• Title/Summary/Keyword: Cap Construction

Search Result 118, Processing Time 0.025 seconds

Study on Design Change of a Pipe Affected by Liquid Droplet Impingement Erosion (액적충돌침식 영향 배관의 설계변경에 관한 연구)

  • Hwang, Kyeong-Mo;Lee, Chan-Gyu;Bhang, Keug-Jin;Yim, Young-Sig
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.35 no.10
    • /
    • pp.1097-1103
    • /
    • 2011
  • Liquid droplet impingement erosion (LDIE) is caused by the impact of high-velocity droplets entrained in steam or air on metal. The degradation caused by the LDIE has been experienced in steam turbine internals and high-velocity airplane components (particularly canopies). Recently, LDIE has also been observed in the pipelines of nuclear plants. LDIE among the pipelines occurs when two-phase steam experiences a high pressure drop (e.g., across an orifice in a line to the condenser). In 2011, a nuclear power plant in Korea experienced a steam leak caused by LDIE in a pipe through which a two-phase fluid was flowing. This paper describes a study on the design change of a pipe affected by LDIE in order to mitigate the damage. The design change has been reviewed in terms of fluid dynamics by using the FLUENT code.

Time dependent behavior of piled raft foundation in clayey soil

  • Fattah, Mohammed Y.;Al-Mosawi, Mosa J.;Al-Zayadi, Abbas A.O.
    • Geomechanics and Engineering
    • /
    • v.5 no.1
    • /
    • pp.17-36
    • /
    • 2013
  • Settlement of the piled raft can be estimated even after years of completing the construction of any structure over the foundation. This study is devoted to carry out numerical analysis by the finite element method of the consolidation settlement of piled rafts over clayey soils and detecting the dissipation of excess pore water pressure and its effect on bearing capacity of piled raft foundations. The ABAQUS computer program is used as a finite element tool and the soil is represented by the modified Drucker-Prager/cap model. Five different configurations of pile groups are simulated in the finite element analysis. It was found that the settlement beneath the piled raft foundation resulted from the dissipation of excess pore water pressure considerably affects the final settlement of the foundation, and enough attention should be paid to settlement variation with time. The settlement behavior of unpiled raft shows bowl shaped settlement profile with maximum at the center. The degree of curvature of the raft under vertical load increases with the decrease of the raft thickness. For the same vertical load, the differential settlement of raft of ($10{\times}10m$) size decreases by more than 90% when the raft thickness increased from 0.75 m to 1.5 m. The average load carried by piles depends on the number of piles in the group. The groups of ($2{\times}1$, $3{\times}1$, $2{\times}2$, $3{\times}2$, and $3{\times}3$) piles were found to carry about 24%, 32%, 42%, 58%, and 79% of the total vertical load. The distribution of load between piles becomes more uniform with the increase of raft thickness.

A Study on the Negative Skin Friction based on Measurements from Existing Works Analysed by 3D Finite Element Analyses (기발표 실측치 분석을 기반으로 한 3차원 유한요소해석 수행을 통한 부마찰에 관한 연구)

  • Jeon, Sang Joon;Jeon, Young Jin;Jeon, Seung Chan;Lee, Cheol Ju
    • Journal of the Korean GEO-environmental Society
    • /
    • v.21 no.8
    • /
    • pp.15-27
    • /
    • 2020
  • In the current paper, a series of advanced 3D finite element analyses have been performed on existing pieces of work of negative skin friction from a geotechnical centrifuge test and full-scale field measurements. From these analyses, key features of pile behaviour under the influence of negative skin friction which, previously, were not fully understood in existing studies, have been meticulously discussed. As such, it has been possible to successfully address several numerical modelling issues such as negative skin friction induced pile settlements and group effects (the shielding effect), the effect of sacrificial piles in groups and the interaction between the pile head and the cap, the effect of interface elements at the pile-soil interface and the time-dependent pile behaviour. During a geotechnical centrifuge test, substantial amounts of negative skin frictions were mobilised when centrifugal acceleration increased from 1g to a certain g-level due to an increase in the self-weight of soil. The behaviour of piles inside a group were heavily affected by the sacrificial piles and the connectivity between the pile head and the pile cap. In particular, as negative skin friction has time dependent qualities associated with consolidation, it was logical to perform coupled analyses when analysing piles in consolidating grounds. From the current work, several insufficiencies of previous researches have been addressed, and the engineering pile behaviour subjected to negative skin friction has been clarified.

A study on the effects of ground reinforcement on the behaviour of pre-existing piles affected by adjacent tunnelling (터널근접시공에 의한 기 존재하는 인접말뚝의 거동에 지반보강이 미치는 영향에 대한 연구)

  • Jeon, Young-Jin;Kim, Sung-Hee;Kim, Jeong-Sub;Lee, Cheol-Ju
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.3
    • /
    • pp.389-407
    • /
    • 2017
  • In the current work, a series of three-dimensional finite element analysis was carried out to understand the behaviour of pile when the tunnel passes through the lower part of a single pile or group piles. At the current study, the numerical analysis analysed the results regarding the ground reinforcement condition between the tunnel and pile foundation. In the numerical modelling, several key issues, such as the pile settlements, the axial pile forces, the shear stresses and the total displacements near the tunnel have been thoroughly analysed. The pile head settlements of the single pile with the maximum level of reinforcement decreased by about 16% compared to the pile without ground reinforcement. Furthermore, the maximum axial force of the single pile with the maximum level of ground reinforcement experienced a 30% reduction compared to the pile without reinforcement. It has been found that the angle of ground reinforcement in the transverse direction affects the pile behaviour more so than the length of the ground reinforcement in the longitudinal direction. On the other hand, in the case of the pile group with the reinforced pile cap, the ground displacement near the pile tip appears to be similar to the corresponding ground displacement without reinforcement. However, it was found that the pile cap near the pile head greatly restrained the pile head movement and hence the axial pile force increased by about 2.5 times near the pile top compared to the piles in other analysis conditions. The behaviour of the single pile and group piles, depending on the amount of ground reinforcement, has been extensively examined and analysed by considering the key features in great details.

A study on platform-based preliminary design guidelines associated with the behaviour of piles to adjacent tunnelling (터널근접시공에 의한 말뚝의 거동을 고려한 플랫폼 기반의 예비 설계 가이드라인에 대한 연구)

  • Jeon, Young-Jin;Lee, Gyu-Seol;Lee, Jae-Cheol;Batbuyan, Chinzorig;Lee, Cheol-Ju
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.2
    • /
    • pp.129-151
    • /
    • 2022
  • In the current work, a series of three-dimensional finite element analyses have been carried out to understand the behaviour of piles when the adjacent tunnelling passes underneath grouped piles with a reinforced pile cap. In the current study, the numerical analysis studied the computed results regarding the ground reinforcement condition between the tunnel and pile foundation. In addition, several key issues, such as the pile settlements, the axial pile forces, the shear stresses and the relative displacements have been thoroughly analysed, and the IoT platform based preliminary design guidelines were also presented. The pile head settlements of the nearest pile from the tunnel without the ground reinforcement increased by about 70% compared to the farthest pile from the tunnel with the maximum level of reinforcement. The quality management factor data of the piles were provided as API (Application Programming Interface) of various forms by the collection and refinement. Hence it has been shown that it would be important to provide the appropriate API by defining the each of data flow process when the data were created. The behaviour of the grouped piles with the pile cap, depending on the amount of ground reinforcement, has been extensively analysed, and the IoT platform regarding the quality management of piles has been suggested.

Comparison of Pipeline and Clamshell Capping Technologies for the Remediation of Contaminated Marine Sediments (해양 오염퇴적물 정화를 위한 원통관과 클램쉘을 이용한 피복 기술의 비교)

  • Kang, Ku;Hong, Seong-Gu;Kim, Young-Kee;Park, Seong-Jik
    • Journal of Navigation and Port Research
    • /
    • v.41 no.4
    • /
    • pp.195-206
    • /
    • 2017
  • In situ capping technology for marine sediment pollution control has never been applied in South Korea. In this study a pilot project for the capping was carried out in Busan N Harbor. Pipeline and clamshell capping technologies were implemented for the pollution control. Changes of capping shapes, sediment contamination, and the time and costs required for the two constructions were compared. Both the pipeline and clamshell technologies were found to satisfy the target thickness of 50 cm on average. However, the pipeline method did not operate sensitively in terms of change of the sea floor topography, resulting in an uneven shape and a thickness. Organic carbon and ignition loss quite decreased after the pipeline or the clamshell capping while pH showed no significant change. Organic and residual fraction of Cd, Ni, and Zn in the sediments appeared to decrease after all cappings. The pipeline method took a construction time four times as much as the clamshell method. The clamshell method was demonstrated to reduce the construction cost by about 40% compared with the pipeline method. However, a monitoring for all the parameters needs to be conducted at least two years in order to better evaluate an efficiency of the pollution control by these capping constructions.

Dynamic Behavior Characteristics of Group Piles with Relative Density in Sandy Soil (건조 모래지반의 상대밀도에 따른 무리말뚝의 동적거동특성)

  • Heungtae Kim;Hongsig Kang;Kusik Jeong;Kwangkuk Ahn
    • Journal of the Korean GEO-environmental Society
    • /
    • v.24 no.9
    • /
    • pp.33-40
    • /
    • 2023
  • The lateral load which is applied to the pile foundation supporting the superstructure during an earthquake is divided into the inertia force of the upper structure and the kinematic force of the ground. The inertia force and the kinematic force could cause failure to the pile foundation through different complex mechanisms. So it is necessary to predict and evaluate interaction of the ground-pile-structure properly for the seismic design of the foundation. The interaction is affected by the lateral behavior of the structure, the length of the pile, the boundary conditions of the head, and the relative density of the ground. Confining pressure and ground stiffness change accordingly when the relative density changes, and it results that the coefficient of subgrade reaction varies depending on each system. Horizontal bearing behavior and capacity of the pile foundation vary depending on lateral load condition and relative density of the sandy soil. Therefore, the 1g shaking table tests were conducted to confirm the effect of the relative density of the dried sandy soil to dynamic behavior of the group pile supporting the superstructure. The result shows that, as the relative density increases, maximum acceleration of the superstructure and the pile cap increases and decreases respectively, and the slope of the p-y curve of the pile decreases.

Analysis of Dynamic Behavior on Group Piles in Two-Layered Sandy Ground (이층지반에 설치된 무리말뚝의 동적 거동 분석)

  • Heungtae Kim;Hongsig Kang;Kusik Jeong;Kwangkuk Ahn
    • Journal of the Korean GEO-environmental Society
    • /
    • v.24 no.10
    • /
    • pp.51-58
    • /
    • 2023
  • The dynamic behavior of the group piles supporting the superstructure in an earthquake is influenced by different complex dynamic mechanisms by the inertia force of the superstructure and the kinematic force of the ground. In an earthquake, The dynamic p-y curve is used to analyze the dynamic behavior of the pile foundation in consideration of the interaction of the ground, pile foundation, and superstructure due to the inertia force and the kinematic force. Most of the research has been conducted in order to confirm the dynamic p-y curve of the pile foundation by applying to the pile foundation installed on the single layered ground consisting of sand and clay, but the research for the multiple layered ground is insufficient. In this study, 1g shaking table tests were conducted to analyze the effect of the strata ratio of the top and bottom ground of the two layered sandy ground which has different relative densities on the dynamic behavior of group piles supporting the superstructure. The result shows that the maximum acceleration in the ground, the pile cap, and the superstructure increases as the strata ratio increases, and the location of the maximum bending moment of the pile foundation is changed. In addition, it was confirmed that the slope of the dynamic p-y curve of the pile foundation increased and decreased according to the strata ratio.

Bolted Bonding Method of Steel Pipe Pile and Cap (볼트식 강관말뚝 머리보강 방법)

  • 박영호;김성환;장용채
    • Geotechnical Engineering
    • /
    • v.14 no.6
    • /
    • pp.57-71
    • /
    • 1998
  • Present bonding methods which connect steel pipe and spread footing in pile foundation have been generally used. These methods however showed lots of difficulties in the quality control. A new bonding method, which is called 'Bolted Bonding Method(BBM)' , is developed. This method uses factory-made parts so that it may increase the degree of quality, and workability, and is being adopted in the Held concerned. The method is verified by the structural analysis and laboratory test and then a new design formula is proposed. In addition, a comparison test of the present methods and BBM are conducted to observe the applicability and economy of the latter. As results, it is observed that BBM shows 5 to 10 times faster in Held work and 9% to 50% cheaper in construction cost than the existing methods.

  • PDF

An Ergonomic Study of the Sleeve Pattern According to Arm Movement -on Expansion and Contraction of the Skin Surface of the Arm- (팔의 동작에 따른 소매 원형의 인간공학적 연구 -팔의 피부면 신축을 중심으로-)

  • 함옥상
    • Journal of the Korean Home Economics Association
    • /
    • v.19 no.3
    • /
    • pp.21-32
    • /
    • 1981
  • Clothing must have the individual beauty and the function that one can do one's body movement freely. therefore, from the human engineering view point, the exact measurement of the human body and the analysis of it's results must be applied to clothing because the arm works most. In this study, the skin surface of arm was investigated by shell made of Alginate of each movement. And by sometic method the rate of expansion and contraction of each section, inter-relation among the bust girth, axillary arm girth and scye girth and between the shoulder length right and the under axilla waist length were calculate4d. With these results, cap height, breadth of a sleeve and arm hole girth of existing sleeve pattern have been compared and analysed. The results are as follows; 1) According to the developmental figures of shell, the whole area change was small but that of shape was remarkable in M 4, 9, 13. The change of the Block 1 was particular. 2) Over arm length was contracted in all movements except M6 and under arm length expanded. The changes of sections a, b, c are large, while those of sections d, e are small. 3) In terms of latitudes, change of fore-arm region was small. The rate of scye girth varied from 14.3% of M13 to-5.6% of M2. The breadth of a sleeve expanded in all movements, and especially the front region expanded more than the back. 4) The relation between the shoulder length right and under axilla waist length, in all occasions, was contracted mutually, and one contracted, the other expanded. Therefore, in clothing construction when we consider the function of the arm it is better to widen the arm hole and the breadth of a sleeve at the same time than no widen the shoulder length by lowering the upper part of the upper side seam line.

  • PDF