• 제목/요약/키워드: Capacity Of Wind Power

검색결과 286건 처리시간 0.036초

대규모 풍력발전 계통 연계시 주요 송전망 제약예측시스템 개발에 관한 연구 (A Study on the Development of Critical Transmission Operating Constraint Prediction (CTOCP) System With High Wind Power Penetration)

  • 허진
    • 조명전기설비학회논문지
    • /
    • 제29권1호
    • /
    • pp.86-93
    • /
    • 2015
  • Globally, wind power development is experiencing dramatic growth and wind power penetration levels are increasing. Wind generation is highly variable in time and space and it doesn't guarantee the system reliability and secure system operation. As wind power capacity becomes a significant portion of total generation capacity, the reliability assessment for wind power are therefore needed. At present, this operational reliability assessment is focusing on a generation adequacy perspective and does not consider transmission reliability issues. In this paper, we propose the critical transmission operating constraint prediction(CTOCP) system with high wind power penetration to enhance transmission reliability.

K-RE100 이행에 필요한 국내해상풍력단지 누적 설치량 전망 연구 (Prospects of Cumulative Installed Power Capacity of Domestic Offshore Wind Projects for K-RE100)

  • 강홍구;김병하;김헌조;양창조;정해창
    • 신재생에너지
    • /
    • 제20권2호
    • /
    • pp.44-54
    • /
    • 2024
  • The objective of this study was to contribute to domestic offshore wind farms by reasonably predicting the expected completion time and installed power generation capacity of offshore wind projects in South Korea. Offshore wind power is drastically regarded as a core tool for clean energy transition and industrial decarbonization in the fight against the climate crisis globally. Especially in South Korea offshore wind power is the main tool in partaking in RE100 and K-RE100, and the Korean government aims to install 14.9 GW of offshore wind farms by 2030. However, this seems to have been significantly delayed due to the complex process of obtaining permits for offshore wind power in Korea. Thus, a reasonable prediction of power generation and a timeline for the final construction are imperative. To establish the delay time for permit licenses, classified location factors were included into site analysis. These factors comprised reviews of transmission and military operability, environmental impact assessment, maritime traffic safety examination, wind resource assessment and an analysis of current offshore wind projects. According to the analysis, the majority of offshore wind projects currently being developed in Korea are predicted to be delayed by 3-5 years as they are among the criteria included in key discussion points for obtaining permits. The cumulative installed power capacity and annual power generation after construction are expected to be 37 GW and 97 TWh respectively.

풍력발전기 출력제한을 고려한 풍력한계용량 산정에 관한 연구 (A study on the maximum penetration limit of wind power considering output limit of WTGs)

  • 김형택;명호산;김세호
    • 한국태양에너지학회 논문집
    • /
    • 제31권6호
    • /
    • pp.23-31
    • /
    • 2011
  • The wind energy is one of the most prospective resources in renewable energy. However, the WTGS shouldn't be installed indiscriminately because the power system can be negatively influenced by a variable and uncertain nature of the wind energy. It is the reason why it has to be limited to install the WTGS thoughtlessly mentioned above that support the importance of the maximum penetration limit of wind power. It may required that power system operators suggests a new way of power system operation as percentage of the WTGS increase in the existing power system. The wind power is fixed in a limited area, so using rate of the wind power will be increased by installing additional WTGS. In this paper, we have studied on economic evaluation of the wind capacity increased by restricting the output of the WTGS as the way to increase the wind capacity.

Optimal Power Control Strategy for Wind Farm with Energy Storage System

  • Nguyen, Cong-Long;Lee, Hong-Hee
    • Journal of Electrical Engineering and Technology
    • /
    • 제12권2호
    • /
    • pp.726-737
    • /
    • 2017
  • The use of energy storage systems (ESSs) has become a feasible solution to solve the wind power intermittency issue. However, the use of ESSs increases the system cost significantly. In this paper, an optimal power flow control scheme to minimize the ESS capacity is proposed by using the zero-phase delay low-pass filter which can eliminate the phase delay between the dispatch power and the wind power. In addition, the filter time constant is optimized at the beginning of each dispatching interval to ensure the fluctuation mitigation requirement imposed by the grid code with a minimal ESS capacity. And also, a short-term power dispatch control algorithm is developed suitable for the proposed power dispatch based on the zero-phase delay low-pass filter with the predetermined ESS capacity. In order to verify the effectiveness of the proposed power management approach, case studies are carried out by using a 3-MW wind turbine with real wind speed data measured on Jeju Island.

A comparison of the performance characteristics of large 2 MW and 3 MW wind turbines on existing onshore wind farms

  • Bilgili, Mehmet;Ekinci, Firat;Demirdelen, Tugce
    • Wind and Structures
    • /
    • 제32권2호
    • /
    • pp.81-87
    • /
    • 2021
  • The aim of the current study is to compare the performance of large 2 MW and 3 MW wind turbines operating on existing onshore wind farms using Blade Element Momentum (BEM) theory and Angular Momentum (AM) theory and illustrate the performance characteristic curves of the turbines as a function of wind speed (U∞). To achieve this, the measurement data obtained from two different Wind Energy Power Plants (WEPPs) located in the Hatay region of Turkey was used. Two different horizontal-axis wind turbines with capacities of 2 MW and 3 MW were selected for evaluation and comparison. The hub-height wind speed (UD), turbine power output (P), atmospheric air temperature (Tatm) and turbine rotational speed (Ω) data were used in the evaluation of the turbine performance characteristics. Curves of turbine power output (P), axial flow induction factor (a), turbine rotational speed (Ω), turbine power coefficient (CP), blade tip speed ratio (λ), thrust force coefficient (CT) and thrust force (T) as a function of U∞ were obtained for the 2 MW and 3 MW wind turbines and these characteristic curves were compared. Results revealed that, for the same wind speed conditions, the higher-capacity wind turbine (3 MW) was operating at higher turbine power coefficient rates, while rotating at lower rotational speed ratios than the lower-capacity wind turbine (2 MW).

풍력발전단지 탈락 시를 고려한 단지 출력 변동 저감을 위한 HESS의 용량 산정 (Determination of the HESS Capacity for Mitigation of Fluctuation of Wind Farm Output under Consideration of Disconnecting Wind Farm)

  • 김승현;고지한;김일환
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2013년도 전력전자학술대회 논문집
    • /
    • pp.388-389
    • /
    • 2013
  • This paper presents the method for the fluctuation smoothing control by using relaxation time variable control of battery. When the output power of wind farm is changed suddenly, it is necessary to control the output power of wind farm. The smoothing relaxation time is changed within limits of battery output power. Using the hybrid energy storage system (HESS) combined with battery energy storage system and electric double layer capacitor, it is possible to control the output power of wind farm. The capacity of battery is determined by considering the case of the disconnecting wind farm from the grid. To verify the proposed method, simulations are carried out by using PSCAD/EMTDC with actual data of wind farm in the Jeju Island.

  • PDF

제주지역 풍력발전 및 태양광발전의 전력계통 부하기여 분석 (Analysis of the Load Contribution of Wind Power and Photovoltaic Power to Power System in Jeju)

  • 명호산;김형철;강남호;김영환;김세호
    • 한국태양에너지학회 논문집
    • /
    • 제38권1호
    • /
    • pp.13-24
    • /
    • 2018
  • As part of the "Carbon free Island 2030" policy, the local government of Jeju Island is currently working to reduce carbon through renewable energy supply. However, renewable energy is difficult to predict due to intermittent characteristics. If the share of renewable energy increase, it is difficult to plan of supply of electricity to grid due to that characteristic of renewable. In this paper analyze the fluctuation rate and the capacity credit of wind power and PV to find out how much wind power and PV contribute to supply of electricity of power system in Jeju. As a result mean value of variation rate of wind power and PV is about 3%, 5% and capacity credit is about 10% and 2% respectively.

Economic analysis of a 22.9 kV HTS power cable and conventional AC power cable for an offshore wind farm connections

  • Jung, Ga-Eun;Dinh, Minh-Chau;Sung, Hae-Jin;Park, Minwon;Yu, In-Keun
    • 한국초전도ㆍ저온공학회논문지
    • /
    • 제20권4호
    • /
    • pp.60-64
    • /
    • 2018
  • As the offshore wind farms increase, interest in the efficient power system configuration of submarine cables is increasing. Currently, transmission system of the offshore wind farm uses almost AC system. High temperature superconducting (HTS) power cable of the high capacity has long been considered as an enabling technology for power transmission. The HTS cable is a feasible way to increase the transmission capacity of electric power and to provide a substantial reduction in transmission losses and a resultant effect of low CO2 emission. The HTS cable reduces its size and laying sectional area in comparison with a conventional XLPE or OF cable. This is an advantage to reduce its construction cost. In this paper, we discuss the economic feasibility of the 22.9 kV HTS power cable and the conventional AC power cables for an offshore wind farm connections. The 22.9 kV HTS power cable cost for the offshore wind farm connections was calculated based on the capital expenditure and operating expense. The economic feasibility of the HTS power cable and the AC power cables were compared for the offshore wind farm connections. In the case of the offshore wind farm with a capacity of 100 MW and a distance of 3 km to the coast, cost of the 22.9 kV HTS power cable for the offshore wind farm connections was higher than 22.9 kV AC power cable and lower than 70 kV AC power transmission cable.

국내 풍력발전 설비의 이용률과 용량크레딧 분석 (Analysis of Capacity Factors and Capacity Credits for Wind Turbines Installed in Korea)

  • 백천현
    • 한국태양에너지학회 논문집
    • /
    • 제39권4호
    • /
    • pp.79-91
    • /
    • 2019
  • The capacity credit (CC) is a key metric for mid- to long-term power system capacity planning. The purpose of this study is to estimate the CCs of domestic wind turbines. Based on hourly capacity factor (CF) data during the seven years from 2011 to 2017, the new so-called probabilistic CF scheme is introduced to effectively reflect the variability of CFs on CC estimation. The CCs are then estimated through the CF-based method and the ELCC (Effective Load Carrying Capability) method reflecting the probabilistic CF scheme, and the results are compared. The results show that the CC value 0.019 for domestic wind turbines proposed in the $8^{th}$ Basic Plan for Electricity Supply and Demand corresponds to the CC with a confidence level slightly lower than 95%.

풍력발전기의 출력 안정화를 위한 에너지 저장장치 용량 산정 사례연구 (Analysis on Required Capacity of Energy Storage System to Mitigate Wind Power Fluctuation)

  • 강민혁;채상헌;안진홍;김일환
    • 한국태양에너지학회 논문집
    • /
    • 제37권6호
    • /
    • pp.59-68
    • /
    • 2017
  • In accordance with the policy of local government, the large scale of wind farms have been installed in Jeju power system. However, The intermittent characteristics of wind power output may cause grid voltage and frequency variation, especially in weak power system. One of the solution to solve this problem is installation of Energy storage system (ESS). In this case, the ESS will regulate the active power generated from wind farm to mitigate fluctuation. Actually, the local government of Jeju island constructed ESS connected to Hangwon wind turbine in 2016. From this point, this paper analyzes requirement capacity of ESS to mitigate wind power fluctuation based on measured data from Hangwon wind turbine and ESS. The simulation results will be carried out by Matlab program.