• Title/Summary/Keyword: Change Management Process

Search Result 1,431, Processing Time 0.024 seconds

A Generalized MLE of the Process Change Point

  • Lee Jaeheon;Park Changsoon
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 2004.04a
    • /
    • pp.436-441
    • /
    • 2004
  • Knowing the time of the process change could lead to quicker identification of the responsible special cause and less process down time, and it could help to reduce the probability of incorrectly identifying the special cause. In this paper, we propose a generalized maximum likelihood estimate. (MLE) of the process change point when a control chart with variable sample size (VSS) scheme signals a change in the process mean, and evaluate the performance of this estimator when it mi used with a VSS EWMA chart.

  • PDF

Collaboration Management Architecture of construction process for Decision Support based on PLM (Project Life-cycle Management) (PLM 기반의 건설프로세스 의사결정을 위한 협업관리체계 개발)

  • Lim, Hyoung-Chul;Choi, Cheol-Ho;Chin, Sang-Yoon;Kim, Jae-Jun;Lee, Kwang-Myung;Yoon, Su-Won
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.165-169
    • /
    • 2007
  • In order to develop VirtuAlmighty system, CPDM (construction project data management) and CPLM (construction project lifecycle management) model must be settled beforehand. Because most of information systems based on 3D-Design have its own database and business process. So, our team will develop collaboration management architecture of construction process for Decision Support based on PLM (Project Life-cycle Management). This architecture with business processes and Database can be used in process develop, process monitoring with many stakeholders of project, process change management, and so on.

  • PDF

An Integrated Tool Model for the Management of Process and Artifact Management on CBD (컴포넌트 기반 개발에서의 프로세스 관리와 산출물 관리를 통합하는 도구의 모델)

  • Kim Young-Hee;Chong Ki-Won
    • Journal of Internet Computing and Services
    • /
    • v.5 no.4
    • /
    • pp.11-22
    • /
    • 2004
  • Works that improve the process and notify the improved process, the product and the change of tasks to all users are essential in achieving project. Existent project management tools support the definition and the change of project activities, and configuration management tools support version check, workspace management. build management. etc. It costs too much to buy each tool. as well as, it is burdensome to learn usage for various tools. Therefore the web-based integrated tool is proposed to manage the process and artifacts at a time in this paper. The proposed tool defines component based development process model. and achieves recording of process progression, processing the request of change, reporting the progression of each task, product registering and change, version recording, artifact or form search, etc. using ebXML. Furthermore, the stakeholders get the systematic management and standardization by sharing information that are necessary in process achievement and configuration management in distributed environment using the integrated management tool.

  • PDF

Change Antecedents, Explicit Reactions and Consequences for Revolution and Evolution: A Case Study of Commercial Banks in Pakistan

  • SHAFIQ, Madiha;SAEED, Bilal Bin
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.9 no.5
    • /
    • pp.119-133
    • /
    • 2022
  • The purpose of this study is to examine how change recipients react to change (affective commitment to change) and how change leads to positive consequences (job satisfaction) in Revolution and Evolution, taking into account the change content (perceived change impact), change context (change climate), and change process (participation in the change process). The present study uses a deductive approach with an exploratory research design. Data was collected from 254 employees of the head offices of three major banks, who have gone through Revolution, and 354 employees of the head offices, three banks who have gone through Evolution in the last five years. The hypothesized model is tested and analyzed through structural equation modeling using SmartPLS. The findings revealed that, in the case of Revolution, the presence of the favorable context and process might revert the negative perception of the change and lead towards explicit positive reactions (affective commitment to change) and change consequences (job satisfaction). In the case of Evolution, the change can be more effectively implemented using favorable context and process by achieving explicit positive reactions (affective commitment to change) and change consequences (job satisfaction).

Study On the Object Oriented Design Project of Online Game Engine Using UML (UML을 사용한 온라인 게임 엔진 프로젝트 설계 연구)

  • Choi, Sung
    • Journal of Korea Game Society
    • /
    • v.5 no.1
    • /
    • pp.33-40
    • /
    • 2005
  • Game Designs & Developers that system designs improve, the product and the change of tasks to all developers are essential in achieving On-Line Game project. Existent Or-line Game project management designs supper the definition and the change of project activities, and configuration management designs support version check, workspace management, build management, etc. In this paper. the proposed Design defines Game component based development process model, and achieves recording of process progression, processing the request of change, reporting the progression of each task, product registering and change, version recording, artifact or form search, etc. using UML. Furthermore, study on the stake holders get the systematic management and standardization by sharing information that are necessary in Game design & development and configuration management in distributed environment using the system integrated management design.

  • PDF

Study On the Object Oriented Design Project of Online Game Engine Using UML (UML을 사용한 온라인 게임 엔진 프로젝트 설계 연구)

  • Choi, Sung
    • Journal of Korea Game Society
    • /
    • v.4 no.3
    • /
    • pp.21-28
    • /
    • 2004
  • Game Designs & Developers that system designs improve, the product and the change of tasks to all developers are essential in achieving On-Line Game project. Existent On-line Game project management designs supper the definition and the change of project activities, and configuration management designs support version check, workspace management, build management, etc. In this paper, the proposed Design defines Game component based development process model, and achieves recording of process progression, processing the request of change, reporting the progression of each task, product registering and change, version recording, artifact or form search, etc. using UML. Furthermore, study on the stake holders get the systematic management and standardization by sharing information that are necessary in Game design & development and configuration management in distributed environment using the system integrated management design.

  • PDF

Manufacturing strategy and change programs of Korean firms (한국제조기업의 생산전략과 생산혁신활동)

  • 이승규;김진섭
    • Korean Management Science Review
    • /
    • v.13 no.1
    • /
    • pp.135-156
    • /
    • 1996
  • The purpose of this paper is to study the links between manufacturing strategy and change programs of manufacturing firms in Korea. The nature of our analysis is more descriptive than normative or confirmative. First, we investigate the linkage between manufacturing strategy, manufacturing capability, change programs and performance measurement systems. Secondly, we intend to explore an empirical typology of manufacturing strategy and change programs. The initial findings of the study are as follows: Linkage between manufacturing strategy and change programs of manufacturing firms was not apparent. Flexibility as a strategic priority is positively related to the innovative change programs. There are two distinctive strategies of manufacturing firms in Korea, namely, quality strategy and balanced strategy. We identified three types of change programs, which are incremental change, administrative innovation, and process innovation. Incremental change group has represented low factor score in the change program dimensions. The firms in administrative innovation group mainly depend on information systems and business reengineering. Korean manufacturing firms seem to pursue process improvement by trying simultaneously incremental change in the process, managerial process improvement, and a little bit of innovative change. Performance variable utilization of the firms are not significantly different along with manufacturing strategies and change programs. We found, however, learning and improvement performance dimension is significantly related to flexibility variables. Process innovation group marked high score in usage of learning and improvement indices. The findings of this study seem to have various implications on realigning the manufacturing strategy, change programs, and performance systems in Korean firms.

  • PDF

A Study on Information Strategy Development Using Configuration Management in Large-scale Construction Project (형상관리기법을 활용한 대형 프로젝트 정보화 전략개발)

  • Won, Seo Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.66-67
    • /
    • 2018
  • Large-scale construction projects require various license and technologies for the manufacturing and handling processes. Also, the whole life cycle business process management determines the success of the project. Then, the efficiency of the business conducted by stakeholders and their possessed technology should be enhanced in order to strengthen their competitive power. For this reason, many experts pointed out to focus on the improvement of the life cycle process and efficient management. Since it is very important to keep up-to-date data and utilize it for work during the long-term project to reflect changes in the large-scale project, the most important part of the project management in project is information change management. Therefore, the objective of this study is applying configuration management(CM) technique in order to managing change data generated for planning in early phase. The result of this research will certainly assist the large-scale project managers in the development of information change management system.

  • PDF

ANALYZING EFFECTIVE FACTOR OF THE CHANGE MANAGEMENT BASED ON URBAN REGENERATION PROJECT IN REPUBLIC OF KOREA

  • Jae-Pil Seo;Yoon-Ki Choi;Bo-Sik Son;Han-Guk Ryu
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.591-596
    • /
    • 2011
  • There are quite a number of business processes in the urban regeneration project. Managers and participants who involved in the project make and use information for the best way to perform in the particular business process. The information can be also reused and produced for data at the next stage. Accordingly, the information sometimes goes out of existence and work data up into new information when the urban regeneration project has been accomplished. But in that case some of changes happen occasionally, the business for urban regeneration has suffered a loss of profit and time as result of confusions about decisions and inappropriate action. For that reason, the information should be analyzed to achieve its aim at the business process under the influence of changes. Then, even though detail processes and management method change, the Core Information, which are important factors for accomplishing the project, help that the project can be operated to solve the problem about confusion and loss of the business. In conclusion, the Core Information is main effective factors for successful urban regeneration projects on the change management. The purpose of this study is to research the information according to the Information-flow and changes, and to find out the influence factors and the Core Information to manage efficiently at the process of urban regeneration projects.

  • PDF

An Analysis of Ecosystem Service's trade-off through Systems Thinking (시스템 사고를 통한 생태계서비스의 trade-off 관계 고찰)

  • Ham, Eun Kyung;Kim, Min;Chon, Jinhyung
    • Korean System Dynamics Review
    • /
    • v.16 no.2
    • /
    • pp.75-100
    • /
    • 2015
  • The purpose of this study is to analyze causation of Ecosystem service's trade-off(ES trade-off) and to establish baseline data for wise spatial planning and management. In order to understand why and how ES trade-off occurs, systems thinking and causal loops were employed. The causal loop of ecosystem service creation cycle includes profits quantification process, decision making process, spatial planning and management process, and ecosystem services creation process. The profits quantification process has a limitation that all ecosystem service categories were not included in profits quantification, because quantification method for cultural services is insufficient. These problems led to unequal discussion opportunity in decision making process. ES trade-off occurs through transition of ecosystem function in spatial scale and temporal scale. In spatial scale, land-use variation and resource-use variation contribute to change an ecosystem function for different ES category by spatial planning and management. In temporal scale, a change of an ecosystem function for different ES category is influenced by ecological succession, seasonal change and land cover variation, which are parameter from environmental features. This study presented that spatial planning and management should ecosystem service assessment in order to enhance balanced ecosystem services.