• 제목/요약/키워드: Causes of Delay

검색결과 497건 처리시간 0.035초

시간지연추정제어기에 관한 리뷰 (Review on controllers with a time delay estimation)

  • 이효직;윤지섭
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 2005년도 춘계학술대회 논문집
    • /
    • pp.1120-1124
    • /
    • 2005
  • We reviewed controllers with a time delay estimation in this paper. Time delay control (TDC) and sliding mode control (SMC) are well known robust control schemes. Basically, the TDC has a main characteristic called a time delay estimation from which we can estimate the total uncertainty of a system. . The TDC causes the stick-slip in the case of systems with a friction. The so-called TDCSA which are short for TDC with switching action was developed to reduce the stick-slip. The TDC has the additional switching action term in the TDC structure. In the other hand, the SMC dose not have a time delay estimation but instead it can estimate the system uncertainty through the switching action. The SMC has a difficulty to estimate the total uncertainty of a system because it does not have a time delay estimation. In order to solve the difficulty, some control schemes were developed. Among them, we need to focus our attention on two control schemes: SMCPE and SMCTE, which are short for sliding mode control with a perturbation estimation and sliding mode control with a time delay estimation, respectively. In this paper, we analyzed and compared the characteristic of above three controllers. Even though the motives for the development of three control schemes are different, three control schemes have much in common in terms of their controller structures.

  • PDF

Improved Paired Cluster-Based Routing Protocol in Vehicular Ad-Hoc Networks

  • Kim, Wu Woan
    • International journal of advanced smart convergence
    • /
    • 제7권2호
    • /
    • pp.22-32
    • /
    • 2018
  • In VANET, frequent movement of nodes causes dynamic changes of the network topology. Therefore the routing protocol, which is stable to effectively respond the changes of the network topology, is required. Moreover, the existing cluster-based routing protocol, that is the hybrid approach, has routing delay due to the frequent re-electing of the cluster header. In addition, the routing table of CBRP has only one hop distant neighbor nodes. PCBRP (Paired CBRP), proposed in this paper, ties two clusters in one pair of clusters to make longer radius. Then the pair of the cluster headers manages and operates corresponding member nodes. In the current CBRP, when the cluster header leaves the cluster the delay, due to the re-electing a header, should be occurred. However, in PCBRP, another cluster header of the paired cluster takes the role instead of the left cluster header. This means that this method reduces the routing delay. Concurrently, PCBRP reduces the delay when routing nodes in the paired cluster internally. Therefore PCBRP shows improved total delay of the network and improved performance due to the reduced routing overhead.

관측기 설계에 의한 시간지연 시스템의 강인한 제어 (Robust control of input time delay systems by observer design)

  • 김정원;이장명
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 1998년도 하계종합학술대회논문집
    • /
    • pp.239-242
    • /
    • 1998
  • Most of time delay existing in industrial processes can be modeled as an input time-delay which causes a lot of difficulties. To implement a time-delay free control, loop transfer function is recovered through the direct state feedback. For the proper state feedback, and observer is designed based upon the factorization approach which is known as one of the most powerful tool for the design of various control systems. The design scheme is parctically applied for the control of a DC motro which suffers from input time-delay. Simulational results demonstrate that this new algorithm guarantess the stability of the time-delayed system, as well as performance improvement compared to the conventional PI control.

  • PDF

평균방법에 근거한 DOA와 지연시간추정에 관한 연구 (A Study on DOA and Delay Time Presumption based on Average Method)

  • 이관형;송우영
    • 한국시뮬레이션학회논문지
    • /
    • 제13권2호
    • /
    • pp.1-12
    • /
    • 2004
  • This paper estimated the arrival angle and electric wave delay time using the space method law and the directions of arrival (DOA) estimation algorithm in case of signal correlation. Space method law is the method used to repress cross correlation before applying the weight value to the receiving signal. The values of the diagonal elements in the correlation matrix were averaged to replace as the diagonal elements value. In the area of wireless communication or mobile communication, there are high correlations in case of low delay time difference in multiple waves. This causes the quality of the communication to drop due to interference with the desired signal elements. This paper estimated the arrival angle and electric wave delay time using the space method law and the MUSIC algorithm. With the arrival angle algorithm, the arrival angle cannot be estimated below 5 in case of signal correlations because the angle resolution capacity decreases accordingly. The super resolution capacity was estimated to determine the arrival angle below 5 in this paper. In addition, the proposed algorithm estimated the short delay time difference to be below 20ns.

  • PDF

Investigating delay factors in construction industry: A Korean perspective

  • Acharya, Nirmal Kumar;Im, Hae-Man;Lee, Young-Dai
    • 한국건설관리학회논문집
    • /
    • 제7권5호
    • /
    • pp.177-190
    • /
    • 2006
  • Construction projects are facing delay problems. Delays in construction have been immense effect on performance or satisfactory delivery of the project. Delays have been causing project cost overrun as well as it is a source of dispute hence damaging the relationship between the project participants. The purpose of this study was to explore the causes of delay risk through a field survey study. Data were collected from construction professionals working in owner, consultant and contractor organizations. All together 208 questionnaire instruments were used and analyzed by employing statistical tools (SPSS computer program). 19 delay factors were identified by this study, out of which following factors were critical: Frequent interruptions from public (local people, pressure group etc.), changed site condition, failure to provide required construction site, unrealistic project time estimation and design errors.

인천국제공항에서의 운항을 통해서 살펴본 안개예측의 중요성 (The Importance of Fog prediction at the Incheon Int'l Airport through flight delay and cancel statistics)

  • 임헌호;김동혁;송기욱
    • 한국항공운항학회지
    • /
    • 제13권4호
    • /
    • pp.1-10
    • /
    • 2005
  • According to the aviational definition, the fog is an obscuration phenomenon when prevailing visibility becomes less than 1,000m. Fog defined above causes so many aviation traffic problems like detour, flight delay and cancel. Therefore this study investigated quantitatively the fog effects on flight operation using flight delay and cancel statistic data during last four years from 1st Jul. 2001 to 30th Jun. 2005 at the Incheon Int'l Airport. The results of this study show that the hazardous meteorological condition is a important cause of flight delay and cancel, especially fog phenomenon. And it is expected that the results of this study give us the necessary and importance of fog prediction at the Incheon Int'l Airport.

  • PDF

파워 상호보완 윈도우를 이용한 지연 감소 IntMDCT (Low Delay IntMDCT Using Power Complementary Window)

  • 이상환;이인성
    • 한국음향학회지
    • /
    • 제32권6호
    • /
    • pp.525-531
    • /
    • 2013
  • 본 논문은 파워 상호보완 윈도우를 이용한 지연 감소 알고리즘을 IntMDCT(Integer Modified Discreate Cosine Transform)에 적용하고자 제안한다. 기존에 사용하는 변환 방식인 MDCT는 정수 입력에 대해 실수 값을 출력하므로 데이터의 확장을 야기 시킨다. 이에 정수 대 정수 변환인 IntMDCT 기술이 등장했다. 하지만 IntMDCT는 MDCT(Modified Discreate Cosine Transform)처럼 알고리즘 지연을 갖는 문제점을 가지고 있다. 지연은 실시간 통신을 목표로 하는 환경에 있어 중요한 이슈로 자리 잡고 있다. 이러한 샘플의 지연을 최소화하기 위해 제안하는 알고리즘을 적용하고 성능을 평가한 결과, IntMDCT에서 발생하는 샘플 지연이 절반으로 감소하는 것을 확인 할 수 있었다.

SD를 이용한 공공 프로젝트의 지체요인 분석 (Delay Factor Analysis of Public Project Based on System Dynamics)

  • 이만형;이정민
    • 한국시스템다이내믹스연구
    • /
    • 제4권2호
    • /
    • pp.95-130
    • /
    • 2003
  • The purpose of this study is to find what causes make public projects hold off, going beyond the planned deadline and budget. Using System Dynamics(SD) and their derivative Urban Dynamics(UD) models, it intends to analyze major feedback loops based on VENSIM and to simulate them with STELLA software, all of which are interrelated with various causes of project delay. To prevent or ameliorate project delay, first of all it advises to focus on endogenous delaying factors not exogenous ones. These factors either reinforce or balance certain loops in complex causal structure, In the case example on the Cremation Building Project in Cheongju, Residents’ participation demand make negotiation put off and delayed negotiation reinforces administrative-expediency planning in order to observe a time limit, on the other hand, once building consensus, it increase both the level of planning performance and public trust. In the meantime, the real planning process used to neglect residents opinions and manage public grievance only through compensation, he a result of simulation, visible fruit of negotiation in the initial phase seems to be not satisfactory owing to funds and time consumed, but after reaching an mutual agreement among stakeholders, planning performance is effective and strategic than administrative-expediency planning viewed in both financial and time angle. It proposes to devise specific tools schematizing project implementation. In order to upgrade the quality of project management, it recommends for planners to adopt key concepts based on SD/UD diagrams and causal loops, which would contribute to enriching Planning abbots.

  • PDF

Malformations of cortical development: genetic mechanisms and diagnostic approach

  • Lee, Jeehun
    • Clinical and Experimental Pediatrics
    • /
    • 제60권1호
    • /
    • pp.1-9
    • /
    • 2017
  • Malformations of cortical development are rare congenital anomalies of the cerebral cortex, wherein patients present with intractable epilepsy and various degrees of developmental delay. Cases show a spectrum of anomalous cortical formations with diverse anatomic and morphological abnormalities, a variety of genetic causes, and different clinical presentations. Brain magnetic resonance imaging has been of great help in determining the exact morphologies of cortical malformations. The hypothetical mechanisms of malformation include interruptions during the formation of cerebral cortex in the form of viral infection, genetic causes, and vascular events. Recent remarkable developments in genetic analysis methods have improved our understanding of these pathological mechanisms. The present review will discuss normal cortical development, the current proposed malformation classifications, and the diagnostic approach for malformations of cortical development.

Factors Affecting Timely Completion of Construction Projects in Nepal

  • ;이영대;김수용
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.254-257
    • /
    • 2003
  • It is common to experience delays during construction projects. Delays can ca use substantial damages to an owner as well as contractors and is the sources of frequent disputes and claims. Many studies have been carried out to assess the causes of delays in construction projects. They are found to be almost similar, except some prevailed local condition. Most of the common construction delay factors are attributed to design faults, incompetent contractor, lack of team accountability etc. To minimize or eliminate the delay we have to follow the recognized fundamental principles of management such as: cost-time relationship, time priority, accountability, rewards, innovative thinking etc. The root causes of delays found out in this paper are not so much different than other previous study. If the implementing agencies properly followed the, fundamental management principles and some other related corrections as recommended in the paper, much construction delays can be avoided.

  • PDF