• Title/Summary/Keyword: Capability and Maturity Model

Search Result 83, Processing Time 0.041 seconds

The SPI Factors Affecting on Organizational Maturity Level: The Perspectives of Organizational Members and Assessment Types (소프트웨어 프로세스 개선의 영향요인이 조직의 성숙도에 미치는 영향 : 구성원 유형 및 심사 유형의 관점에서)

  • Kim, In-Jai;Yoon, Jea-Wook;Jun, Yong-Bum
    • Asia pacific journal of information systems
    • /
    • v.16 no.4
    • /
    • pp.27-47
    • /
    • 2006
  • Software companies try to upgrade the level of technology and quality of their products by adopting Software Process Improvement (SPI). First of all, the companies must understand affecting factors based on various environmental view points in order to acquire competitive advantage. In this study, a research model gets started on the basis of literature reviews, and identifies SPI factors that affect the maturity levels of organizations. Organizational members and assessment types are chosen as moderating factors. An empirical research has been made for analyzing the causal relationships among affecting factors and CMM levels. The results of this study will suggest several implications to decision makers who handle SPI issues.

Deep Meta Learning Based Classification Problem Learning Method for Skeletal Maturity Indication (골 성숙도 판별을 위한 심층 메타 학습 기반의 분류 문제 학습 방법)

  • Min, Jeong Won;Kang, Dong Joong
    • Journal of Korea Multimedia Society
    • /
    • v.21 no.2
    • /
    • pp.98-107
    • /
    • 2018
  • In this paper, we propose a method to classify the skeletal maturity with a small amount of hand wrist X-ray image using deep learning-based meta-learning. General deep-learning techniques require large amounts of data, but in many cases, these data sets are not available for practical application. Lack of learning data is usually solved through transfer learning using pre-trained models with large data sets. However, transfer learning performance may be degraded due to over fitting for unknown new task with small data, which results in poor generalization capability. In addition, medical images require high cost resources such as a professional manpower and mcuh time to obtain labeled data. Therefore, in this paper, we use meta-learning that can classify using only a small amount of new data by pre-trained models trained with various learning tasks. First, we train the meta-model by using a separate data set composed of various learning tasks. The network learns to classify the bone maturity using the bone maturity data composed of the radiographs of the wrist. Then, we compare the results of the classification using the conventional learning algorithm with the results of the meta learning by the same number of learning data sets.

Design of Process Support System based on CMMI (CMMI 기반 프로세스 지원 시스템 설계)

  • Choi, Dong-Hee
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.12 no.3
    • /
    • pp.344-353
    • /
    • 2009
  • In this paper, I have proposed a design of process support system based on CMMI process which can support integrated management and repository for CMMI model processes. The system assists small organization to improve business process and offers institutionalized automatic environment to users for use of CMMI processes. The proposed system also can enhance quality and productivity of project by including features such as convenience of project management, planned project administration and steady process improvement.

A Strategy for mapping Test Maturity Model(TMM) onto Capability Maturity Model Integration(CMMI) (테스트 성숙도 모델(TMM)과 능력 성숙도 모델 통합(CMMI)의 매핑 전략)

  • KiM Kidu;Shin Seok-kyoo;Kim R. Youngchul
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2005.11b
    • /
    • pp.307-309
    • /
    • 2005
  • 빠른 산업 발전 속에서 조직과 시스템이 복잡하고 대형화되면서 소프트웨어 품질을 향상시키고 그들의 신뢰성을 측정하기 위한 성숙도 모델들이 개발되었다. 그 중에서도 CMM와 이를 발전시킨 CMMI는 많은 조직에서 적용하기 위해 노력을 기울이고 있다. 하지만 두 모델들은 테스트 속성과 테스트 프로세스에 대한 언급이 부족하다. 본 논문에서는 모든 영역을 고려한 새로운 모델을 만들기 보다는 테스트 중심으로 개발된 TMM을 사용하여 CMMI과의 매핑을 통해 소프트웨어 조직의 생산품질과 신뢰성을 향상 시키는 방법을 제안한다. 논문에서는 CMMI 단점과 이를 보완하는 방법을 제안하고 이를 위해 TMM과 CMMI의 매핑전략에 언급한다. 이를 통해 기대되는 효과를 제시한다.

  • PDF

Development of 3 layer EVM(Earned Value Management) Guideline for XP(eXtreme programming) based on CMMI (CMMI기반의 XP를 위한 3단계 EVM 적용 지침 개발)

  • Jeong, Mi-Seo;Han, Hyuk-Soo
    • Journal of Internet Computing and Services
    • /
    • v.9 no.6
    • /
    • pp.155-163
    • /
    • 2008
  • Project Monitoring and Control is one of the required activities in project management. This activity provides the information about whether a project is making a progress as it is planned. It is usually performed in weekly meetings or milestone meetings where the project manager checks the project's current status based on project measures such as schedule, cost and work performance. One of the popular method for project monitoring and control is EVM(Earned Value Management). The major characteristic of EVM is that it uses only one measure 'cost' for schedule and work performance so that it enables 2 independent graphs to be illustrated in one integrated graph based on cost. For applying EVM to a project, it is essential to break whole work to work packages and to assign value of cost to each work package at the initial stage of the project. Therefore EVM is well matched with the lifecycle which requires whole plan at the beginning of project. However, in XP(eXtreme Programming), whole customer requirements are difficult to define and to make a complete plan at the beginning and are more detailed in each Iteration. Therefore EVM is not comfortable method for XP. Therefore in this research we suggest 3 layer EVM which can be applied in XP, and develop a process guidelines based on CMMI(Capability Maturity Model Integration) PMC(Project Monitoring and Control) process area.

  • PDF

Evaluation Model for the Stability of the Diagnostic Information System Incorporating the Quantitative Evaluation (정량적 평가를 도입한 정보시스템 안정성 진단 평가 모델)

  • Im, Hyeong-Do;Park, Dea-woo
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2016.05a
    • /
    • pp.313-316
    • /
    • 2016
  • Highly probable cause of the current turmoil critical national infrastructure and private enterprise information systems failures or national event of an accident, it is inevitable huge hit in corporate business as well as a significant impact on the national benefit. This is a trend subject to the stability of the national management information system has a significant impact on people and society, such as banking, telecommunications, transport and energy, which can be extended into a private institution. However, public and private ICT business through the development of Information system Audit or CMMI(Capability Maturity Model Integration) certification check the quality of the target system, but quality check on the reliability of the information system operations after construction is either not promoting met for some safety test results a situation that does not enabled by insufficient. By preventing the disorder or an accident of this study, the diagnostic reliability information systems through inspection and evaluation system development of information systems being established, and to minimize service confusion and study ways to ensure customer - oriented service.

  • PDF

A Quantitative Evaluation on Developmental Organization of Technical Proposals (기술제안서의 개발조직 부문에 관한 정량적 평가)

  • Choo, Kyung-Kyun;Kwon, Young-Kap;Rhew, Sung-Yul
    • Journal of Information Technology Services
    • /
    • v.3 no.1
    • /
    • pp.21-41
    • /
    • 2004
  • The technical proposal suggested and published by MIC(Ministry of Information and Communication, henceforth MIC) contains too general assessment elements, which causes qualitative and subjective assessment of technical proposals. Thus, in terms of the technical proposal assessment. It lacks In fairness, validity and accuracy. Furthermore, it has a great deal of difficulty in assessment caused by the inconsistency between proposal planning and assessment methods. Also, each company has different writing format, so it is impossible to make use of its maneuvering data for the assessment. To overcome these weaknesses, our research focused on a quantitative evaluation on development organization, which is a part of organizational and administrative part of the technical proposal suggested and published by MIC. In this research, we divided development organization for the technical proposal into organization, teams, and team members, and then studied addition, deletion and merging for the assessment criteria. For the related study, we chose especially CMM(Capability Maturity Model) from a lot of international and national references, which is a model measuring the maturity of organization, and then we focused on Small-CMM which is available in the small-sized organization. We also suggested input form, description method, assessment elements for the quantitative assessment in the chosen developmental organization, and finally we proposed standard referencing criteria for the assessment. Our study concludes that our assessment method are valid and available in comparison with the previous Delphi method through a validity evaluation test.

Development of ANSP Safety Maturity Survey Model for Enhancement of Air Traffic Service (항행 서비스 향상을 위한 항행시설 안전성숙도 평가 모델 개발)

  • Park, Dam-yong
    • Journal of Advanced Navigation Technology
    • /
    • v.20 no.2
    • /
    • pp.141-147
    • /
    • 2016
  • Stable and reliable air traffic service is required for users (aircraft pilot, air traffic controller, airlines and public) through enhancing capability related to airport operation and continuously improving air navigation system. ASMS (air navigation service provider (ANSP) safety maturity survey) is to determine the level of management and safety requirement such as organization, risk, policy, process, training and environment in Air traffic service field. We designed and developed the survey (26 study areas of management part and 23 study areas of safety part) considering global best practices (Eurocontrol and FAA) and customizing domestic circumstances with quantitative level assessment regarding management and safety issue of Air navigation system. The survey enables the performance of Air navigation system to enhance and prevents from occurring accident or incident. Therefore, we provides best information with users as well as high quality Air traffic service.

Design of Software Process Metrics and Procedures for Software Process Measurement (소프트웨어 프로세스 측정절차와 메트릭스 설계)

  • Hwang, Sun-Myung
    • The KIPS Transactions:PartD
    • /
    • v.10D no.4
    • /
    • pp.719-726
    • /
    • 2003
  • A SPICE (Software Process Improvement and Capability dEtermination) and CMM (Capability Maturity Model) assessment can be considered as representative software process assessment models since assessors assign ratings to indicators and metrics to measure the capability of software precesses. But ail of process assessment models don't provide a subjective measurement procedure and metrics. In this paper we define basic quality process metrics and propose standard metrics for each process based on SPICE and CMM. This study also proposed a guideline for a subjective measurement procedure and the metrics are effectively use to SPI.

QFD application to select CMM level 2 metrics (QFD 기법을 이용한 CMM 2단계 척도 선정)

  • 김종윤;정호원;김길조
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1997.10a
    • /
    • pp.45-48
    • /
    • 1997
  • SEI(Software Engineering Institute)의 CMM(Capability Maturity Model)은 소프트웨어 개발 공정 및 조직의 성숙도를 5개의 계층적인 단계로 분류, 평가하며, 성숙도 측정의 기준으로 계량적인 메저먼트를 각 단계별로 제시하고 있다. 본 연구에서는 CMM에 의해 제시된 메저먼트에 근거하여 정의되고 사용된 척도의 선정에 정보시스템 개발 및 품질 관리 기법인 QFD(Quality Function Deployment)를 적용하였다. 척도 사용자 그룹으로부터 CMM의 관심 영역, 사용 척도, 척도 계산에 필요한 측정치, 소프트웨어 개발 생명주기에 이르는 과정을 단계적인 흐름으로 파악하여 적절한 척도를 선택하는 데 본 연구의 목적이 있다.

  • PDF