agent for change, the models and stages of change, the strategies for change process, and the barriers and facilitators of change are discussed. The strategic system is divided into two parts: planning and implementing. Planning includes need & resource assessment, and research & project office. Implementing includes program implementation, monitoring & feedback, communication, and barriers & facilitators. This study from literature review can be used preliminary test to the cultural change process of workplace.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.