• Title/Summary/Keyword: Cast-in anchor

Search Result 42, Processing Time 0.035 seconds

An Performance Evaluation of Post-installed Anchor according to the Effective Embedment Length (유효묻힘깊이에 따른 후설치앵커의 인발성능평가)

  • Hur, Moo-Won;Chae, Kyoung-Hun;An, Yeong Seung;Hur, Moo-Won
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.26 no.4
    • /
    • pp.19-25
    • /
    • 2019
  • Concrete wedge anchor is one of structural components to transfer load of an object attached to a primary structure. Recently, as retrofitting concrete structure is becoming a main issue, mechanical capacity of the anchor should be secured enough. In spite of the structural safety of Cast-in-place anchor, Post-installed anchor is more widely used with ease of placement or change of construction method. However, the post-installed anchors domestically produced have excessive coefficient of variation over 15% of ultimate tensile strength, which yields deteriorated quality in tensile strength. In this research, tensile strength test of anchors, which have improved sleeve and header and produced by a domestic company, was conducted for two variables, concrete strength and effective embedment depth. As a result, enough coefficients of variations were secured in all specimens. Also, in comparison to foreign products, the domestic ones have equal or higher performance.

Static Shear Strength of Cast-in Anchors with Stirrup Reinforcement (스터럽 보강 선설치 앵커의 정적 전단하중에 대한 저항 강도)

  • Park, Yong Myung;Jo, Sung Hoon;Kim, Tae Hyung;Kang, Choong Hyun;Kim, Jae Bong
    • Journal of Korean Society of Steel Construction
    • /
    • v.28 no.1
    • /
    • pp.1-12
    • /
    • 2016
  • An experimental study was conducted to evaluate the static shear strength of stirrup-reinforced cast-in anchors. The test parameters considered herein are an existence of front bearing bar and concrete crack. M36 anchor was used with an edge distance of 180mm. HD-10 bars were used for all reinforcing bars and the stirrups were placed with 100mm spacing. The shear resistance increased by 16% when the front bearing bar was installed. Meanwhile, the resistance reduced only 5% in the cracked concrete compared with the uncracked concrete. The test results showed that ACI 318 and ETAG 001 specifications could estimate the shear strength of stirrup-reinforced anchors conservatively and a rational method was proposed. A consideration on the fracture strength of stirrup-reinforced anchor is also given.

Fracture behavior of Cast-in-place Headed Anchors to Concrete (콘크리트 CIP 앵커시스템의 파괴 거동에 관한 연구)

  • Park, Sung-Gyun;Kim, Ho-Seop;Yoon, Young-Soo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.5 no.3
    • /
    • pp.141-152
    • /
    • 2001
  • This paper presents the evaluation of behavior and the prediction of tensile capacity of anchors that can cause a failure of the concrete on the basis of the design for anchorage. Tests of cast-in-place headed anchors, domestically manufactured and installed in uncracked and unreinforced concrete member are conducted to test the effected of embedment length and edge distance. The failure modes and the load-deformation responses of the anchors are discussed and then the concrete failure data are compared with capacities by the two present methods : the 45 degree cone method of ACI 349, 318 and the concrete capacity design (COD) method. Differences between the results by test and by two prediction methods are analyzed Finite Element Method (FEM).

  • PDF

Performance Evaluation of the Cast-in-place Anchor Bolt in Non-cracked Concrete used in Power Plant Facilities (비균열 콘크리트에 매립된 발전설비 정착부 선 설치 앵커의 구조성능 평가)

  • Kim, Dong-Ik;Jong, Woo-Young
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.11
    • /
    • pp.250-258
    • /
    • 2019
  • The seismic performance and stability of operating facilities installed in domestic power plants need to be verified because of the increased incidence of earthquakes resulting in power plant damage due to the overturning failure of electric operating facilities. In this study, a structural performance evaluation of the anchor bolts constructed to setup the operating facilities on concrete slabs was carried out through an on-site inspection of power plants, called Daechung-Dam. M10 J hook and M12 J hook anchor bolts were installed in the field unit. According to the ASTM E 488-96 specifications, anchor bolt pullout and shear tests were carried out and compared with the anchor-bolt design standards. The results from the tension and shear pullout tests showed that the M10 and M12 J hook anchor bolts had higher performance than the required design load. Thus, they were found to be safe enough. Nevertheless, more research in the field of analytical study will be needed in the near future.

Shear Strength of Hairpin Reinforced Cast-In-Place Anchors by Static and Seismic Qualification Tests (헤어핀 보강 선설치앵커의 정적 및 지진모의실험에 의한 전단 저항강도 평가)

  • Kim, Dong Hyun;Park, Yong Myung;Kim, Tae Hyung;Jo, Sung Hoon;Kang, Choong Hyun
    • Journal of Korean Society of Steel Construction
    • /
    • v.27 no.3
    • /
    • pp.333-345
    • /
    • 2015
  • This study evaluated the static and dynamic shear strength of cast-in-place anchors reinforced with hairpin bars in uncracked and cracked concrete. The anchors 30mm in diameter reinforced with D10 hairpin bar were designed with an edge distance of 150mm and an embedment depth of 240mm. The cracked specimens consisted of the orthogonal and parallel cracks to the direction of shear loads, respectively. The dynamic strength was evaluated using seismic qualification tests based on the ACI 355.2 standard. The shear strength of the hairpin reinforced anchor was hardly correlated to the concrete cracks and the dynamic strength was similar to its static shear strength. Finally, a consideration on the design strength of hairpin reinforced anchors was presented.

Shear Resistance of CIP Anchors under Dynamic Loading: Unreinforced Anchor (선설치앵커의 동적 전단하중에 대한 저항강도: 비보강 앵커)

  • Park, Yong Myung;Kang, Moon Ki;Kim, Dong Hyun;Lee, Jong Han;Kang, Choong Hyun
    • Journal of Korean Society of Steel Construction
    • /
    • v.26 no.1
    • /
    • pp.11-20
    • /
    • 2014
  • The Concrete Capacity Design(CCD) method has been used in the design of anchor since 2001 and Korean design code specify that concrete breakout capacity of CIP anchor under seismic load shall be taken as 75% of static capacity. In this study, an experimental study was performed to evaluate the concrete breakout capacity of unreinforced CIP anchors under dynamic shear force. For the purpose, three static and dynamic shear-loading tests were conducted using 20mm diameter anchors, respectively. The edge distance of 120mm was considered in the tests. In the dynamic tests, 15 cycles pulsating load with 1Hz speed was applied and the magnitude of loading step was increased until concrete breakout failure occurs. From the tests, the concrete breakout capacity under dynamic shear loading showed nearly same capacity by static loading.

Structural Performance of the Cast-in-place Anchor in Cracked Concrete used in Power Plant Facilities (균열 콘크리트에 매립된 발전설비 현장설치용 선 설치 앵커의 구조성능 평가)

  • Kim, Dong-Ik;Jung, Woo-young
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.7
    • /
    • pp.120-128
    • /
    • 2019
  • It is very important to verify the seismic performance and stability of the power plant fixture in the domestic power plant, because earthquakes have increased in frequency around the world which resulted in the frequent occurrence of power plant damage caused by the failure of electric power facilities. In this study, through the on-site inspection of power plant fixation unit installed in domestic power plants, we carried out structural performance evaluation of the fixation unit anchor bolts installed on the concrete slabs. The field survey showed M12 J hook anchor bolts were used. Anchor bolt pullout and shear performance evaluation were performed based on ASTM E 488-96 standard. Moreover, artificial crack with the width of 0.5 mm was applied during the experiment based on ATM355.4 and ETAG 001. The comparison of M12 J hook anchor bolt pullout and shear test result to design value required in domestic and international design standard, show a satisfactory result. M12 J hook anchor pullout and shear performance was found to be about 35% and 7%, respectively, higher than the required design value.

A study on structural performance of steel brackets in vertical shaft connected to double-deck tunnel (복층터널 연결 수직구용 철재브래킷 구조성능 연구)

  • Shin, Young-Wan;Min, Byeong-Heon;Nam, Jung-Bong;Lee, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.3
    • /
    • pp.363-375
    • /
    • 2019
  • Since the double-deck tunnel is deeply constructed in the city, it is necessary to secure the installation space of air supply and exhaust, escape passage stairs, elevator, distribution facilities and connection tunnels in the vertical shaft for the double-deck tunnel. Also, in order to minimize the effect of construction on adjacent area, it is necessary to construct the concrete structures at high speed in vertical shaft after tunnel excavation. Therefore, the slabs and the stairs in vertical shaft are needed to be constructed using precast concrete, and the rapid construction techniques of bracket for supporting the inner precast structure are needed. The bracket installation methods include cast-in-place concrete, precast concrete and steel. In this study, the improvement of the steel brackets with good economical efficiency and good workability was carried out in consideration of the improvement of the construction speed. We have developed a new bracket that is optimized through bracket shape improvement, anchor bolt position adjustment and quantity optimization. As a result of the structural performance test, it was confirmed that the required load supporting capacity was secured. As a result of structural performance test for bar type anchor bolt and bent anchor anchor bolt, it was confirmed that the required load carrying capacity was secured and that the load bearing capacity of bent anchor bolt was large.

Osteolysis-Related Bioabsorbable Suture Anchor Fixation in a Medial Collateral Ligament Avulsion Fracture during Total Knee Arthroplasty (슬관절 인공관절 치환술 중 발생한 내측 측부 인대 견열 골절에 대해 생흡수성 봉합 나사못을 이용한 고정 후 발생한 골용해)

  • Huh, Jung-Wook;Park, Man-Jun;Hong, Seong-Hwak;Park, Joon-Hyung
    • Journal of the Korean Orthopaedic Association
    • /
    • v.55 no.6
    • /
    • pp.545-549
    • /
    • 2020
  • Although rare, the treatment options for a medial collateral avulsion fracture during total knee arthroplasty (TKA) range from conservative management using a cast and orthosis to internal fixation using metal screws. Bioabsorbable suture anchors have been used to replace metal fixators with distinct advantages, such as biocompatibility, radiolucency, and unnecessary second removal surgery, but complications, such as osteolysis, have been reported. This paper reports a potential risk of an extensive osteolysis-related suture anchor fixation of a medial collateral ligament (MCL) avulsion fracture during TKA in conjunction with a literature review.